Harmonic filtersMahanadi3 variants
Mahanadi · MAH-228 series
- Filter rating
- 100 kVAr to 300 kVAr (see variants)
- Tuned to
- 5th
- Voltage
- 440 V
- Reactor core
- CRGO laminated
- Reactor insulation
- Class H
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Flexible, trailing & mining cablesKaveriojas6 variants
SampleFlexible, trailing & mining cables Kaveriojas · KAV-732 series
- Size
- 3C x 2.5 sq mm to 3C x 70 sq mm (see variants)
- Voltage grade
- 6.6 kV
- Conductor
- Tinned copper class 5
- Insulation
- Rubber
- Sheath
- HOFR CSP
Lead time 2-3 weeks · Warranty As per contract · MOQ 5 m
Biomass boilers & gasifiersLumentron5 variants
SampleBiomass boilers & gasifiers Lumentron · LUM-646 series
- Capacity
- 1 TPH to 20 TPH (see variants)
- Fuel
- Agro residue pellets
- Steam pressure
- 45 bar
- Firing system
- Dumping grate
- Efficiency
- 82%
Lead time 10-14 weeks · Warranty 18 months from supply · MOQ 2 nos
Supply-chain / invoice financePushpakmax6 variants
SampleServiceSupply-chain / invoice finance Pushpakmax · PUS-CA4 series
- Programme limit
- INR 25 lakh to INR 100 crore (see variants)
- Structure
- TReDS platform
- Advance rate
- 80-85% of invoice
- Tenor
- Up to 180 days
- Recourse
- Without recourse
Lead time Funding in 24-72 hours after approval · Warranty As per programme terms · MOQ 1 job
Thermal energy storageDwaraka3 variants
SampleThermal energy storage Dwaraka · DWA-C82 series
- Storage capacity
- 500 kWh-th to 5 MWh-th (see variants)
- Storage medium
- PCM
- Operating temperature
- 600-1000 deg C
- Charge source
- Chiller
- Discharge output
- Steam
Lead time 10-14 weeks · Warranty 24 months · MOQ 2 kWh
Boilers & HRSGShaktimark5 variants
Shaktimark · SHA-195 series
- Steam capacity
- 10 TPH to 300 TPH (see variants)
- Boiler type
- CFBC
- Steam pressure
- 170 bar
- Steam temperature
- 485 C
- Fuel
- Lignite
Lead time 10-14 months · Warranty 18 months from commissioning · MOQ 1 nos
Contact & messenger wiresTaxila5 variants
SampleContact & messenger wires Taxila · TAX-0F9 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km
GST & tax advisoryPallavaprabha5 variants
SampleServiceGST & tax advisory Pallavaprabha · PAL-A67 series
- Annual turnover
- INR 5 crore to INR 500 crore (see variants)
- Scope
- Advisory opinion
- Issues
- Works contract GST
- Returns
- GSTR-1 and 3B
- Litigation
- Appeals before tribunal
Lead time Opinion in 5-10 days · Warranty Penalty cover for advisory errors as per terms · MOQ 1 month
Charging cables & connectors (CCS2, Type 2)Vijaya3 variants
SampleCharging cables & connectors (CCS2, Type 2) Vijaya · VIJ-6F7 series
- Current rating
- 125 A to 350 A (see variants)
- Connector standard
- Bharat AC-001
- Cable length
- 3 m
- Phases
- 1-phase
- Rated voltage
- 480 V AC
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 nos
Substation & line O&MMysore6 variants
SampleServiceSubstation & line O&M Mysore · MYS-CB6 series
- Voltage level
- 11 kV to 400 kV (see variants)
- Scope
- Operation and maintenance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 month
Fuel-gas conditioning & pressure-reducing skidsSatavahana3 variants
SampleFuel-gas conditioning & pressure-reducing skids Satavahana · SAT-675 series
- Flow capacity
- 5000 Sm3/h to 25000 Sm3/h (see variants)
- Inlet pressure
- 16-70 bar
- Outlet pressure
- 4 bar
- Pressure regulation
- Active-monitor redundant
- Filtration
- Coalescer separator, 5 micron
Lead time 10-14 weeks · Warranty 12 months · MOQ 1 nos
Multimeters, clamp meters & insulation testersMagadhlumen5 variants
SampleMultimeters, clamp meters & insulation testers Magadhlumen · MAG-D06 series
- Maximum current / voltage range
- 600 A to 3000 A (flexible) (see variants)
- Measurement
- AC/DC current
- Display count
- 10000
- Accuracy
- 0.5%
- Safety rating
- CAT IV 600 V
Lead time 1-2 weeks · Warranty 3 years limited · MOQ 2 nos
SFRA, winding resistance & turns-ratio testersKalingavajra6 variants
SampleSFRA, winding resistance & turns-ratio testers Kalingavajra · KAL-9D1 series
- Test current / range
- 1 A winding resistance to SFRA 20 Hz-2 MHz (see variants)
- Instrument
- Turns ratio
- Accuracy
- 0.1%
- Frequency range
- 20 Hz to 2 MHz
- Dynamic range
- Over 100 dB
Lead time 6-10 weeks · Warranty 24 months with calibration · MOQ 2 nos
Conduits, boxes & fittingsArctron3 variants
SampleConduits, boxes & fittings Arctron · ARC-5D7 series
- Nominal diameter
- 25 mm to 40 mm (see variants)
- Material
- HDPE
- Wall class
- Heavy
- Length
- 2 m
- Colour
- Orange
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 5 m
Open-access approvalsTungabhadra6 variants
SampleServiceOpen-access approvals Tungabhadra · TUN-BB7 series
- Contract demand
- 1 MW to 100 MW (see variants)
- Access type
- Long term
- Scope
- Application and follow-up
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Filing in 1 week · Warranty Rework for deficient applications · MOQ 1 application
Aerial work platforms & boom liftsVidyutgen6 variants
SampleFor rentAerial work platforms & boom lifts Vidyutgen · VID-1E2 series
- Working height
- 8 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 450 kg
- Drive
- Hybrid
- Outreach
- 16 m
- Insulation
- Not insulated
Lead time 1-2 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Hot-gas-path parts & overhaul kitsVaigaispark6 variants
SampleHot-gas-path parts & overhaul kits Vaigaispark · VAI-017 series
- Turbine class
- 5 MW to 150 MW (see variants)
- Component
- Blades
- Stage
- Stage 2
- Base alloy
- Cobalt alloy
- Coating
- TBC
Lead time 20-36 weeks · Warranty 8000 equivalent operating hours · MOQ 5 set
Live-line & hot-stick toolsVidyutsys3 variants
SampleLive-line & hot-stick tools Vidyutsys · VID-8A6 series
- Rated voltage
- 132 kV to 400 kV (see variants)
- Material
- FRP pultruded
- Length
- 4.5 m
- Type
- Telescopic
- Head fittings
- Clamp stick
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Earthing & auxiliary transformersCoromandel6 variants
SampleEarthing & auxiliary transformers Coromandel · COR-2C1 series
- Rating
- 100 kVA to 3150 kVA (see variants)
- Type
- Auxiliary (Dyn11)
- Primary voltage
- 132 kV
- Secondary voltage
- 0.433 kV
- Short-time rating
- 30 s
Lead time 3-5 weeks · Warranty 24 months · MOQ 10 nos
Traction substations & transformersKonarkkiran6 variants
SampleTraction substations & transformers Konarkkiran · KON-D49 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 10 nos
Hydrogen sensors & safety systemsKavachcore4 variants
SampleHydrogen sensors & safety systems Kavachcore · KAV-F95 series
- Detection range
- 0-1000 ppm to 0-100% vol (see variants)
- Sensor type
- Catalytic bead
- Output
- Modbus RTU
- Response time T90
- < 10 s
- Accuracy
- +/- 5% of FS
Lead time 6-8 weeks · Warranty 12 months · MOQ 2 nos
Shunt & series reactorsChambal4 variants
SampleShunt & series reactors Chambal · CHA-753 series
- Rating
- 50 MVAr to 200 MVAr (see variants)
- System voltage
- 220 kV
- Type
- Shunt
- Construction
- Oil-immersed gapped core
- Phases
- Single
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Stringing machinesMysoresarvam5 variants
Mysoresarvam · MYS-211 series
- Maximum tension
- 30 kN to 150 kN (see variants)
- Type
- Tensioner
- Drive
- Electric
- Bullwheel diameter
- 2200 mm
- Conductor size
- ACSR Moose
Lead time 16-24 weeks · Warranty 18 months from supply · MOQ 5 nos
Substation automation (IEC 61850)Lumentron5 variants
SampleSubstation automation (IEC 61850) Lumentron · LUM-A58 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- IEC 61850 Ed 2
- Network topology
- PRP
- HMI
- Single HMI
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 lot