Cable trays & laddersKamrup6 variants
SampleCable trays & ladders Kamrup · KAM-549 series
- Width
- 100 mm to 900 mm (see variants)
- Type
- Trough
- Material
- FRP
- Finish
- Pre-galvanised
- Thickness
- 3.0 mm
Lead time 1-2 weeks · Warranty As per manufacturer · MOQ 2 m
Concrete batching & transit mixersKavachline4 variants
SampleFor rentConcrete batching & transit mixers Kavachline · KAV-CC5 series
- Output capacity
- Batching plant 30 cu m/h to Boom pump 60 cu m/h (see variants)
- Drum capacity
- 6 cu m
- Type
- Self loading
- Operator
- Not included
- Fuel
- Included
Lead time 2-3 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Statutory approvals (CEIG, pollution, forest)Munnar4 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Munnar · MUN-528 series
- Approval package
- 3 approvals to Wind park set (10) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Self-certification and fee payment
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application
Weather monitoring stationsLonavalatamra5 variants
SampleWeather monitoring stations Lonavalatamra · LON-423 series
- Configuration
- Basic: GHI + ambient temp to Wind mast 40 m (see variants)
- Pyranometer class
- Class A (secondary standard)
- Wind sensor
- Cup anemometer
- Temperature sensor
- PT100 class A
- Humidity range
- 0-100% RH
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 5 set
Meter test benches & CMRIHampi6 variants
SampleMeter test benches & CMRI Hampi · HAM-693 series
- Capacity
- CMRI handheld to 3-ph 6-position 0.05 (see variants)
- Reference accuracy
- 0.02%
- Voltage range
- 57.7-480 V
- Current range
- 0.001-100 A
- Source type
- Programmable electronic source
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 10 nos
Switches, sockets & modular platesMadurai4 variants
SampleSwitches, sockets & modular plates Madurai · MAD-F23 series
- Module
- 2M to 6M (see variants)
- Item
- Switch
- Current rating
- 16 A
- Rated voltage
- 240 V AC
- Switch type
- Intermediate
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 nos
Biogas digesters & CBG upgradingCoromandel4 variants
SampleBiogas digesters & CBG upgrading Coromandel · COR-A84 series
- Plant capacity
- 1000 m3/day to 10 TPD CBG (see variants)
- Feedstock
- Poultry litter
- Digester type
- Covered lagoon
- Retention time
- 35 days
- Upgrade technology
- Water scrubbing
Lead time 24-36 weeks · Warranty 24 months on mechanicals · MOQ 1 lot
Hydrogen sensors & safety systemsArctron4 variants
SampleHydrogen sensors & safety systems Arctron · ARC-AB7 series
- Detection range
- 0-1000 ppm to 0-100% vol (see variants)
- Sensor type
- Semiconductor
- Output
- Relay
- Response time T90
- < 30 s
- Accuracy
- +/- 2% of FS
Lead time 2-4 weeks · Warranty 24 months · MOQ 1 nos
Transformer overhaul & oil filtrationKaveriohm3 variants
SampleServiceTransformer overhaul & oil filtration Kaveriohm · KAV-795 series
- Transformer rating
- 1 MVA to 10 MVA (see variants)
- Service
- Oil filtration and dehydration
- Filtration machine
- Mobile 12000 L/hr
- Oil BDV target
- Above 60 kV
- Moisture target
- Below 10 ppm
Lead time Mobilisation in 3-5 days · Warranty Workmanship 12 months · MOQ 1 nos
Transformer oil filtration plantsDoaba5 variants
SampleFor rentTransformer oil filtration plants Doaba · DOA-668 series
- Flow rate
- 300 lph to 6000 lph (see variants)
- Vacuum level
- Below 0.1 mbar
- Heater power
- 18 kW
- Outlet moisture
- Below 3 ppm
- Outlet BDV
- Above 80 kV
Lead time 1-3 days · Warranty Replacement unit within 48 h · MOQ 1 nos
Railway & signalling cablesKrishna3 variants
SampleRailway & signalling cables Krishna · KRI-0E8 series
- Cores
- 19C x 1.5 sq mm to 30C x 1.5 sq mm (see variants)
- Conductor
- Annealed copper
- Insulation
- Polyethylene
- Screen
- Aluminium-Mylar
- Armour
- Galvanised steel wire
Lead time 2-3 weeks · Warranty As per RDSO / contract · MOQ 2 m
Wind resource assessment (met masts, LiDAR, SoDAR)Brahmaputrahertz3 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Brahmaputrahertz · BRA-FF1 series
- Measurement height
- 100 m to 140 m (see variants)
- Instrument type
- SoDAR
- Mast construction
- Tubular guyed
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 6
Lead time 8-12 weeks · Warranty 12 months · MOQ 5 set
Factory acceptance test (FAT) witnessingMahanadi5 variants
SampleServiceFactory acceptance test (FAT) witnessing Mahanadi · MAH-DF3 series
- Equipment value
- INR 50 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine plus special tests
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Wind resource assessment (met masts, LiDAR, SoDAR)Aravalikiran4 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Aravalikiran · ARA-C17 series
- Measurement height
- 100 m to 200 m (see variants)
- Instrument type
- Met mast
- Mast construction
- Tubular guyed
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 6
Lead time 8-12 weeks · Warranty 24 months on logger and sensors · MOQ 1 set
Industrial & hazardous-area lightingMysorespark6 variants
SampleIndustrial & hazardous-area lighting Mysorespark · MYS-DC5 series
- Wattage
- 20 W to 200 W (see variants)
- Protection concept
- Ex d flameproof
- Gas group
- IIA
- Zone
- Zone 21
- Temperature class
- T5
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos
Tower parts, bolts & nutsTaptishakti4 variants
SampleTower parts, bolts & nuts Taptishakti · TAP-B55 series
- Bolt size
- M16 to M30 (see variants)
- Strength class
- 8.8
- Material
- High tensile steel
- Galvanising
- Hot-dip, 75 micron
- Thread
- Metric coarse
Lead time 5-6 weeks · Warranty 12 months · MOQ 10 MT
Aerial work platforms & boom liftsKrishnaamrit5 variants
SampleFor rentAerial work platforms & boom lifts Krishnaamrit · KRI-818 series
- Working height
- 10 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 230 kg
- Drive
- Electric
- Outreach
- 5 m
- Insulation
- Not insulated
Lead time 3-5 days · Warranty Replacement within 48 h · MOQ 1 nos
Wind turbine O&MMaduraisurya3 variants
SampleServiceWind turbine O&M Maduraisurya · MAD-1B9 series
- Fleet size
- 5 turbines to 20 turbines (see variants)
- Scope
- Availability based O&M
- Turbine class
- 3 MW and above
- Availability guarantee
- 97% availability
- Technician team
- Site manager plus 2 technicians per 5 turbines
Lead time Mobilisation of crew 2 weeks · Warranty Availability guarantee with LD · MOQ 1 nos
GPS clocks & time synchronisationNarmada5 variants
SampleGPS clocks & time synchronisation Narmada · NAR-AC2 series
- Output set
- NTP only to PTP + IRIG-B + PPS + serial (see variants)
- Time source
- GPS
- Accuracy
- ±100 ns
- Network protocols
- PTP IEEE 1588 v2
- PTP profile
- Power profile C37.238
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 2 nos
Solar cells, wafers & ingotsTirhut3 variants
SampleSolar cells, wafers & ingots Tirhut · TIR-405 series
- Format
- G12 210 mm to G12 half-cell (see variants)
- Cell type
- TOPCon
- Cell efficiency
- 23.6%
- Wafer thickness
- 130 micron
- Conductivity type
- P-type boron
Lead time 4-8 weeks · Warranty 6 months from supply · MOQ 1 nos
Biomass boilers & gasifiersBetwatrishul5 variants
SampleBiomass boilers & gasifiers Betwatrishul · BET-3F4 series
- Capacity
- 1 TPH to 20 TPH (see variants)
- Fuel
- Rice husk
- Steam pressure
- 67 bar
- Firing system
- Dumping grate
- Efficiency
- 86%
Lead time 10-14 weeks · Warranty 18 months from supply · MOQ 1 nos
Earth pits, chambers & enhancing compoundsMalabar3 variants
SampleEarth pits, chambers & enhancing compounds Malabar · MAL-CF5 series
- Type / size
- Compound 10 kg bag to Compound 50 kg bag (see variants)
- Chamber material
- HDPE
- Cover load rating
- Class A (light)
- Compound type
- Hydrophilic gel
- Resistivity
- < 0.2 Ω·m
Lead time 1-2 weeks · Warranty As per manufacturer, 5 years life · MOQ 1 nos
Guarding & security servicesGupta3 variants
SampleServiceGuarding & security services Gupta · GUP-147 series
- Guards deployed
- 10 guards to 50 guards (see variants)
- Guard type
- Ex-servicemen
- Shifts
- 8-hour 3 shifts
- Supervision
- Field officer per 20 guards
- Licence
- PSARA licence
Lead time 1-2 weeks · Warranty As per contract · MOQ 1 month
Module cleaning systemsVindhya4 variants
SampleModule cleaning systems Vindhya · VIN-837 series
- Plant capacity covered
- 100 kWp to 5 MWp (see variants)
- Cleaning method
- Waterless
- Drive
- Battery electric
- Row length handled
- Up to 40 m
- Cleaning speed
- 20 m/min
Lead time 4-6 weeks · Warranty 24 months on drive unit · MOQ 10 set