Thermography & condition monitoringMahanadi4 variants
SampleServiceThermography & condition monitoring Mahanadi · MAH-F94 series
- Asset size
- 10 MW to 100 MW (see variants)
- Technique
- Partial discharge testing
- Camera resolution
- 640x480 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Orthomosaic of full plant
Lead time Mobilisation in 3-7 days · Warranty Report accuracy as per method · MOQ 1 site
Battery cells & modules (LFP, NMC, sodium-ion)Narmada3 variants
SampleBattery cells & modules (LFP, NMC, sodium-ion) Narmada · NAR-893 series
- Cell capacity
- 3.2 V 280 Ah to 3.2 V 587 Ah (see variants)
- Chemistry
- NMC
- Format
- Cylindrical
- Nominal voltage
- 3.2 V
- Energy density
- 200-250 Wh/kg
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 2 nos
ODC & heavy-haul transportMunnar5 variants
SampleServiceODC & heavy-haul transport Munnar · MUN-4B3 series
- Consignment weight
- 20 tonnes to 250 tonnes (see variants)
- Equipment
- Hydraulic multi-axle
- Route survey
- Included
- Escort and permits
- Police and highway permits included
- Insurance
- Carrier liability only
Lead time Dispatch in 5-10 days · Warranty Carrier liability as per law · MOQ 1 job
Arc-flash suitsKamrupsetu3 variants
Kamrupsetu · KAM-A43 series
- Arc rating
- 12 cal/cm² coverall to 40 cal/cm² switching suit (see variants)
- ATPV rating
- 40 cal/cm²
- PPE category
- CAT 2
- Fabric
- Multi-layer aramid
- Size range
- S to 3XL
Lead time 2-3 weeks · Warranty 12 months against defects · MOQ 1 nos
Thermal energy storageKakatiyajal3 variants
SampleThermal energy storage Kakatiyajal · KAK-C82 series
- Storage capacity
- 1 MWh-th to 20 MWh-th (see variants)
- Storage medium
- Graphite or refractory block
- Operating temperature
- 90 deg C
- Charge source
- Chiller
- Discharge output
- Chilled water
Lead time 10-14 weeks · Warranty 5 years on tank · MOQ 1 kWh
OT cybersecurity (IEC 62443)Wayanadrajat4 variants
SampleOT cybersecurity (IEC 62443) Wayanadrajat · WAY-531 series
- Assets monitored
- Up to 250 assets to Up to 20,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- Modbus
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- Email
Lead time 4-6 weeks · Warranty 12 months support · MOQ 1 licence
Water storage & pumpingNilgiri3 variants
SampleWater storage & pumping Nilgiri · NIL-AA2 series
- Motor rating
- 1.5 kW to 7.5 kW (see variants)
- Pump type
- End suction
- Head
- 100 m
- Flow
- 10 cu m/h
- Casing material
- Cast iron
Lead time 1-2 weeks · Warranty 18 months from supply · MOQ 1 nos
Substation & line O&MRavi5 variants
SampleServiceSubstation & line O&M Ravi · RAV-0A3 series
- Voltage level
- 33 kV to 400 kV (see variants)
- Scope
- Operation and maintenance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Two engineers plus 12 staff
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty Service credits for avoidable outages · MOQ 1 month
Li-ion BESS containersMaduraishakti4 variants
SampleLi-ion BESS containers Maduraishakti · MAD-EF3 series
- Energy capacity
- 372 kWh to 3.44 MWh (see variants)
- Cell chemistry
- LFP
- Cooling
- Air-cooled
- System voltage
- 768 V DC
- Rated C-rate
- 0.25C
Lead time 10-14 weeks · Warranty 5 years standard · MOQ 2 nos
Energy auditsTejtek4 variants
SampleServiceEnergy audits Tejtek · TEJ-9B2 series
- Connected load
- 5 MW to 50 MW (see variants)
- Audit level
- Investment-grade audit
- Instruments
- Ultrasonic flow meter, lux meter
- Auditor
- BEE accredited energy auditor
- Report
- Savings opportunities with payback
Lead time Report in 2-4 weeks · Warranty Clarifications for 6 months · MOQ 1 site
Tubular busbars & switchyard conductorsMadurai6 variants
SampleTubular busbars & switchyard conductors Madurai · MAD-8B3 series
- Pipe size
- 50 mm OD to 250 mm OD (see variants)
- Material
- Copper
- Wall thickness
- 6 mm
- Current rating
- 1250 A
- Length available
- 12 m
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 m
Blowers, fans & compressorsTaxilasurya5 variants
SampleBlowers, fans & compressors Taxilasurya · TAX-946 series
- Power rating
- 7.5 kW to 250 kW (see variants)
- Type
- Roots
- Flow
- 1000 m3/h
- Pressure
- 200 mmWC
- Impeller
- Backward curved
Lead time 8-12 weeks · Warranty 18 months · MOQ 5 nos
Capacitors, resistors & magneticsSparkgen3 variants
SampleCapacitors, resistors & magnetics Sparkgen · SPA-3D5 series
- Value
- 10 µF to 100 µF (see variants)
- Rated voltage
- 1100 VDC
- Capacitor type
- Screw-terminal electrolytic
- Tolerance
- ±20%
- Temperature range
- -40 to 105 °C
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 1 nos
SFRA, winding resistance & turns-ratio testersMadurai3 variants
SampleSFRA, winding resistance & turns-ratio testers Madurai · MAD-369 series
- Test current / range
- 5 A winding resistance to 40 A winding resistance (see variants)
- Instrument
- Winding resistance
- Accuracy
- 0.1%
- Frequency range
- 10 Hz to 25 MHz
- Dynamic range
- Over 100 dB
Lead time 3-4 weeks · Warranty 24 months with calibration · MOQ 10 nos
Wind turbine sparesKonarksamarth4 variants
SampleWind turbine spares Konarksamarth · KON-235 series
- Turbine class
- 1.5 MW to 3.3 MW (see variants)
- Component
- Filter
- Fits make
- As per turbine nameplate
- Origin
- OEM
- Material
- Carbon graphite
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
Fuel cellsKalingasudarshan4 variants
Kalingasudarshan · KAL-EB4 series
- Rated power
- 1 kW to 30 kW (see variants)
- Type
- SOFC
- Fuel
- Reformed natural gas
- Output voltage
- 400 V DC
- Electrical efficiency
- 45-55%
Lead time 20-28 weeks · Warranty 12 months · MOQ 2 nos
Bank guarantees & surety bondsCoorgshakti4 variants
SampleServiceBank guarantees & surety bonds Coorgshakti · COO-1D5 series
- Guarantee amount
- INR 50 lakh to INR 25 crore (see variants)
- Instrument
- Standby letter of credit
- Purpose
- Performance
- Validity
- 12 months
- Margin
- Nil with surety
Lead time Issuance in 3-10 days · Warranty As per guarantee terms · MOQ 1 job
Trenchers & HDD rigsEllora5 variants
SampleFor rentTrenchers & HDD rigs Ellora · ELL-3A3 series
- Machine size
- Trencher 450 mm wide to HDD 40 t (see variants)
- Trench depth
- 2.0 m
- Bore diameter
- Up to 200 mm
- Bore length
- Up to 150 m
- Operator
- Included
Lead time 3-5 days · Warranty Breakdown replacement within 72 h · MOQ 1 nos
Furnace & rectifier transformersTejmark4 variants
SampleFurnace & rectifier transformers Tejmark · TEJ-642 series
- Rating
- 20 MVA to 100 MVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- LRF
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 nos
Conduits, boxes & fittingsTejline6 variants
SampleConduits, boxes & fittings Tejline · TEJ-DB1 series
- Nominal diameter
- 20 mm to 63 mm (see variants)
- Material
- Rigid PVC
- Wall class
- Heavy
- Length
- 2 m
- Colour
- Black
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 10 m
Warehousing & yard managementKavachtron5 variants
SampleServiceWarehousing & yard management Kavachtron · KAV-649 series
- Storage area
- 1000 sq m to 25000 sq m (see variants)
- Storage type
- Covered warehouse
- Handling equipment
- Heavy cranes up to 100 tonnes
- Security
- 24x7 guards and CCTV
- Inventory system
- Daily stock statement
Lead time Space available in 3-7 days · Warranty Stock loss indemnity as per agreement · MOQ 1 month
Copper rods, strips & busbarsKrishna5 variants
SampleCopper rods, strips & busbars Krishna · KRI-834 series
- Rod / busbar size
- 8 mm rod to 75 x 10 mm (see variants)
- Grade
- OFE copper
- Conductivity
- Min 100% IACS
- Temper
- Half hard
- Form
- Strip
Lead time 1-2 weeks · Warranty Replacement if off specification · MOQ 1 kg
Live-line & hot-stick toolsKaveri4 variants
SampleLive-line & hot-stick tools Kaveri · KAV-C54 series
- Rated voltage
- 66 kV to 400 kV (see variants)
- Material
- FRP pultruded
- Length
- 3 m
- Type
- Fixed
- Head fittings
- Universal head
Lead time 1-2 weeks · Warranty Re-test every 6 months recommended · MOQ 1 nos
Scheduling & forecasting (QCA)Coorg5 variants
SampleServiceScheduling & forecasting (QCA) Coorg · COO-488 series
- Aggregated capacity
- 25 MW to 500 MW (see variants)
- Service
- Forecasting only
- Forecast horizon
- Day-ahead
- Accuracy
- Error under 8%
- Data input
- Satellite nowcasting
Lead time Go-live after integration testing · Warranty Forecast accuracy guarantee with fee linkage · MOQ 1 MW