Isolators & earth switchesSahyadri3 variants
SampleIsolators & earth switches Sahyadri · SAH-C76 series
- System voltage
- 145 kV to 420 kV (see variants)
- Rated current
- 1250 A
- Type
- Double break
- Earth switch
- With 1 earth switch
- Short-time current
- 25 kA
Lead time 10-14 weeks · Warranty 30 months from supply · MOQ 2 nos
Exothermic weldingPataliputranandi6 variants
Pataliputranandi · PAT-D57 series
- Weld type
- Cable to rod to Cable to flat (see variants)
- Weld metal size
- 45 g
- Mould material
- High-density graphite
- Mould life
- 50-100 welds
- Conductor
- Copper to GI
Lead time 3-4 weeks · Warranty As per manufacturer test certificate · MOQ 1 set
Recruitment servicesKavachtron3 variants
SampleServiceRecruitment services Kavachtron · KAV-FD2 series
- Role seniority
- Engineer to Senior manager (see variants)
- Fee basis
- Percentage of annual CTC
- Search
- Targeted headhunting
- Screening
- Assessment centre
- Verification
- Education and employment check
Lead time Shortlist in 7-15 days · Warranty Replacement within 3 months · MOQ 1 case
Hydraulic crimping & cutting toolsPhasetek6 variants
SampleHydraulic crimping & cutting tools Phasetek · PHA-0D5 series
- Crimping range
- 10-120 sq mm to 300-1000 sq mm (see variants)
- Force
- 100 kN
- Operation
- Battery
- Die type
- Indent
- Dies included
- 10 pairs
Lead time 3-7 days · Warranty 12 months from supply · MOQ 10 nos
Water purification for electrolysisKonkanpushpak4 variants
SampleWater purification for electrolysis Konkanpushpak · KON-145 series
- Water output
- 5 m3/h to 50 m3/h (see variants)
- Product conductivity
- < 0.1 uS/cm
- Pre-treatment
- Multi-grade filter and softener
- RO stages
- Double pass
- Polishing
- Mixed bed resin
Lead time 10-14 weeks · Warranty 24 months on membranes pro-rata · MOQ 5 nos
ACB, MCCB & MCBLonavala5 variants
Lonavala · LON-7B4 series
- Rating
- 16 A to 630 A (see variants)
- Breaker type
- MCCB
- Poles
- 2P
- Rated voltage
- 240 V AC
- Breaking capacity (Icu)
- 10 kA
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos
Water testing laboratoriesVidarbhaarc3 variants
SampleServiceWater testing laboratories Vidarbhaarc · VID-EB8 series
- Parameter panel
- Full IS 10500 to Effluent CPCB panel (see variants)
- Sample type
- Boiler water
- Reporting
- Hard copy with seal
- Accreditation
- NABL accredited
- Turnaround
- 3 days
Lead time 3-5 days · Warranty Report valid for the sampled lot · MOQ 1 job
Prefab control roomsEllorashikhar5 variants
SamplePrefab control rooms Ellorashikhar · ELL-7A8 series
- Floor area
- 12 sq m to 48 sq m (see variants)
- Wall panel
- Rockwool sandwich 100 mm
- Fire rating
- 1 hour
- Roof
- Flat RCC with waterproofing
- Flooring
- Raised floor
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Utility billing & customer systemsKamrup3 variants
SampleUtility billing & customer systems Kamrup · KAM-1F1 series
- Consumer base
- Up to 10,000 to Up to 250,000 (see variants)
- Deployment
- Private cloud
- Billing types
- Postpaid, prepaid, net metering
- Tariff engine
- Slab, TOD, fixed + variable
- Meter integration
- MDM / AMI via IS 15959
Lead time 20-30 weeks · Warranty 36 months support · MOQ 2 licence
BESS thermal management & HVACSutlejsurya4 variants
SampleBESS thermal management & HVAC Sutlejsurya · SUT-9D1 series
- Cooling capacity
- 10 kW to 40 kW (see variants)
- Type
- Liquid chiller
- Refrigerant
- R134a
- Coolant
- Deionised water glycol
- Supply voltage
- 230 V 1-ph
Lead time 6-8 weeks · Warranty 12 months · MOQ 10 nos
Statutory approvals (CEIG, pollution, forest)Prithvitek4 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Prithvitek · PRI-524 series
- Approval package
- 5 approvals to Transmission project set (12) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Drawing and application preparation
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Approval 4-24 weeks · Warranty As per contract · MOQ 1 application
Governors & excitation systemsAjantaspark6 variants
SampleGovernors & excitation systems Ajantaspark · AJA-FA7 series
- Machine rating
- 1 MW to 60 MW (see variants)
- System type
- Combined
- Control
- Dual PID
- Actuator pressure
- 40 bar
- Excitation type
- Static thyristor
Lead time 20-28 weeks · Warranty 36 months · MOQ 1 set
Tower parts, bolts & nutsPrakashtek4 variants
SampleTower parts, bolts & nuts Prakashtek · PRA-259 series
- Bolt size
- M12 to M24 (see variants)
- Strength class
- 5.6
- Material
- Mild steel
- Galvanising
- Hot-dip, 43 micron
- Thread
- Metric coarse
Lead time 2-4 weeks · Warranty As per contract · MOQ 2 MT
Guarding & security servicesTeesta3 variants
SampleServiceGuarding & security services Teesta · TEE-251 series
- Guards deployed
- 25 guards to 100 guards (see variants)
- Guard type
- Armed (licensed)
- Shifts
- 8-hour 3 shifts
- Supervision
- Field officer per 20 guards
- Licence
- PSARA licence
Lead time 1-2 weeks · Warranty As per contract · MOQ 1 month
BMS & energy management (EMS)Satpura6 variants
SampleBMS & energy management (EMS) Satpura · SAT-FC2 series
- System scale
- Up to 100 kWh to Up to 200 MWh (see variants)
- Cell count supported
- Up to 384 series
- Voltage sensing accuracy
- +/- 5 mV
- Temperature sensing
- NTC, +/- 1 deg C
- SOC accuracy
- +/- 3%
Lead time 3-5 weeks · Warranty 36 months with AMC · MOQ 1 set
Static VAR compensators (SVC)Shivalik5 variants
SampleStatic VAR compensators (SVC) Shivalik · SHI-724 series
- Rating
- 2 MVAr to 40 MVAr (see variants)
- System voltage
- 11 kV
- Configuration
- TCR + TSC
- Thyristor valve
- Air-cooled
- Response time
- < 20 ms
Lead time 30-40 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Feeder pillars & LT distribution boxesDwaraka4 variants
SampleFeeder pillars & LT distribution boxes Dwaraka · DWA-692 series
- Rating
- 400 A to 1250 A (see variants)
- Enclosure material
- Stainless steel
- Ways
- 4-way
- Busbar
- Copper
- Incomer
- Switch-fuse
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Feasibility studies & DPRGuptaphase6 variants
SampleServiceFeasibility studies & DPR Guptaphase · GUP-BB5 series
- Project capacity
- 5 MW to 1 GW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- PVsyst P50/P90
- Financial model
- Sensitivity and tariff analysis
- Grid assessment
- Nearest substation capacity check
Lead time 3-12 weeks · Warranty Clarification support for 6 months · MOQ 1 report
Grid connectivity & GNA applicationsKakatiyaanant5 variants
SampleServiceGrid connectivity & GNA applications Kakatiyaanant · KAK-378 series
- Capacity applied
- 50 MW to 1000 MW (see variants)
- Application
- Both
- Scope
- Document preparation and filing
- Bank guarantee
- Arranged through partner bank
- Studies
- Grid impact summary
Lead time Grant 3-9 months · Warranty As per contract · MOQ 1 application
Machining & CNCKamrupnandi3 variants
SampleServiceMachining & CNC Kamrupnandi · KAM-E29 series
- Part size envelope
- Up to 500 mm to Up to 1200 mm (see variants)
- Process
- CNC turning
- Material
- Mild steel
- Tolerance
- +/-0.02 mm
- Surface finish
- Ra 1.6
Lead time 1-2 weeks · Warranty Rework of out-of-tolerance parts · MOQ 1 nos
Fire-survival & LSZH cablesBeas4 variants
SampleFire-survival & LSZH cables Beas · BEA-FA9 series
- Size
- 4C x 16 sq mm to 4C x 120 sq mm (see variants)
- Fire resistance
- Circuit integrity 90 min
- Insulation
- XLPE
- Sheath
- LSZH
- Conductor
- Copper
Lead time 4-5 weeks · Warranty As per contract · MOQ 2 m
Microinverters & power optimisersSamarthline3 variants
SampleMicroinverters & power optimisers Samarthline · SAM-2D6 series
- AC output
- 600 VA to 1000 VA (see variants)
- Inputs
- 1 module
- Max DC voltage
- 80 V
- MPPT range
- 22-55 V
- Peak efficiency
- 99.5% (optimiser)
Lead time 3-4 weeks · Warranty 10 years · MOQ 5 nos
Freight forwarding & customs clearanceVindhya5 variants
SampleServiceFreight forwarding & customs clearance Vindhya · VIN-AB1 series
- Shipment size
- 1 CBM to Multiple containers (see variants)
- Mode
- Sea FCL
- Customs services
- Duty planning and classification
- Incoterm
- CIF
- Permits
- BIS, WPC, import licences
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
Module materials (glass, EVA/POE, backsheet, frames, ribbon)Magadhurja3 variants
SampleModule materials (glass, EVA/POE, backsheet, frames, ribbon) Magadhurja · MAG-612 series
- Material
- Solar glass 3.2 mm to Tinned ribbon (see variants)
- Thickness
- 0.45 mm
- Light transmittance
- 91.5%
- Gel content
- > 75%
- Volume resistivity
- > 1e15 ohm-cm