DG & equipment rentalBrahmaputraakash5 variants
SampleFor rentDG & equipment rental Brahmaputraakash · BRA-2D8 series
- DG capacity
- 15 kVA to 250 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- Silent canopy
- Operator
- Included
Lead time 2-3 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
OEM sparesDhruvtek3 variants
Dhruvtek · DHR-966 series
- Spare category
- Coil to Control card (see variants)
- Type
- Original equipment
- Voltage
- 220 V DC
- Compatibility
- Equipment model as per nameplate
- Mounting
- Screw terminal
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 1 nos
Supply-chain / invoice financeGodavariakshay3 variants
SampleServiceSupply-chain / invoice finance Godavariakshay · GOD-5D1 series
- Programme limit
- INR 1 crore to INR 10 crore (see variants)
- Structure
- TReDS platform
- Advance rate
- 80-85% of invoice
- Tenor
- Up to 90 days
- Recourse
- With recourse
Lead time Onboarding in 1-2 weeks · Warranty No hidden fees · MOQ 1 job
Exothermic weldingKonark5 variants
Konark · KON-FE1 series
- Weld type
- Cable to rod to Rod to rod (see variants)
- Weld metal size
- 90 g
- Mould material
- High-density graphite
- Mould life
- 50-100 welds
- Conductor
- Copper to steel
Lead time 1-2 weeks · Warranty As per manufacturer test certificate · MOQ 5 set
Voltage stabilisersKavachline3 variants
SampleVoltage stabilisers Kavachline · KAV-876 series
- Rating
- 200 kVA to 1000 kVA (see variants)
- Input range
- 340-480 V (3-ph)
- Output voltage
- 415 V ±1%
- Phases
- 1-ph
- Correction speed
- 35 V/s (servo)
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Penstocks, gates & hoistsSaurashtra5 variants
SamplePenstocks, gates & hoists Saurashtra · SAU-CE5 series
- Diameter / size
- 0.8 m to 2.5 m (see variants)
- Steel grade
- IS 2062 E250
- Plate thickness
- 8-12 mm
- Design head
- 50 m
- Lining
- Coal tar epoxy
Lead time 8-12 weeks · Warranty 24 months · MOQ 1 MT
Cable compounds (XLPE, PVC, LSZH)Tirhutspark5 variants
SampleCable compounds (XLPE, PVC, LSZH) Tirhutspark · TIR-692 series
- Voltage application
- 1.1 kV to 132 kV (see variants)
- Compound type
- XLPE
- Cross-linking
- Silane
- Melt flow index
- 1 g/10 min
- Colour
- Grey
Lead time 3-4 weeks · Warranty 12 months shelf life in sealed pack · MOQ 10 kg
Transformer monitoring (online DGA, bushing monitors)Kaverianant3 variants
SampleTransformer monitoring (online DGA, bushing monitors) Kaverianant · KAV-9F6 series
- Gases monitored
- 3 gases to 9 gases (see variants)
- Gases measured
- H2, CO, CO2, CH4, C2H2, C2H4, C2H6
- Technology
- Infrared
- Measurement interval
- 4 hours
- Accuracy
- +/- 10%
Lead time 8-10 weeks · Warranty 36 months with AMC · MOQ 1 nos
Ties, markers & clampsWayanad6 variants
SampleTies, markers & clamps Wayanad · WAY-754 series
- Size
- 100 x 2.5 mm to 450 x 9 mm (see variants)
- Material
- Nylon 66
- Pack quantity
- 500 pcs
- Colour
- Natural
- Tensile strength
- 18 kg
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 pack
Gas engines, CHP & cogeneration setsTaxilasurya3 variants
SampleGas engines, CHP & cogeneration sets Taxilasurya · TAX-2B8 series
- Electrical output
- 250 kW to 1 MW (see variants)
- Fuel
- LPG
- Electrical efficiency
- 36%
- Thermal output
- 3 MWth
- Total efficiency
- 80%
Lead time 24-32 weeks · Warranty 12 months · MOQ 1 nos
Medium-voltage drivesPallavafaraday6 variants
SampleMedium-voltage drives Pallavafaraday · PAL-AB5 series
- Rating
- 500 kW to 8000 kW (see variants)
- Output voltage
- 3.3 kV
- Topology
- NPC 3-level
- Input harmonics
- Below IEEE 519 (18/24/36-pulse)
- Power factor
- > 0.95 at full speed range
Lead time 14-18 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Solar DC cablesNilgiri6 variants
Nilgiri · NIL-7D1 series
- Size
- 4 sq mm to 35 sq mm (see variants)
- Rated voltage
- 1.0/1.0 kV DC
- Conductor
- Aluminium class 2
- Insulation
- XLPO
- Sheath
- XLPO halogen-free
Lead time 2-3 weeks · Warranty 25 years performance (limited) · MOQ 1 m
Servo stabilisers & isolation transformersBundel6 variants
SampleServo stabilisers & isolation transformers Bundel · BUN-0B8 series
- Rating
- 10 kVA to 500 kVA (see variants)
- Primary voltage
- 230 V
- Secondary voltage
- 230 V
- Phases
- 1-ph
- Winding
- Aluminium
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Bearings & power-transmission partsArcsys3 variants
SampleBearings & power-transmission parts Arcsys · ARC-9A5 series
- Bore diameter
- 20 mm to 50 mm (see variants)
- Bearing type
- Deep groove
- Series
- 32200
- Seal
- ZZ
- Clearance
- CN
Lead time 3-7 days · Warranty 12 months from supply · MOQ 1 nos
Detuned & series reactorsShivalik4 variants
SampleDetuned & series reactors Shivalik · SHI-362 series
- Rating
- 25 kVAr to 200 kVAr (see variants)
- Detuning factor
- 5.67% (210 Hz)
- Rated voltage
- 415 V
- Core
- Air core
- Winding
- Aluminium
Lead time 2-3 weeks · Warranty 18 months from supply · MOQ 1 nos
Furnace & rectifier transformersNilgirispark5 variants
SampleFurnace & rectifier transformers Nilgirispark · NIL-2B6 series
- Rating
- 5 MVA to 60 MVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- Up to 1000 V
- Application
- SAF
- Cooling
- OFWF
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Transformer oil filtration plantsVayumark4 variants
SampleFor rentTransformer oil filtration plants Vayumark · VAY-664 series
- Flow rate
- 600 lph to 6000 lph (see variants)
- Vacuum level
- Below 0.1 mbar
- Heater power
- 36 kW
- Outlet moisture
- Below 3 ppm
- Outlet BDV
- Above 70 kV
Lead time 4-7 days · Warranty Replacement unit within 48 h · MOQ 1 nos
Drone & AI inspectionLumenmark3 variants
SampleServiceDrone & AI inspection Lumenmark · LUM-7F4 series
- Scope
- Up to 50 MWp to Up to 250 MWp (see variants)
- Sensor
- Radiometric thermal camera
- Resolution
- 640x512 thermal
- Analytics
- Hotspot, diode fault, soiling
- Deliverables
- Excel and PDF
Lead time 2 weeks · Warranty Report accuracy as per contract · MOQ 1 MWp
Fans & ventilationBeasfaraday4 variants
Beasfaraday · BEA-C07 series
- Sweep
- 450 mm to 1200 mm (see variants)
- Fan type
- Wall
- Motor
- Induction
- Power
- 75 W
- Speed
- 1400 RPM
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 5 nos
Solar module recyclingTeesta6 variants
SampleServiceSolar module recycling Teesta · TEE-913 series
- Quantity
- 1 tonne to 500 tonnes (see variants)
- Process
- Thermal and chemical recovery
- Recovery rate
- 90%+
- Materials recovered
- Silicon, silver
- Authorisation
- Authorised under E-waste Rules
Lead time Processing 2-8 weeks · Warranty As per authorisation · MOQ 1 tonne
Industrial & hazardous-area lightingMysorespark3 variants
SampleIndustrial & hazardous-area lighting Mysorespark · MYS-C85 series
- Wattage
- 40 W to 100 W (see variants)
- Protection concept
- Ex tb dust
- Gas group
- IIB
- Zone
- Zone 2
- Temperature class
- T4
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
EarthwireTungabhadrajal5 variants
Tungabhadrajal · TUN-B28 series
- Size
- 7/3.66 mm to OPGW 48F (see variants)
- Type
- OPGW
- Strands
- 19
- Tensile strength
- 110 kN
- Fibres
- 48
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 km
ElectrolysersSabarmati3 variants
Sabarmati · SAB-574 series
- Hydrogen output
- 10 Nm3/h to 100 Nm3/h (see variants)
- Technology
- PEM
- Operating pressure
- 15 bar
- H2 purity
- 99.9%
- Specific energy
- 4.5 kWh/Nm3
Lead time 30-40 weeks · Warranty Stack warranty 5 years or 40000 hours · MOQ 10 nos
Neutral grounding resistorsPrithvimax4 variants
SampleNeutral grounding resistors Prithvimax · PRI-C13 series
- Rated current
- 50 A to 400 A (see variants)
- System voltage
- 3.3 kV
- Resistance
- 50 ohm
- Time rating
- 10 s
- Element
- Cast iron
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos