PCC, MCC, ACDB, DCDBNilgirisudarshan6 variants
SamplePCC, MCC, ACDB, DCDB Nilgirisudarshan · NIL-109 series
- Rating
- 400 A to 4000 A (see variants)
- Panel type
- DCDB
- System voltage
- 110 V DC
- Short-circuit rating
- 25 kA/1 s
- Form of separation
- Form 2b
Lead time 3-4 weeks · Warranty 18 months from supply · MOQ 1 nos
Synchronising panelsElloraparam4 variants
SampleSynchronising panels Elloraparam · ELL-441 series
- Gensets in parallel
- 2 gensets to 6 gensets (see variants)
- Bus rating
- 4000 A
- Voltage
- 415 V
- Fault level
- 85 kA
- Controller
- Genset controller per set
Lead time 8-12 weeks · Warranty 12 months · MOQ 10 nos
Module cleaning systemsGodavari6 variants
SampleModule cleaning systems Godavari · GOD-BF2 series
- Plant capacity covered
- 100 kWp to 50 MWp (see variants)
- Cleaning method
- Water spray with brush
- Drive
- Manual
- Row length handled
- Up to 100 m
- Cleaning speed
- 6 m/min
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 2 set
Coal & ash handling plantPataliputraneel5 variants
SampleCoal & ash handling plant Pataliputraneel · PAT-2D2 series
- Handling capacity
- 100 TPH to 2400 TPH (see variants)
- Equipment
- Belt conveyor
- Belt width
- 650 mm
- Belt speed
- 1.6 m/s
- Belt grade
- Fire-resistant ST
Lead time 12-18 months · Warranty 12 months · MOQ 1 lot
Surveys (topo, geotech, drone)Hoysala5 variants
SampleServiceSurveys (topo, geotech, drone) Hoysala · HOY-629 series
- Survey area
- 50 acres to 1000 acres (see variants)
- Survey method
- DGPS and total station
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Contour map, DEM, CAD plan
- Geotech boreholes
- As per project requirement
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Steel structuresHertzgen6 variants
Hertzgen · HER-C28 series
- Structure weight class
- 0.5 MT lot to 25 MT lot (see variants)
- Material grade
- IS 2062 E250 BR
- Galvanising coating
- 610 g/sq m
- Section type
- Mixed
- Bolt grade
- 10.9
Lead time 5-7 weeks · Warranty 24 months against coating failure · MOQ 1 MT
First aid & emergency showersSatavahana3 variants
SampleFirst aid & emergency showers Satavahana · SAT-427 series
- Type / size
- Kit for 10 persons to Kit for 50 persons (see variants)
- Cabinet material
- Powder-coated steel
- Contents
- Dressings, burn gel, antiseptics, splints
- Eye wash flow
- 11.4 L/min for 15 min
- Shower flow
- 75 L/min
Lead time 1-2 weeks · Warranty 24 months · MOQ 1 nos
Flow batteriesTirhuttamra3 variants
Tirhuttamra · TIR-F31 series
- Discharge duration
- 4 hours to 8 hours (see variants)
- Chemistry
- Vanadium redox
- Rated power
- 50 kW
- Round-trip efficiency
- 70-75%
- Cycle life
- 15000 cycles
Lead time 16-20 weeks · Warranty 10 years performance · MOQ 10 kWh
First aid & emergency showersJalmark3 variants
SampleFirst aid & emergency showers Jalmark · JAL-1B6 series
- Type / size
- Kit for 25 persons to Eye wash portable 16 L (see variants)
- Cabinet material
- ABS plastic
- Contents
- Dressings, burn gel, antiseptics, splints
- Eye wash flow
- 11.4 L/min for 15 min
- Shower flow
- 75 L/min
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 nos
Ex junction boxes & cable glandsNalandaloha3 variants
SampleEx junction boxes & cable glands Nalandaloha · NAL-584 series
- Size
- Gland M20 to Gland M32 (see variants)
- Protection type
- Ex eb IIC
- Enclosure material
- Aluminium
- Gland material
- SS 316
- Cable type
- Armoured
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
LOTO kits & signageHampitamra3 variants
SampleLOTO kits & signage Hampitamra · HAM-0A8 series
- Kit size
- Group box 10 locks to Plant LOTO station (see variants)
- Padlocks
- Keyed different
- Padlock body
- Aluminium
- Shackle
- 6 mm steel
- Breaker lockouts
- MCB, MCCB, ACB
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 set
Ethanol & biofuel plant equipmentVidarbha5 variants
SampleEthanol & biofuel plant equipment Vidarbha · VID-F44 series
- Plant capacity
- 60 KLPD to 300 KLPD (see variants)
- Feedstock
- Grain
- Distillation
- Multi-pressure
- Dehydration
- Molecular sieve
- Product purity
- 99.5% v/v
Lead time 10-14 months · Warranty 12 months · MOQ 5 lot
Voltage detectors & discharge / earthing rodsJhelumdeep3 variants
SampleVoltage detectors & discharge / earthing rods Jhelumdeep · JHE-F44 series
- Voltage range
- 66 kV to 220 kV (see variants)
- Type
- Discharge rod
- Indication
- Audio-visual alarm
- Self-test
- Yes
- Insulating stick
- Telescopic, FRP
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Railway & signalling cablesNilgiri6 variants
SampleRailway & signalling cables Nilgiri · NIL-074 series
- Cores
- 6C x 1.5 sq mm to 30C x 1.5 sq mm (see variants)
- Conductor
- Annealed copper
- Insulation
- Polyethylene
- Screen
- None
- Armour
- Galvanised steel strip
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 2 m
SF6 gas & handlingSatpura5 variants
Satpura · SAT-AE6 series
- Cylinder size
- 5 kg to 50 kg (see variants)
- Purity
- 99.995%
- Moisture
- Below 15 ppmv
- Cylinder
- Seamless steel
- Valve
- DIN 477
Lead time 3-4 weeks · Warranty Test certificate per cylinder · MOQ 1 kg
Torque wrenches & bolt tensioningMagadhrajat4 variants
SampleTorque wrenches & bolt tensioning Magadhrajat · MAG-546 series
- Torque range
- 20-100 Nm to 500-3000 Nm (see variants)
- Type
- Digital
- Drive size
- 1 inch
- Accuracy
- +/-3%
- Length
- 300 mm
Lead time 3-5 weeks · Warranty Re-calibration after 5000 cycles · MOQ 10 set
Power-exchange trading servicesVidarbha5 variants
SampleServicePower-exchange trading services Vidarbha · VID-8A9 series
- Traded volume
- 1 MU per month to 50 MU per month (see variants)
- Segment
- Term-ahead market
- Licence
- Through electricity trader
- Margin
- Fixed monthly fee
- Bidding
- Algorithmic bidding
Lead time Onboarding in 2-3 weeks · Warranty Settlement accuracy · MOQ 1 month
Ex motorsNalandaloha3 variants
Nalandaloha · NAL-B93 series
- Rating
- 37 kW to 132 kW (see variants)
- Protection type
- Ex nA
- Gas group
- IIB
- Temperature class
- T4
- Poles
- 4
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Transmission line erection & stringingChola6 variants
SampleServiceTransmission line erection & stringing Chola · CHO-E14 series
- Voltage level
- 11 kV to 400 kV (see variants)
- Circuit type
- Single circuit
- Conductor
- AAAC or HTLS
- Scope
- Foundation, erection and stringing
- Stringing method
- Conventional stringing
Lead time Material availability dependent · Warranty Defect liability 24 months · MOQ 1 km
Cable compounds (XLPE, PVC, LSZH)Kaverigaruda5 variants
SampleCable compounds (XLPE, PVC, LSZH) Kaverigaruda · KAV-AE3 series
- Voltage application
- 1.1 kV to 132 kV (see variants)
- Compound type
- Semi-con
- Cross-linking
- Silane
- Melt flow index
- 2 g/10 min
- Colour
- Natural
Lead time 1-2 weeks · Warranty 12 months shelf life in sealed pack · MOQ 1 kg
Aerial work platforms & boom liftsTaxilaflux5 variants
SampleFor rentAerial work platforms & boom lifts Taxilaflux · TAX-767 series
- Working height
- 10 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 450 kg
- Drive
- Diesel
- Outreach
- 16 m
- Insulation
- Not insulated
Lead time 1-2 days · Warranty Replacement within 48 h · MOQ 1 nos
Servo stabilisers & isolation transformersTungabhadrasamarth3 variants
SampleServo stabilisers & isolation transformers Tungabhadrasamarth · TUN-585 series
- Rating
- 10 kVA to 50 kVA (see variants)
- Primary voltage
- 415 V
- Secondary voltage
- 110 V
- Phases
- 1-ph
- Winding
- Copper
Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 1 nos
ERP, project & document managementKamrup3 variants
SampleERP, project & document management Kamrup · KAM-9E1 series
- Users
- 100 users to 500 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 10-16 weeks · Warranty Support with AMC · MOQ 1 licence
Water storage & pumpingSudarshangen4 variants
SampleWater storage & pumping Sudarshangen · SUD-646 series
- Motor rating
- 1.5 kW to 15 kW (see variants)
- Pump type
- End suction
- Head
- 20 m
- Flow
- 50 cu m/h
- Casing material
- Cast iron
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos