Hydrogen sensors & safety systemsArctron4 variants
SampleHydrogen sensors & safety systems Arctron · ARC-F96 series
- Detection range
- 0-1000 ppm to 0-100% vol (see variants)
- Sensor type
- Thermal conductivity
- Output
- Modbus RTU
- Response time T90
- < 10 s
- Accuracy
- +/- 2% of FS
Lead time 2-4 weeks · Warranty 24 months · MOQ 1 nos
Partial discharge & VLF testersNarmadaphase3 variants
SamplePartial discharge & VLF testers Narmadaphase · NAR-332 series
- Test voltage (VLF peak)
- 60 kV to 90 kV (see variants)
- Test frequency
- 0.1 Hz
- Waveform
- Sinusoidal
- Max load capacitance
- 1.1 microF
- PD sensitivity
- Below 1 pC
Lead time 4-6 weeks · Warranty 24 months with calibration · MOQ 1 set
Green open access & REC tradingPushpakmax6 variants
SampleServiceGreen open access & REC trading Pushpakmax · PUS-BB3 series
- Consumption
- 1 MW to 100 MW (see variants)
- Mechanism
- Group captive
- Source
- Solar
- Services
- Approvals
- REC handling
- Trading on exchange
Lead time Study in 2 weeks · Warranty As per contract · MOQ 1 job
Substation constructionOjasline5 variants
SampleServiceSubstation construction Ojasline · OJA-DC1 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Erection and testing
- Transformers
- Up to 50 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay
Valves, pipes & fittingsWayanad5 variants
SampleValves, pipes & fittings Wayanad · WAY-FD8 series
- Nominal bore
- 25 NB to 150 NB (see variants)
- Body material
- Cast iron
- Pressure class
- PN 16
- End connection
- Butt weld
- Operation
- Gear operated
Lead time 1-2 weeks · Warranty 18 months from supply · MOQ 1 nos
Water storage & pumpingBetwafaraday4 variants
SampleWater storage & pumping Betwafaraday · BET-AA9 series
- Motor rating
- 15 kW to 75 kW (see variants)
- Pump type
- Multistage
- Head
- 20 m
- Flow
- 50 cu m/h
- Casing material
- Cast iron
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Tubular busbars & switchyard conductorsMewar5 variants
SampleTubular busbars & switchyard conductors Mewar · MEW-F39 series
- Pipe size
- 63 mm OD to 250 mm OD (see variants)
- Material
- Copper
- Wall thickness
- 8 mm
- Current rating
- 6300 A
- Length available
- 12 m
Lead time 6-8 weeks · Warranty 24 months · MOQ 5 m
Casting & forgingKanchi3 variants
SampleServiceCasting & forging Kanchi · KAN-D73 series
- Casting weight
- Up to 1 kg to Up to 25 kg (see variants)
- Material
- SG 500/7
- Process
- Die casting
- Pattern
- Made by foundry
- Machining
- Rough
Lead time 6-8 weeks · Warranty 12 months against casting defects · MOQ 1 kg
Insulated gloves & matsJalmark3 variants
SampleInsulated gloves & mats Jalmark · JAL-256 series
- Voltage class
- Class 1 (7.5 kV) to Class 3 (26.5 kV) (see variants)
- Gloves length
- 280 mm
- Proof test
- 10 kV
- Material
- Composite
- Mat thickness
- 3 mm
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 nos
Air compressors & dryersFaradaymax6 variants
SampleAir compressors & dryers Faradaymax · FAR-FB4 series
- Motor rating
- 7.5 kW to 90 kW (see variants)
- Working pressure
- 13 bar
- Free air delivery
- 2.5 cu m/min
- Type
- Reciprocating
- Drive
- VFD
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 nos
ODC & heavy-haul transportTungabhadra5 variants
SampleServiceODC & heavy-haul transport Tungabhadra · TUN-706 series
- Consignment weight
- 20 tonnes to 250 tonnes (see variants)
- Equipment
- Low-bed trailer
- Route survey
- Included
- Escort and permits
- Police and highway permits included
- Insurance
- Marine-cum-road transit insurance
Lead time Permits 7-21 days · Warranty Carrier liability as per law · MOQ 1 job
Land identification & aggregationKakatiyaanant3 variants
SampleServiceLand identification & aggregation Kakatiyaanant · KAK-2F2 series
- Land requirement
- 250 acres to 1000 acres (see variants)
- Land type
- Barren government land
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- 7/12 extracts, mutation, maps
Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre
Cable transit & sealing systemsSahyadri4 variants
SampleCable transit & sealing systems Sahyadri · SAH-E42 series
- Opening
- Round 50 mm to Frame 100 x 60 mm (see variants)
- Type
- Round sleeve
- Fire rating
- EI 240
- Seal material
- Silicone
- Frame material
- Galvanised steel
Lead time 4-6 weeks · Warranty 10 years from supply · MOQ 5 nos
Helmets, shoes & eyewearVolttek3 variants
SampleHelmets, shoes & eyewear Volttek · VOL-CC1 series
- Item
- Goggles to Safety shoes composite toe (see variants)
- Helmet material
- ABS
- Electrical rating
- Class E up to 20 kV
- Suspension
- 4-point
- Shoe toe cap
- Composite 200 J
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 nos
AMC & breakdown servicesKutch6 variants
SampleServiceAMC & breakdown services Kutch · KUT-216 series
- Equipment value covered
- INR 10 lakh to INR 5 crore (see variants)
- Coverage
- Preventive plus breakdown labour
- Visits
- 2 per year
- Response time
- 8 hours
- Spare parts
- Consumables only
Lead time Start within 1 week · Warranty Parts replaced covered for 6 months · MOQ 1 job
Numerical relaysTejtron5 variants
Tejtron · TEJ-C41 series
- Function
- Overcurrent / earth fault to Line distance (see variants)
- Aux supply
- 110 V DC
- CT input
- 1 A
- VT input
- 110 V
- Binary inputs
- 32
Lead time 8-10 weeks · Warranty 24 months · MOQ 5 nos
Thermal energy storageVaigaidhruv4 variants
SampleThermal energy storage Vaigaidhruv · VAI-079 series
- Storage capacity
- 1 MWh-th to 100 MWh-th (see variants)
- Storage medium
- Graphite or refractory block
- Operating temperature
- 4 deg C
- Charge source
- Electric heater
- Discharge output
- Chilled water
Lead time 10-14 weeks · Warranty 5 years on tank · MOQ 5 kWh
Active harmonic filtersShivalik4 variants
SampleActive harmonic filters Shivalik · SHI-4B7 series
- Compensation current
- 50 A to 150 A (see variants)
- Voltage
- 3-ph 480 V
- Wires
- 3-wire
- Harmonic order
- 2nd to 50th
- Response time
- < 100 µs sampling
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Contract engineersKrishna6 variants
SampleServiceContract engineers Krishna · KRI-3A2 series
- Engineers deployed
- 1 engineer to 50 engineers (see variants)
- Discipline
- Electrical
- Experience
- 5-10 years
- Qualification
- M.Tech
- Engagement
- Full time on client site
Lead time Joining in 2-4 weeks · Warranty Replacement within 30 days if unsuitable · MOQ 1 man-month
Cable drum jacks & trailersFluxcore6 variants
SampleCable drum jacks & trailers Fluxcore · FLU-4A8 series
- Drum capacity
- 1 t to 12 t (see variants)
- Maximum drum diameter
- 2.8 m
- Maximum drum width
- 1 m
- Axle
- Tandem
- Jack type
- Mechanical screw
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos
Medium-voltage drivesDeccan5 variants
SampleMedium-voltage drives Deccan · DEC-788 series
- Rating
- 200 kW to 3500 kW (see variants)
- Output voltage
- 11 kV
- Topology
- NPC 3-level
- Input harmonics
- Below IEEE 519 (18/24/36-pulse)
- Power factor
- > 0.95 at full speed range
Lead time 22-30 weeks · Warranty 36 months from supply · MOQ 1 nos
Paints & anti-corrosion coatingsKanchi5 variants
SamplePaints & anti-corrosion coatings Kanchi · KAN-485 series
- Pack size
- 1 litre to 50 litre (see variants)
- Paint type
- Epoxy
- Packs
- Two pack
- Dry film thickness
- 40 micron
- Colour
- Sea green 218
Lead time 1-2 weeks · Warranty 12 months shelf life · MOQ 1 litre
Changeover switches & ATS panelsLonavala3 variants
SampleChangeover switches & ATS panels Lonavala · LON-BE8 series
- Rating
- 630 A to 1600 A (see variants)
- Type
- Motorised changeover
- Poles
- 3P
- Rated voltage
- 415 V AC
- Transfer device
- Interlocked MCCB
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Power quality analysersAiravatmax6 variants
SamplePower quality analysers Airavatmax · AIR-737 series
- Type
- Panel meter Class S to Fixed PQ + waveform capture (see variants)
- Measurement class
- Class A
- Voltage input
- 57-690 V L-L
- Current input
- Rogowski coil
- Harmonics
- Up to 63rd
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos