Wind turbine O&MSahyadriakshay6 variants
SampleServiceWind turbine O&M Sahyadriakshay · SAH-2B5 series
- Fleet size
- 5 turbines to 150 turbines (see variants)
- Scope
- Scheduled maintenance only
- Turbine class
- Up to 1.5 MW
- Availability guarantee
- 97% availability
- Technician team
- Site manager plus 2 technicians per 5 turbines
Lead time Takeover in 4-6 weeks · Warranty Work warranty 6 months · MOQ 1 nos
Training & certification (electrical licence, work at height)Indraprasthajyoti4 variants
SampleServiceTraining & certification (electrical licence, work at height) Indraprasthajyoti · IND-277 series
- Course duration
- 2 days to 10 days (see variants)
- Programme
- Fire safety
- Mode
- Hybrid
- Batch size
- 20 participants
- Certification
- Training completion certificate
Lead time Next batch in 2-4 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Grid connectivity & GNA applicationsTungabhadra3 variants
SampleServiceGrid connectivity & GNA applications Tungabhadra · TUN-F35 series
- Capacity applied
- 50 MW to 250 MW (see variants)
- Application
- Both
- Scope
- End-to-end liaison
- Bank guarantee
- Arranged through partner bank
- Studies
- Detailed power system study
Lead time Grant 3-9 months · Warranty Rework of deficient applications · MOQ 1 application
Skilled technicians & electriciansMagadhflux6 variants
SampleServiceSkilled technicians & electricians Magadhflux · MAG-523 series
- Team size
- 5 persons to 200 persons (see variants)
- Trade
- Solar installer
- Qualification
- Licensed wireman
- Experience
- 5-10 years
- Compliance
- Contract labour licence
Lead time Deployment in 7-14 days · Warranty As per contract · MOQ 1 man-month
Supply-chain / invoice financeCoorg6 variants
SampleServiceSupply-chain / invoice finance Coorg · COO-C61 series
- Programme limit
- INR 25 lakh to INR 100 crore (see variants)
- Structure
- TReDS platform
- Advance rate
- 80-85% of invoice
- Tenor
- Up to 180 days
- Recourse
- Without recourse
Lead time Funding in 24-72 hours after approval · Warranty As per programme terms · MOQ 1 job
E-waste managementCoorg5 variants
SampleServiceE-waste management Coorg · COO-DE7 series
- E-waste quantity
- 500 kg to 100 tonnes (see variants)
- Service
- EPR obligation fulfilment
- Categories
- Lighting
- Authorisation
- CPCB registered recycler
- Data destruction
- Certificate of data wipe
Lead time Certificate in 2-4 weeks · Warranty As per authorisation · MOQ 1 tonne
Right of way (RoW) & compensationPrakashtron6 variants
SampleServiceRight of way (RoW) & compensation Prakashtron · PRA-8C9 series
- Line length
- 5 km to 200 km (see variants)
- Scope
- Survey and valuation
- Compensation basis
- Per state rate notifications
- Records
- Tower-wise landowner register
- Grievance handling
- Dedicated desk
Lead time 3-12 months · Warranty As per contract · MOQ 1 km
Lender's engineer & TEV studiesSatpura6 variants
SampleServiceLender's engineer & TEV studies Satpura · SAT-BF9 series
- Project cost
- INR 25 crore to INR 1000 crore (see variants)
- Phase
- Construction monitoring
- Scope
- Technical, cost and schedule review
- Reporting
- Monthly progress report
- Site visits
- Monthly
Lead time 4-8 weeks for TEV · Warranty Report reliance letter to lenders · MOQ 1 report
EIA, ESG & environmental studiesMagadh4 variants
SampleServiceEIA, ESG & environmental studies Magadh · MAG-438 series
- Project scale
- Under 25 MW to 250 MW (see variants)
- Study
- Comprehensive EIA
- Baseline season
- Three seasons
- Deliverables
- Draft EIA, EMP, public hearing support
- Lab testing
- In-house lab
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Bank guarantees & surety bondsPushpakmax4 variants
SampleServiceBank guarantees & surety bonds Pushpakmax · PUS-228 series
- Guarantee amount
- INR 50 lakh to INR 25 crore (see variants)
- Instrument
- Standby letter of credit
- Purpose
- Retention
- Validity
- 12 months
- Margin
- 10-25%
Lead time Renewals 3 days · Warranty Verification letter provided · MOQ 1 job
Water testing laboratoriesDwarakaprakash3 variants
SampleServiceWater testing laboratories Dwarakaprakash · DWA-B77 series
- Parameter panel
- Physical and chemical 25 to Heavy metals panel (see variants)
- Sample type
- Cooling water
- Reporting
- Hard copy with seal
- Accreditation
- NABL accredited
- Turnaround
- 7 days
Lead time 7-10 days · Warranty Report valid for the sampled lot · MOQ 1 job
Arbitration & dispute resolutionMalwa5 variants
SampleServiceArbitration & dispute resolution Malwa · MAL-765 series
- Claim value
- INR 25 lakh to INR 100 crore (see variants)
- Forum
- High Court
- Services
- Representation
- Experts
- Delay and quantum expert
- Team
- Counsel plus associate
Lead time Case review in 1 week · Warranty Fee schedule agreed at start · MOQ 1 case
Statutory approvals (CEIG, pollution, forest)Ravipushpak6 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Ravipushpak · RAV-D95 series
- Approval package
- Single NOC to Transmission project set (12) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Drawing and application preparation
- Liaison
- Office liaison
- Statutory fee
- At actuals
Lead time Approval 4-24 weeks · Warranty Rework of rejected applications at no fee · MOQ 1 application
Feasibility studies & DPRHoysala6 variants
SampleServiceFeasibility studies & DPR Hoysala · HOY-BB9 series
- Project capacity
- 5 MW to 1 GW (see variants)
- Scope
- Feasibility with financial model
- Energy yield
- PVsyst P50/P90
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Civil & foundation worksShaktimax3 variants
SampleServiceCivil & foundation works Shaktimax · SHA-479 series
- Works volume
- 25 MW equivalent to 100 MW equivalent (see variants)
- Foundation type
- Ramming or screw pile
- Concrete grade
- M40 for turbine foundation
- Pull-out testing
- 2% piles tested
- Reinforcement
- Fe 500D TMT
Lead time 4-12 weeks execution · Warranty Pile load test certified · MOQ 1 job
Substation & line O&MKaveriohm3 variants
SampleServiceSubstation & line O&M Kaveriohm · KAV-059 series
- Voltage level
- 66 kV to 220 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 month
Title search & land documentationMunnar3 variants
SampleServiceTitle search & land documentation Munnar · MUN-2C5 series
- Parcels covered
- 25 parcels to 100 parcels (see variants)
- Search depth
- Back to root of title
- Deliverables
- Opinion with chain of title and encumbrance
- Records checked
- Court and RERA databases
- Registration
- Drafting plus registration support
Lead time First opinion in 5-7 days · Warranty Opinion valid as on search date · MOQ 1 case
Testing & commissioningSatavahanakelvin6 variants
SampleServiceTesting & commissioning Satavahanakelvin · SAT-A87 series
- Plant capacity
- 1 MW to 100 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Relay test set, thermal camera
- Calibration
- Calibration valid at test date
- Team
- Lead plus 5 member crew
Lead time 1-2 weeks on site · Warranty As per contract · MOQ 1 MW
Live-line & hot-line washingKaveriohm4 variants
SampleServiceLive-line & hot-line washing Kaveriohm · KAV-347 series
- Voltage level
- 66 kV to 400 kV (see variants)
- Method
- Dry ice blasting
- Resistivity of water
- Above 5000 ohm-cm
- Scope
- Per km of line
- Frequency
- Pre- and post-monsoon
Lead time Permit based scheduling · Warranty Rewash if flashover within 30 days · MOQ 1 job
Site acceptance & pre-commissioning testsKakatiya5 variants
SampleServiceSite acceptance & pre-commissioning tests Kakatiya · KAK-626 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Packing & cratingDeepmark6 variants
SampleServicePacking & crating Deepmark · DEE-DD1 series
- Packing volume
- 5 CBM to 500 CBM (see variants)
- Material
- Steel frames
- Protection
- Shock absorption foam
- Marking
- Project-specific labelling
- Packing list
- Itemised with weights
Lead time Large lots 10 days · Warranty As per terms · MOQ 1 lot
Arbitration & dispute resolutionPhasetron3 variants
SampleServiceArbitration & dispute resolution Phasetron · PHA-768 series
- Claim value
- INR 1 crore to INR 25 crore (see variants)
- Forum
- Ad hoc arbitration
- Services
- Claim drafting
- Experts
- Technical expert
- Team
- Counsel plus associate
Lead time Case review in 1 week · Warranty Professional indemnity · MOQ 1 case
Motor & transformer rewindingKonarksamarth5 variants
SampleServiceMotor & transformer rewinding Konarksamarth · KON-D21 series
- Machine rating
- Up to 30 kW to 1 MVA transformer (see variants)
- Equipment
- Alternator
- Conductor
- Copper
- Insulation class
- Class F
- Process
- Dip and bake
Lead time 2-4 weeks · Warranty 6 months on repair · MOQ 1 nos
Electrical safety auditsKrishna3 variants
SampleServiceElectrical safety audits Krishna · KRI-681 series
- Installed load
- 500 kVA to 5 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site