Exothermic weldingBundellumen3 variants
Bundellumen · BUN-D53 series
- Weld type
- Cable to cable (T) to Strip to rod (see variants)
- Weld metal size
- 115 g
- Mould material
- High-density graphite
- Mould life
- 50-100 welds
- Conductor
- Copper to copper
Lead time 1-2 weeks · Warranty As per manufacturer test certificate · MOQ 1 set
Pre-engineered buildings (PEB)Taxila5 variants
SamplePre-engineered buildings (PEB) Taxila · TAX-B67 series
- Clear span
- 12 m to 30 m (see variants)
- Primary frame
- Hot-rolled section
- Steel grade
- IS 2062 E350
- Roof sheeting
- 0.5 mm PPGI
- Wall cladding
- Brick below 3 m
Lead time 6-8 weeks · Warranty 10 years structural · MOQ 1 sq m
GIS & network planningLonavala4 variants
SampleGIS & network planning Lonavala · LON-B37 series
- Users / scale
- 25 users to Statewide platform (see variants)
- Deployment
- Desktop
- Data formats
- GeoJSON
- Network analysis
- Tracing, connectivity, load flow
- Basemaps
- Satellite
Lead time 2-4 weeks · Warranty 12 months support · MOQ 1 licence
Machining & CNCMewar4 variants
SampleServiceMachining & CNC Mewar · MEW-372 series
- Part size envelope
- Up to 100 mm to Up to 800 mm (see variants)
- Process
- HMC
- Material
- Stainless steel
- Tolerance
- +/-0.02 mm
- Surface finish
- Ra 1.6
Lead time 3-4 weeks · Warranty 12 months for workmanship · MOQ 1 nos
Bus ductsKrishnaprithvi4 variants
Krishnaprithvi · KRI-336 series
- Rating
- 1000 A to 3200 A (see variants)
- Conductor
- Tinned copper
- Rated voltage
- 690 V
- Construction
- Air-insulated
- Short-circuit withstand
- 100 kA/1 s
Lead time 8-10 weeks · Warranty 24 months from supply · MOQ 1 m
Equipment finance & leasingSatpuradhruv3 variants
SampleServiceEquipment finance & leasing Satpuradhruv · SAT-772 series
- Facility size
- INR 50 lakh to INR 5 crore (see variants)
- Structure
- Term loan
- Tenor
- 7 years
- Security
- Corporate guarantee
- Moratorium
- 6 months
Lead time Term sheet in 1-2 weeks · Warranty Fee refund if no sanction as per terms · MOQ 1 job
Hydraulic trailers & ODC vehiclesAravali5 variants
SampleFor rentHydraulic trailers & ODC vehicles Aravali · ARA-396 series
- Payload capacity
- 20 t to 200 t (see variants)
- Axle lines
- 8
- Trailer length
- 9 m
- Prime mover
- Not included
- Permit
- ODC permit by hirer
Lead time 2-4 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Trench coversKaverigrid6 variants
Kaverigrid · KAV-172 series
- Cover size (L x W)
- 500 x 300 mm to 1200 x 900 mm (see variants)
- Material
- SMC composite
- Thickness
- 75 mm
- Load class
- Heavy vehicle 20 t
- Weight
- 60 kg
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
OEM sparesLohaline6 variants
Lohaline · LOH-963 series
- Spare category
- Contact kit to Complete overhaul kit (see variants)
- Type
- Original equipment
- Voltage
- 220 V DC
- Compatibility
- Equipment model as per nameplate
- Mounting
- Screw terminal
Lead time 3-7 days · Warranty 12 months from supply · MOQ 1 nos
Static VAR compensators (SVC)Shivaliklumen6 variants
SampleStatic VAR compensators (SVC) Shivaliklumen · SHI-FE1 series
- Rating
- 2 MVAr to 80 MVAr (see variants)
- System voltage
- 33 kV
- Configuration
- TSC only
- Thyristor valve
- Air-cooled
- Response time
- < 20 ms
Lead time 20-28 weeks · Warranty 36 months from commissioning · MOQ 1 nos
Valves, pipes & fittingsTeslaline5 variants
SampleValves, pipes & fittings Teslaline · TES-9F9 series
- Nominal bore
- 80 NB to 300 NB (see variants)
- Body material
- Cast iron
- Pressure class
- Class 150
- End connection
- Screwed
- Operation
- Hand wheel
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Hydrogen sensors & safety systemsSaurashtra3 variants
SampleHydrogen sensors & safety systems Saurashtra · SAU-DD8 series
- Detection range
- 0-1000 ppm to 0-100% LEL (see variants)
- Sensor type
- Electrochemical
- Output
- 4-20 mA HART
- Response time T90
- < 30 s
- Accuracy
- +/- 2% of FS
Lead time 2-4 weeks · Warranty 24 months · MOQ 5 nos
Auto-reclosers & sectionalisersNalanda5 variants
SampleAuto-reclosers & sectionalisers Nalanda · NAL-B05 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- SF6
- Insulation
- Silicone rubber
- Mounting
- Pole mounted
Lead time 10-12 weeks · Warranty 24 months from commissioning · MOQ 1 nos
SCADA, RTU & plant controllersVaigaispark5 variants
SampleSCADA, RTU & plant controllers Vaigaispark · VAI-3C2 series
- I/O capacity
- 16 DI / 8 DO to 256 I/O modular (see variants)
- Protocols
- Modbus RTU/TCP
- CPU
- Industrial x86 dual-core
- Power supply
- 48 VDC
- Operating temperature
- -25 to 70 °C
Lead time 8-10 weeks · Warranty 36 months from supply · MOQ 10 nos
Steel structuresTejgen4 variants
Tejgen · TEJ-8E9 series
- Structure weight class
- 1 MT lot to 10 MT lot (see variants)
- Material grade
- IS 2062 E250 BR
- Galvanising coating
- 610 g/sq m
- Section type
- Tubular
- Bolt grade
- 8.8
Lead time 5-7 weeks · Warranty 24 months against coating failure · MOQ 5 MT
Hot-dip galvanisingNalanda4 variants
SampleServiceHot-dip galvanising Nalanda · NAL-FF1 series
- Minimum zinc coating
- 100 micron to 900 g/sq m (see variants)
- Item type
- Structure assembly
- Max piece length
- 14 m
- Bath size
- 14 x 1.8 x 3.5 m
- Zinc purity
- 99.95%
Lead time 3-5 days · Warranty Coating conforms to IS 4759 · MOQ 1 MT
BMS & energy management (EMS)Tirhuttamra6 variants
SampleBMS & energy management (EMS) Tirhuttamra · TIR-A99 series
- System scale
- Up to 100 kWh to Up to 200 MWh (see variants)
- Cell count supported
- Up to 192 series
- Voltage sensing accuracy
- +/- 2 mV
- Temperature sensing
- NTC, +/- 1 deg C
- SOC accuracy
- +/- 3%
Lead time 6-8 weeks · Warranty 36 months with AMC · MOQ 10 set
Product certification (BIS, IEC, ALMM)Lonavala5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Lonavala · LON-B41 series
- Certification scope
- ALMM List-I to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
Capacitors, resistors & magneticsSatpura4 variants
SampleCapacitors, resistors & magnetics Satpura · SAT-C86 series
- Value
- 10 µF to 470 µF (see variants)
- Rated voltage
- 450 VDC
- Capacitor type
- Snap-in electrolytic
- Tolerance
- ±10%
- Temperature range
- -40 to 85 °C
Lead time 6-10 weeks · Warranty 24 months from supply · MOQ 5 nos
PumpsSaurashtra6 variants
Saurashtra · SAU-4F6 series
- Power rating
- 7.5 HP to 300 HP (see variants)
- Flow
- 300 m3/h
- Head
- 100 m
- Casing material
- Cast iron
- Impeller
- Cast iron
Lead time 6-10 weeks · Warranty 18 months · MOQ 1 nos
Piles & foundationsTirhutdhruv4 variants
SamplePiles & foundations Tirhutdhruv · TIR-717 series
- Pile diameter
- 600 mm to 1000 mm (see variants)
- Pile type
- Screw steel
- Concrete grade
- M25
- Pile length
- 12 m
- Reinforcement
- Fe 500D
Lead time 4-6 weeks · Warranty Design life 50 years · MOQ 2 nos
Cooling-water & boiler chemicalsNilgiri5 variants
SampleCooling-water & boiler chemicals Nilgiri · NIL-707 series
- Pack size
- 25 kg to 1000 kg (see variants)
- Chemical type
- Corrosion inhibitor
- Form
- Powder
- Active content
- 30%
- pH of product
- 9-11
Lead time 1-2 weeks · Warranty Shelf life 12 months from manufacture · MOQ 10 kg
Rack PDUs & buswayMysorearc6 variants
Mysorearc · MYS-323 series
- Current
- 16 A to 400 A (see variants)
- Type
- Switched
- Phase
- 3-phase
- Outlets
- 20 x C13 + 4 x C19
- Voltage
- 415 V
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos
Contact & messenger wiresSabarmati4 variants
SampleContact & messenger wires Sabarmati · SAB-013 series
- Conductor
- 150 mm2 contact wire to Droppers (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 5 km