Energy-efficient appliances (BEE star rated)Beasphase3 variants
SampleEnergy-efficient appliances (BEE star rated) Beasphase · BEA-731 series
- Capacity or rating
- 1.5 ton AC to 3 ton cassette AC (see variants)
- BEE star rating
- 5 star
- Technology
- Fixed speed
- ISEER
- 5.5
- Refrigerant
- R290
Lead time Bulk lots 3-4 weeks · Warranty Product 1-3 years · MOQ 1 nos
Energy-efficient appliances (BEE star rated)Jhelum6 variants
SampleEnergy-efficient appliances (BEE star rated) Jhelum · JHE-A95 series
- Capacity or rating
- 1 ton AC to 10 ton VRF unit (see variants)
- BEE star rating
- 3 star
- Technology
- Fixed speed
- ISEER
- 4.5
- Refrigerant
- R32
Lead time Delivery in 5-10 days · Warranty Product 1-3 years · MOQ 1 nos
Operational all-risk & machinery breakdown insuranceMadurai3 variants
SampleServiceOperational all-risk & machinery breakdown insurance Madurai · MAD-A34 series
- Sum insured
- INR 5 crore to INR 50 crore (see variants)
- Policy
- Operational all-risk
- Business interruption
- Loss of revenue cover
- Deductible
- Standard
- Perils
- Breakdown, theft, vandalism
Lead time Quote in 3-5 days · Warranty Claims support · MOQ 1 job
Carbon credits & offsetsPushpakmax3 variants
SampleServiceCarbon credits & offsets Pushpakmax · PUS-F72 series
- Annual credits
- 5,000 tCO2e to 50,000 tCO2e (see variants)
- Programme
- Voluntary market
- Project type
- Renewable energy
- Methodology
- Baseline development
- MRV
- Annual report
Lead time Registration 6-18 months · Warranty As per contract · MOQ 1 job
Transformer & scrap disposalCoorg6 variants
SampleServiceTransformer & scrap disposal Coorg · COO-431 series
- Scrap quantity
- 1 tonne to 500 tonnes (see variants)
- Scrap type
- Switchgear
- Process
- Oil draining and treatment
- Authorisation
- Hazardous waste permit
- PCB testing
- Not applicable
Lead time Processing 1-4 weeks · Warranty As per authorisation · MOQ 1 lot
Battery recycling & second lifePrithvimark4 variants
SampleServiceBattery recycling & second life Prithvimark · PRI-E42 series
- Quantity
- 5 tonnes to 100 tonnes (see variants)
- Chemistry
- LFP
- Process
- Hydrometallurgy
- Second life
- SoH test and grading
- Recovery rate
- 95% for metals
Lead time Processing 2-8 weeks · Warranty Authorisation copies available · MOQ 1 tonne
Operational all-risk & machinery breakdown insuranceTaxila6 variants
SampleServiceOperational all-risk & machinery breakdown insurance Taxila · TAX-4E6 series
- Sum insured
- INR 5 crore to INR 1000 crore (see variants)
- Policy
- Machinery breakdown
- Business interruption
- Gross profit cover
- Deductible
- Higher deductible, lower premium
- Perils
- Fire, lightning, natural catastrophe
Lead time Policy in 1 week · Warranty Cover as per policy · MOQ 1 job
Arbitration & dispute resolutionKiransys5 variants
SampleServiceArbitration & dispute resolution Kiransys · KIR-9B9 series
- Claim value
- INR 1 crore to INR 500 crore (see variants)
- Forum
- Ad hoc arbitration
- Services
- Claim drafting
- Experts
- Delay and quantum expert
- Team
- Counsel plus associate
Lead time Case review in 1 week · Warranty Professional indemnity · MOQ 1 case
Solar module recyclingPallavaprabha5 variants
SampleServiceSolar module recycling Pallavaprabha · PAL-147 series
- Quantity
- 10 tonnes to 1000 tonnes (see variants)
- Process
- Reuse testing
- Recovery rate
- 90%+
- Materials recovered
- Silicon, silver
- Authorisation
- Registered recycler
Lead time Pick-up in 7-14 days · Warranty Certificate of destruction · MOQ 1 tonne
PPA structuring & advisoryMewarkavach6 variants
SampleServicePPA structuring & advisory Mewarkavach · MEW-7A2 series
- Contract capacity
- 10 MW to 500 MW (see variants)
- PPA type
- Fixed tariff
- Counterparty
- SECI-type intermediary
- Deliverables
- Financial model and draft PPA
- Tenor
- 15 years
Lead time Kick-off in 1 week · Warranty Advice valid as of regulations at date · MOQ 1 job
PPA structuring & advisoryKanchiagni3 variants
SampleServicePPA structuring & advisory Kanchiagni · KAN-F48 series
- Contract capacity
- 5 MW to 25 MW (see variants)
- PPA type
- RTC / FDRE
- Counterparty
- SECI-type intermediary
- Deliverables
- Financial model and draft PPA
- Tenor
- 15 years
Lead time 3-8 weeks · Warranty As per contract · MOQ 1 job
Scheduling & forecasting (QCA)Kakatiya4 variants
SampleServiceScheduling & forecasting (QCA) Kakatiya · KAK-8D7 series
- Aggregated capacity
- 50 MW to 500 MW (see variants)
- Service
- Forecasting only
- Forecast horizon
- Day-ahead
- Accuracy
- Error under 8%
- Data input
- SCADA and weather models
Lead time Go-live after integration testing · Warranty Forecast accuracy guarantee with fee linkage · MOQ 1 MW
Demand responseTungabhadraneel5 variants
SampleServiceDemand response Tungabhadraneel · TUN-ED4 series
- Curtailable load
- 1 MW to 50 MW (see variants)
- Programme
- TOD optimisation
- Control
- Automated through SCADA
- Notice
- 2 hours
- Duration per event
- 4 hours
Lead time Assessment in 2-3 weeks · Warranty As per programme terms · MOQ 1 MW
Green open access & REC tradingPushpakmax4 variants
SampleServiceGreen open access & REC trading Pushpakmax · PUS-6B6 series
- Consumption
- 1 MW to 25 MW (see variants)
- Mechanism
- Green open access
- Source
- Solar
- Services
- Contract negotiation
- REC handling
- Registration with Grid-India
Lead time Study in 2 weeks · Warranty As per contract · MOQ 1 job
Audit & accountingKamrupakshay6 variants
SampleServiceAudit & accounting Kamrupakshay · KAM-541 series
- Annual turnover
- INR 2 crore to INR 500 crore (see variants)
- Service
- Statutory audit
- Accounting standard
- AS
- Audit team
- Partner plus 2 staff
- Reports
- Audit report with CARO
Lead time Engagement in 1 week · Warranty Professional indemnity · MOQ 1 month
Project finance & debt arrangementKrishna5 variants
SampleServiceProject finance & debt arrangement Krishna · KRI-CD5 series
- Project cost
- INR 100 crore to INR 2500 crore (see variants)
- Mandate
- Equity and debt
- Debt-equity
- 75:25
- Tenor
- 15 years
- Lenders approached
- Multilaterals and funds
Lead time Mandate in 1-2 weeks · Warranty Fee linked to outcome · MOQ 1 job
Carbon credits & offsetsJhelum4 variants
SampleServiceCarbon credits & offsets Jhelum · JHE-9D7 series
- Annual credits
- 1,000 tCO2e to 50,000 tCO2e (see variants)
- Programme
- Both
- Project type
- Waste heat
- Methodology
- Baseline development
- MRV
- Annual report
Lead time Registration 6-18 months · Warranty Fee linked to issuance · MOQ 1 job
Power-exchange trading servicesKakatiya5 variants
SampleServicePower-exchange trading services Kakatiya · KAK-053 series
- Traded volume
- 1 MU per month to 50 MU per month (see variants)
- Segment
- Term-ahead market
- Licence
- Through electricity trader
- Margin
- Fixed monthly fee
- Bidding
- Algorithmic bidding
Lead time Trading from next market day · Warranty Settlement accuracy · MOQ 1 month
Demand responseMalwa5 variants
SampleServiceDemand response Malwa · MAL-B43 series
- Curtailable load
- 0.5 MW to 25 MW (see variants)
- Programme
- Utility DR
- Control
- Automated through SCADA
- Notice
- 2 hours
- Duration per event
- 1 hour
Lead time Assessment in 2-3 weeks · Warranty Performance reporting · MOQ 1 MW
Marine-transit & CAR insuranceDoabaampere5 variants
SampleServiceMarine-transit & CAR insurance Doabaampere · DOA-D44 series
- Sum insured
- INR 1 crore to INR 500 crore (see variants)
- Policy type
- Marine cargo open policy
- Cover
- Named perils
- Territory
- Door to door in India
- Period
- Single voyage
Lead time Policy issued in 2-5 days · Warranty Claims support included · MOQ 1 job
Demand responseChambalsurya4 variants
SampleServiceDemand response Chambalsurya · CHA-1A3 series
- Curtailable load
- 1 MW to 25 MW (see variants)
- Programme
- Utility DR
- Control
- Manual
- Notice
- 2 hours
- Duration per event
- 4 hours
Lead time Assessment in 2-3 weeks · Warranty Performance reporting · MOQ 1 MW
Demand responseUjjayiniprithvi4 variants
SampleServiceDemand response Ujjayiniprithvi · UJJ-C47 series
- Curtailable load
- 1 MW to 25 MW (see variants)
- Programme
- TOD optimisation
- Control
- Automated through SCADA
- Notice
- 2 hours
- Duration per event
- 1 hour
Lead time Enrolment 4-8 weeks · Warranty As per programme terms · MOQ 1 MW
Energy auditsAravali5 variants
SampleServiceEnergy audits Aravali · ARA-A78 series
- Connected load
- 100 kW to 10 MW (see variants)
- Audit level
- Investment-grade audit
- Instruments
- Power analyser, thermal camera
- Auditor
- BEE accredited energy auditor
- Report
- Savings opportunities with payback
Lead time Audit in 1-2 weeks · Warranty Clarifications for 6 months · MOQ 1 site
Battery recycling & second lifeKakatiya5 variants
SampleServiceBattery recycling & second life Kakatiya · KAK-E32 series
- Quantity
- 0.5 tonne to 50 tonnes (see variants)
- Chemistry
- LFP
- Process
- Hydrometallurgy
- Second life
- SoH test and grading
- Recovery rate
- 95% for metals
Lead time Pick-up in 7-14 days · Warranty Certificate of recycling · MOQ 1 tonne