Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Pressure relief device, Plus 3 series

SampleBushings, OLTC & transformer accessories

Godavari · GOD-AD7 series

Voltage class
11 kV to 220 kV (see variants)
Component
OTI/WTI
Current rating
3150 A
Insulation type
RIP
Creepage
31 mm/kV

Lead time 12-20 weeks · Warranty 18 months · MOQ 10 nos

Price for verified buyers

by Godavari Power Transformers (Sample) · invoiced by BARREL

Request quote

Aluminium MCPCB, Elite series

SamplePCBs & electronic assemblies

Kaveri · KAV-2D5 series

Layers / type
Double-sided to Heavy copper 4-layer (see variants)
Base material
Aluminium core
Copper weight
3 oz
Board thickness
2.0 mm
Surface finish
ENIG

Lead time 1-2 weeks · Warranty As per purchase order · MOQ 1 nos

Price for verified buyers

by Kaveri Electronic Components (Sample) · invoiced by BARREL

Request quote

Utility asset GIS platform, Volt series

SampleGIS & network planning

Wayanadrajat · WAY-BA5 series

Users / scale
5 users to Statewide platform (see variants)
Deployment
Desktop
Data formats
GeoJSON
Network analysis
Tracing, connectivity, load flow
Basemaps
Cadastral overlay

Lead time 2-4 weeks · Warranty Support under AMC · MOQ 5 licence

Price on quote

by Wayanadrajat Digital Systems (Sample) · invoiced by BARREL

Request quote

Hampitej · HAM-5C5 series

Configuration
3-way (LBS+LBS+VCB) to 4-way (3LBS+TF) (see variants)
Rated voltage
24 kV
Rated current - ring
630 A
Transformer feeder
630 A VCB
Short-circuit rating
20 kA/3 s

Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 1 nos

Price for verified buyers

by Hampitej Switchboards (Sample) · invoiced by BARREL

Request quote

Substation SCADA gateway, Max 6 series

SampleSCADA, RTU & plant controllers

Lonavalatamra · LON-268 series

I/O capacity
16 DI / 8 DO to 512 I/O modular (see variants)
Protocols
Modbus RTU/TCP
CPU
ARM Cortex-A9
Power supply
24 VDC
Operating temperature
-25 to 70 °C

Lead time 4-6 weeks · Warranty 24 months from commissioning · MOQ 2 nos

Price on quote

by Lonavalatamra SCADA Systems (Sample) · invoiced by BARREL

Request quote

Grey iron casting job work, Neo series

SampleServiceCasting & forging

Coorgshikhar · COO-3F2 series

Casting weight
Up to 25 kg to Over 500 kg (see variants)
Material
FG 200
Process
Investment
Pattern
Made by foundry
Machining
Rough

Lead time 6-8 weeks · Warranty 12 months against casting defects · MOQ 1 kg

Price for verified buyers

by Coorgshikhar Job Works (Sample) · invoiced by BARREL

Request quote

LiDAR survey drone on hire, Smart series

SampleFor rentSurvey & inspection drones

Brahmaputraagni · BRA-6A5 series

Drone class
RTK mapping to Heavy payload (see variants)
Sensor
Radiometric thermal
Positioning
PPK
Flight time
90 min
Pilot
DGCA licensed remote pilot

Lead time 1 week · Warranty Re-flight at no charge if data unusable · MOQ 1 nos

Price for verified buyers

by Brahmaputraagni Equipment Hire (Sample) · invoiced by BARREL

Request quote

Project controls dashboard, Eco series

SampleERP, project & document management

Nilgiri · NIL-9E8 series

Users
50 users to 500 users (see variants)
Deployment
Cloud SaaS
Modules
Finance, procurement, projects, HR
Scheduling
Primavera-style CPM, Gantt
Document control
Revision, transmittal, approval workflow

Lead time 4-6 weeks · Warranty Support with AMC · MOQ 1 licence

Price on quote

by Nilgiri Software (Sample) · invoiced by BARREL

Request quote

Rotor hub casting, Plus series

SampleBlades & rotor parts

Brahmaputrahertz · BRA-D08 series

Blade length
60 m to 80 m (see variants)
Material
Glass fibre epoxy
Resin system
Polyester
Turbine class
IEC IIA
Root diameter
2.4 m

Lead time 8-12 weeks · Warranty 5 years structural · MOQ 5 nos

Price for verified buyers

by Brahmaputrahertz Wind Energy (Sample) · invoiced by BARREL

Request quote

Land identification for solar and wind projects, Xtra series

SampleServiceLand identification & aggregation

Nilgiritesla · NIL-9F2 series

Land requirement
250 acres to 2500 acres (see variants)
Land type
Barren government land
Acquisition mode
Long-term lease
Screening
Forest and eco-sensitive screening
Documents
7/12 extracts, mutation, maps

Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre

Price on quote

by Nilgiritesla Engineering Services (Sample) · invoiced by BARREL

Request quote

Capex financing for rooftop solar, Max series

SampleServiceEquipment finance & leasing

Krishna · KRI-551 series

Facility size
INR 1 crore to INR 100 crore (see variants)
Structure
Sale and leaseback
Tenor
5 years
Security
Corporate guarantee
Moratorium
6 months

Lead time Disbursement 4-10 weeks · Warranty As per engagement letter · MOQ 1 job

Price on quote

by Krishna Associates (Sample) · invoiced by BARREL

Request quote

Copper control cable, Edge series

SampleControl & instrumentation cables

Kaveriojas · KAV-692 series

Cores
19C x 1.5 sq mm to 37C x 2.5 sq mm (see variants)
Conductor
Annealed copper class 2
Insulation
PVC
Armour
Galvanised steel wire
Screen
None

Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 m

Price for verified buyers

by Kaveriojas Cables (Sample) · invoiced by BARREL

Request quote

Silent DG set on hire, Core series

SampleFor rentDG & equipment rental

Aravali · ARA-9F7 series

DG capacity
15 kVA to 500 kVA (see variants)
Phase
3 phase 415 V
Fuel
Client scope
Enclosure
CPCB IV+ canopy
Operator
Not included

Lead time 2-3 days · Warranty Replacement within 48 h · MOQ 1 nos

Price for verified buyers

by Aravali Machinery Rentals (Sample) · invoiced by BARREL

Request quote

Mahabaleshwarflux · MAH-1C5 series

Works volume
1 MW equivalent to 100 MW equivalent (see variants)
Foundation type
Driven steel pile
Concrete grade
M40 for turbine foundation
Pull-out testing
2% piles tested
Reinforcement
Fe 500D TMT

Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job

Price for verified buyers

by Mahabaleshwarflux Engineering Services (Sample) · invoiced by BARREL

Request quote

Online gearbox CMS, Titan series

SampleCondition monitoring systems (CMS)

Bundelakshay · BUN-529 series

Channels
8 channels to 16 channels (see variants)
Sensor type
Inductive oil debris
Sampling rate
25.6 kHz
Frequency range
0.1 Hz-10 kHz
Data storage
Local 128 GB

Lead time 3-5 weeks · Warranty 3 years with subscription · MOQ 5 set

Price on quote

by Bundelakshay Wind Power (Sample) · invoiced by BARREL

Request quote

MS flat, Core series

SampleStructural steel (angles, channels, plates)

Konkantrishul · KON-6C4 series

Section size
ISA 50x50x6 to ISMB 200 (see variants)
Grade
IS 2062 E350 BR
Length
6 m
Process
Hot rolled
Surface
Primer coated

Lead time 3-7 days · Warranty Replacement if off specification · MOQ 1 MT

Price for verified buyers

by Konkantrishul Materials (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited