Housekeeping & cleaning suppliesAjanta5 variants
SampleHousekeeping & cleaning supplies Ajanta · AJA-2E1 series
- Pack size
- 5 litre to 1000 litre (see variants)
- Product type
- Detergent
- pH
- 9-11
- Dilution
- 1:10
- Residue
- Biodegradable
Lead time 3-7 days · Warranty 24 months shelf life in sealed pack · MOQ 2 nos
Gas detectors & confined-space kitsUjjayinivolt3 variants
SampleGas detectors & confined-space kits Ujjayinivolt · UJJ-BE9 series
- Configuration
- Single gas (H2S) to 4-gas (O2, LEL, CO, H2S) (see variants)
- Gases
- O2
- Sensor type
- NDIR
- Alarm
- Audio, visual, vibration
- Display
- LCD backlit
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Cable compounds (XLPE, PVC, LSZH)Nalanda3 variants
SampleCable compounds (XLPE, PVC, LSZH) Nalanda · NAL-6C8 series
- Voltage application
- 66 kV to 220 kV (see variants)
- Compound type
- XLPE
- Cross-linking
- Silane
- Melt flow index
- 2 g/10 min
- Colour
- Red
Lead time 3-4 weeks · Warranty 12 months shelf life in sealed pack · MOQ 2 kg
Traction substations & transformersTaxila3 variants
SampleTraction substations & transformers Taxila · TAX-919 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Auto-transformer
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Charging management softwareHoysala5 variants
SampleServiceCharging management software Hoysala · HOY-5B6 series
- Charge points
- Up to 25 to Up to 10000 (see variants)
- Deployment
- On-premise
- OCPP versions
- 2.0.1
- Payments
- Card
- Roaming
- OCPI 2.2
Lead time 1-2 weeks · Warranty As per SLA · MOQ 1 licence
Solar productive-use appliances (cold rooms, mills, dryers)Tirhut5 variants
SampleSolar productive-use appliances (cold rooms, mills, dryers) Tirhut · TIR-5C4 series
- Capacity
- 2 MT to 30 MT (see variants)
- Appliance type
- Dryer
- Solar array
- 5 kWp
- Storage temperature
- 2-8 C
- Insulation
- Glass wool
Lead time 6-10 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Digital twins & analyticsSatavahana4 variants
SampleDigital twins & analytics Satavahana · SAT-004 series
- Plant size
- Up to 10 MW to Up to 250 MW (see variants)
- Deployment
- Hybrid edge
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 3-4 weeks · Warranty Subscription support · MOQ 1 licence
Statutory approvals (CEIG, pollution, forest)Satpura6 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Satpura · SAT-5E2 series
- Approval package
- Single NOC to Transmission project set (12) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Self-certification and fee payment
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application
Pre-engineered buildings (PEB)Shivalikgrid4 variants
SamplePre-engineered buildings (PEB) Shivalikgrid · SHI-EF4 series
- Clear span
- 12 m to 24 m (see variants)
- Primary frame
- Built-up tapered I-section
- Steel grade
- IS 2062 E350
- Roof sheeting
- 0.5 mm Galvalume
- Wall cladding
- 0.45 mm PPGI
Lead time 8-12 weeks · Warranty 10 years structural · MOQ 10 sq m
Building energy management systems (BEMS)Ravinandi5 variants
SampleBuilding energy management systems (BEMS) Ravinandi · RAV-173 series
- Monitored points
- 100 points to 2500 points (see variants)
- Protocols
- BACnet, LonWorks, OPC
- Metering
- Utility meter integration
- Controls
- Lighting and chiller control
- Dashboard
- Web and mobile
Lead time Supply in 4-6 weeks · Warranty Software support 12 months · MOQ 2 nos
Street lightsSabarmativayu6 variants
Sabarmativayu · SAB-EA8 series
- Wattage
- 45 W to 200 W (see variants)
- Luminous efficacy
- 150 lm/W
- Colour temperature
- 4000 K
- CRI
- Above 80
- Ingress protection
- IP66
Lead time 2-3 weeks · Warranty 60 months from supply · MOQ 2 nos
Pre-engineered buildings (PEB)Hertzgen3 variants
SamplePre-engineered buildings (PEB) Hertzgen · HER-B69 series
- Clear span
- 15 m to 24 m (see variants)
- Primary frame
- Built-up tapered I-section
- Steel grade
- IS 2062 E250
- Roof sheeting
- 0.5 mm PPGI
- Wall cladding
- 0.45 mm PPGI
Lead time 8-12 weeks · Warranty 10 years structural · MOQ 5 sq m
Connectors & terminal blocksMunnar4 variants
SampleConnectors & terminal blocks Munnar · MUN-5F9 series
- Rating
- 2.5 mm² / 24 A to 10 mm² / 57 A (see variants)
- Connection type
- Spring cage
- Rated voltage
- 1000 V
- Housing material
- PBT
- Conductor material
- Tinned copper
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Stringing machinesKaveri4 variants
Kaveri · KAV-414 series
- Maximum tension
- 15 kN to 75 kN (see variants)
- Type
- Puller
- Drive
- Diesel hydraulic
- Bullwheel diameter
- 2200 mm
- Conductor size
- ACSR Moose
Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Servo stabilisers & isolation transformersDeccan6 variants
SampleServo stabilisers & isolation transformers Deccan · DEC-0B8 series
- Rating
- 5 kVA to 250 kVA (see variants)
- Primary voltage
- 380-440 V
- Secondary voltage
- 415 V
- Phases
- 1-ph
- Winding
- Copper
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 10 nos
MCB distribution boardsMadurai3 variants
SampleMCB distribution boards Madurai · MAD-289 series
- Ways
- 4-way to 8-way (see variants)
- Type
- SPN
- Incomer
- MCCB 100 A
- Rated current
- 63 A
- Rated voltage
- 240 V
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
IoT & remote monitoringLonavalatamra4 variants
SampleIoT & remote monitoring Lonavalatamra · LON-992 series
- Channels / points
- 8 inputs to 64 inputs (see variants)
- Connectivity
- Ethernet + 4G
- Protocols
- Modbus RTU/TCP
- Serial ports
- 2 x RS-485
- Digital I/O
- 4 DI / 2 DO
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 2 nos
Lightning arresters (ESE, conventional)Vidyutmax4 variants
SampleLightning arresters (ESE, conventional) Vidyutmax · VID-0E6 series
- Protection radius (Level III)
- 55 m to 107 m (see variants)
- Type
- Franklin rod
- Advance time
- 45 µs
- Material
- Aluminium
- Mast
- 3 m GI pole
Lead time 2-3 weeks · Warranty 36 months · MOQ 10 nos
EarthwirePrakashtek3 variants
Prakashtek · PRA-B25 series
- Size
- 7/3.15 mm to 7/4.0 mm (see variants)
- Type
- Alumoweld
- Strands
- 7
- Tensile strength
- 70 kN
- Fibres
- 24
Lead time 8-12 weeks · Warranty 24 months · MOQ 2 km
Compact secondary substationsSamarthtek3 variants
SampleCompact secondary substations Samarthtek · SAM-326 series
- Transformer rating
- 630 kVA to 1600 kVA (see variants)
- Primary voltage
- 22 kV
- Secondary voltage
- 0.433 kV
- HV equipment
- VCB panel
- Transformer type
- Cast resin dry
Lead time 6-8 weeks · Warranty 18 months · MOQ 1 nos
Condition monitoring systems (CMS)Ojasgen4 variants
SampleCondition monitoring systems (CMS) Ojasgen · OJA-535 series
- Channels
- 4 channels to 16 channels (see variants)
- Sensor type
- IEPE accelerometer
- Sampling rate
- 25.6 kHz
- Frequency range
- 0.1 Hz-10 kHz
- Data storage
- Cloud
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 set
Green open access & REC tradingKakatiya6 variants
SampleServiceGreen open access & REC trading Kakatiya · KAK-6B3 series
- Consumption
- 1 MW to 100 MW (see variants)
- Mechanism
- Group captive
- Source
- Wind
- Services
- Supplier search
- REC handling
- Trading on exchange
Lead time Study in 2 weeks · Warranty As per contract · MOQ 1 job
Simulators & e-learningVidarbha3 variants
SampleServiceSimulators & e-learning Vidarbha · VID-6A9 series
- Licensed users
- 25 users to 100 users (see variants)
- Product type
- VR headset based
- Content
- PV design and O&M
- Languages
- Regional languages
- Assessment
- Quizzes and scored simulations
Lead time Deployment in 2-3 weeks · Warranty Bug fixes at no cost · MOQ 1 nos
Gas-based suppressionNilgiri4 variants
SampleGas-based suppression Nilgiri · NIL-346 series
- Protected volume
- 50-150 m³ to 1000-3000 m³ (see variants)
- Agent
- IG-541
- Cylinder pressure
- 25 bar
- Discharge time
- 10 seconds
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 2 set