Noise controlMahanadi4 variants
Mahanadi · MAH-D02 series
- Insertion loss
- 15 dB to 30 dB (see variants)
- Equipment served
- DG set
- Panel construction
- GI perforated with rockwool
- Infill
- PU foam
- Sheet thickness
- 2.0 mm
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 nos
OT cybersecurity (IEC 62443)Taxilaarc4 variants
SampleOT cybersecurity (IEC 62443) Taxilaarc · TAX-538 series
- Assets monitored
- Up to 50 assets to Up to 5,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- IEC 61850
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- SIEM syslog
Lead time 4-6 weeks · Warranty 12 months support · MOQ 2 licence
Battery-swapping stationsKanchiphase3 variants
SampleBattery-swapping stations Kanchiphase · KAN-466 series
- Battery slots
- 4 slots to 12 slots (see variants)
- Vehicle type
- Bus
- Battery pack
- 72 V 40 Ah
- Charger per slot
- 3.3 kW
- Swap time
- < 2 min
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
ERP, project & document managementVijaya3 variants
SampleERP, project & document management Vijaya · VIJ-6D6 series
- Users
- 10 users to 50 users (see variants)
- Deployment
- On-premise
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 4-6 weeks · Warranty 12 months support · MOQ 2 licence
Pole hardware, stays & cross-armsDwaraka3 variants
SamplePole hardware, stays & cross-arms Dwaraka · DWA-0F9 series
- Size
- 75x40 mm to 100x75 mm (see variants)
- Hardware item
- Guy insulator
- Material
- Mild steel to IS 2062
- Section
- Channel
- Length
- 1.2 m
Lead time 4-5 weeks · Warranty As per discom specification · MOQ 1 nos
Thermal energy storageAkshayline3 variants
SampleThermal energy storage Akshayline · AKS-615 series
- Storage capacity
- 1 MWh-th to 20 MWh-th (see variants)
- Storage medium
- PCM
- Operating temperature
- 4 deg C
- Charge source
- Electric heater
- Discharge output
- Chilled water
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 kWh
Contract drafting & reviewSabarmati5 variants
SampleServiceContract drafting & review Sabarmati · SAB-0C4 series
- Contract value
- INR 25 lakh to INR 100 crore (see variants)
- Document
- PPA
- Scope
- Drafting from scratch
- Governing law
- Indian law with foreign counterpart
- Dispute clause
- Institutional arbitration
Lead time Review in 3-5 days · Warranty Clarifications until signing · MOQ 1 job
Pole hardware, stays & cross-armsJhelum4 variants
SamplePole hardware, stays & cross-arms Jhelum · JHE-EC3 series
- Size
- 100x75 mm to 200x100 mm (see variants)
- Hardware item
- Guy insulator
- Material
- Mild steel to IS 2062
- Section
- Angle
- Length
- 3.0 m
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 5 nos
FastenersMarwar4 variants
Marwar · MAR-537 series
- Bolt size
- M10 to M20 (see variants)
- Grade
- 5.6
- Material
- Mild steel
- Finish
- Plain
- Length
- 75 mm
Lead time 3-7 days · Warranty Mechanical test certificate · MOQ 1 kg
MotorsCoorg3 variants
Coorg · COO-EF4 series
- Rating
- 1.5 kW to 15 kW (see variants)
- Speed
- 750 rpm
- Voltage
- 6.6 kV
- Frame
- Cast iron
- Mounting
- B35
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Excavators, backhoes & loadersEllora5 variants
SampleFor rentExcavators, backhoes & loaders Ellora · ELL-D83 series
- Operating weight
- 3 t mini to 30 t (see variants)
- Bucket capacity
- 1.5 cu m
- Operator
- Included
- Fuel
- Included
- Attachments
- Auger
Lead time 3-5 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
FastenersSatavahanadhruv3 variants
Satavahanadhruv · SAT-535 series
- Bolt size
- M12 to M20 (see variants)
- Grade
- 5.6
- Material
- SS 316
- Finish
- Zinc plated
- Length
- 50 mm
Lead time 1-2 weeks · Warranty Mechanical test certificate · MOQ 2 kg
Solar plant O&M & module cleaningTungabhadra4 variants
SampleServiceSolar plant O&M & module cleaning Tungabhadra · TUN-668 series
- Plant capacity
- 10 MWp to 100 MWp (see variants)
- Scope
- Full O&M with spare management
- Cleaning method
- Robotic
- Cleaning frequency
- Weekly
- Availability guarantee
- Plant availability 99%
Lead time Baseline audit before takeover · Warranty Availability guarantee with penalty · MOQ 1 MWp
Land identification & aggregationPrakashtron4 variants
SampleServiceLand identification & aggregation Prakashtron · PRA-0F9 series
- Land requirement
- 100 acres to 1000 acres (see variants)
- Land type
- Private agricultural land
- Acquisition mode
- Government allotment
- Screening
- Slope, shading, flood and grid proximity
- Documents
- Revenue records and survey numbers
Lead time Aggregation 3-9 months · Warranty Replacement of failed parcels · MOQ 1 acre
CRGO & CRNO electrical steelNalanda3 variants
SampleCRGO & CRNO electrical steel Nalanda · NAL-291 series
- Grade / thickness
- M4 0.27 mm to HiB 0.27 mm (see variants)
- Core loss
- 0.90 W/kg at 1.7 T
- Form
- Cut to size
- Coil width
- 750 mm
- Coil weight
- 10 MT
Lead time 6-10 weeks · Warranty Mill test certificate per coil · MOQ 1 kg
Nacelle components & main bearingsThanjavur4 variants
SampleNacelle components & main bearings Thanjavur · THA-B37 series
- Turbine rating
- 750 kW to 2.5 MW (see variants)
- Component
- Brake disc
- Bearing type
- Tapered roller double row
- Bore diameter
- 300 mm
- Material
- 100Cr6
Lead time 6-10 weeks · Warranty 24 months · MOQ 5 nos
Welding consumablesCoorg4 variants
SampleWelding consumables Coorg · COO-C92 series
- Electrode / wire diameter
- 2.5 mm to 5.0 mm (see variants)
- Classification
- E7018
- Coating
- Basic low hydrogen
- Current type
- DC+
- Tensile strength
- Min 420 MPa
Lead time 3-7 days · Warranty 12 months shelf life in sealed pack · MOQ 1 kg
Switchgear & breaker sparesHoysala4 variants
SampleSwitchgear & breaker spares Hoysala · HOY-ED2 series
- Rated voltage
- 24 kV to 145 kV (see variants)
- Component
- Motor
- Rated current
- 630 A
- Short circuit rating
- 40 kA
- Mechanical life
- 10000 operations
Lead time 4-8 weeks · Warranty 18 months from supply · MOQ 10 nos
Lightning arresters (ESE, conventional)Prakashline5 variants
SampleLightning arresters (ESE, conventional) Prakashline · PRA-648 series
- Protection radius (Level III)
- 35 m to 85 m (see variants)
- Type
- Faraday cage
- Advance time
- 15 µs
- Material
- Stainless steel 304
- Mast
- 3 m GI pole
Lead time 2-3 weeks · Warranty 10 years · MOQ 10 nos
Gas-based suppressionNilgiri5 variants
SampleGas-based suppression Nilgiri · NIL-CC3 series
- Protected volume
- Up to 50 m³ to 1000-3000 m³ (see variants)
- Agent
- HFC-227ea
- Cylinder pressure
- 42 bar
- Discharge time
- 60 seconds (inert gas)
- Detection
- Cross-zoned smoke detectors
Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 5 set
Contract engineersVidyuttron5 variants
SampleServiceContract engineers Vidyuttron · VID-FA9 series
- Engineers deployed
- 3 engineers to 50 engineers (see variants)
- Discipline
- Mechanical
- Experience
- 5-10 years
- Qualification
- M.Tech
- Engagement
- Full time on client site
Lead time Joining in 2-4 weeks · Warranty As per contract · MOQ 1 man-month
Mounting structures & trackersAwadhanant3 variants
SampleMounting structures & trackers Awadhanant · AWA-5F7 series
- Structure type
- Rooftop metal sheet to Fixed ground mount (see variants)
- Material
- HDG steel
- Zinc coating
- HDG per IS 4759
- Design wind speed
- 55 m/s
- Module tilt
- Site latitude
Lead time 2-3 weeks · Warranty 25 years structural on galvanising · MOQ 1 kWp
Hydro turbines (Francis, Kaplan, Pelton)Agnicore6 variants
SampleHydro turbines (Francis, Kaplan, Pelton) Agnicore · AGN-753 series
- Turbine output
- 3 MW to 100 MW (see variants)
- Turbine type
- Bulb
- Net head
- 30-200 m
- Rated speed
- 375 rpm
- Shaft orientation
- Vertical
Lead time 10-14 months · Warranty 24 months from commissioning · MOQ 1 nos
EarthwireSuryamax5 variants
Suryamax · SUR-862 series
- Size
- 7/3.15 mm to OPGW 24F (see variants)
- Type
- Alumoweld
- Strands
- 19
- Tensile strength
- 70 kN
- Fibres
- 12
Lead time 8-12 weeks · Warranty 24 months · MOQ 1 km