Hardware fittings & dampersTamraline5 variants
SampleHardware fittings & dampers Tamraline · TAM-CF7 series
- Conductor type
- Panther to Quad Moose (see variants)
- Component
- Suspension clamp
- Material
- Forged aluminium alloy
- Rated load
- 70 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Fibre optic (OPGW, ADSS)Kaveriojas4 variants
SampleFibre optic (OPGW, ADSS) Kaveriojas · KAV-617 series
- Fibre count
- 12F to 48F (see variants)
- Cable type
- ADSS
- Fibre type
- G.655 NZDS
- Structure
- Central tube
- Short-circuit rating
- 150 kA2s
Lead time 10-14 weeks · Warranty 24 months from supply · MOQ 1 km
Hydrant & sprinkler systemsMunnararc4 variants
SampleHydrant & sprinkler systems Munnararc · MUN-5E7 series
- Pump capacity
- 273 m³/h at 70 m to 684 m³/h at 88 m (see variants)
- Pump type
- End suction centrifugal
- Drivers
- Electric motor
- Jockey pump
- 10.8 m³/h at 88 m
- Pipe
- GI Class B
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 10 lot
Helmets, shoes & eyewearUjjayinivolt5 variants
SampleHelmets, shoes & eyewear Ujjayinivolt · UJJ-9E9 series
- Item
- Helmet with visor to Dielectric boots 20 kV (see variants)
- Helmet material
- ABS
- Electrical rating
- Class E up to 20 kV
- Suspension
- 6-point ratchet
- Shoe toe cap
- Composite 200 J
Lead time 2-3 weeks · Warranty 12 months · MOQ 1 nos
Skilled technicians & electriciansAjanta3 variants
SampleServiceSkilled technicians & electricians Ajanta · AJA-7E7 series
- Team size
- 10 persons to 50 persons (see variants)
- Trade
- Instrument technician
- Qualification
- ITI
- Experience
- 2-5 years
- Compliance
- PF, ESI, minimum wages
Lead time Mass mobilisation in 3 weeks · Warranty As per contract · MOQ 1 man-month
Air compressors & dryersVaigaiagni4 variants
SampleAir compressors & dryers Vaigaiagni · VAI-FB9 series
- Motor rating
- 22 kW to 90 kW (see variants)
- Working pressure
- 13 bar
- Free air delivery
- 2.5 cu m/min
- Type
- Oil-injected screw
- Drive
- VFD
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 nos
ERP, project & document managementSatavahana5 variants
SampleERP, project & document management Satavahana · SAT-9B1 series
- Users
- 25 users to 500 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 10-16 weeks · Warranty 12 months support · MOQ 5 licence
PLC & DCSSarvammark4 variants
Sarvammark · SAR-236 series
- I/O points
- 128 I/O to 1024 I/O (see variants)
- CPU memory
- 8 MB
- Scan time
- < 0.1 ms per 1k
- Redundancy
- Hot standby CPU and network
- Programming
- IEC 61131-3 (LD, FBD, ST)
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Casting & forgingSutlej4 variants
SampleServiceCasting & forging Sutlej · SUT-025 series
- Casting weight
- Up to 1 kg to Up to 100 kg (see variants)
- Material
- WCB steel
- Process
- Closed die forging
- Pattern
- Made by foundry
- Machining
- Rough
Lead time 3-4 weeks · Warranty 12 months against casting defects · MOQ 1 kg
Static transfer switchesNarmadakavach3 variants
SampleStatic transfer switches Narmadakavach · NAR-696 series
- Rating
- 250 A to 800 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 415 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Make-before-break
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Primary & secondary injection kitsSetucore3 variants
SamplePrimary & secondary injection kits Setucore · SET-F47 series
- Output current
- 500 A to 2000 A (see variants)
- Output voltage
- 24 V
- Duty cycle
- Short time 5 min
- Supply
- 230 V AC
- Meters
- Built-in timer
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 set
Cable cleatsMunnar3 variants
Munnar · MUN-9A8 series
- Cable diameter
- 20-30 mm to 45-60 mm (see variants)
- Arrangement
- Single
- Material
- Glass-filled polyamide
- Short-circuit rating
- Up to 100 kA peak
- Fixing
- M10
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Wind turbine generatorsKutchphase3 variants
SampleWind turbine generators Kutchphase · KUT-EB9 series
- Rated power
- 2.5 MW to 3.3 MW (see variants)
- Rotor diameter
- 160 m
- Hub height
- 120 m
- Drive train
- Geared
- Generator
- PMSG
Lead time 9-12 months · Warranty 2 years comprehensive · MOQ 1 nos
Distribution transformersMadurai5 variants
SampleDistribution transformers Madurai · MAD-C15 series
- Rating
- 100 kVA to 1000 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Vector group
- Dyn11
- Cooling
- ONAN
- Energy efficiency level
- Level 1
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 1 nos
Building energy management systems (BEMS)Beasphase5 variants
SampleBuilding energy management systems (BEMS) Beasphase · BEA-7C5 series
- Monitored points
- 50 points to 1000 points (see variants)
- Protocols
- BACnet, LonWorks, OPC
- Metering
- Sub-meter integration
- Controls
- HVAC scheduling
- Dashboard
- Cloud and on-premises
Lead time Supply in 4-6 weeks · Warranty Hardware 12 months · MOQ 5 nos
ESCO & performance contractingNalanda6 variants
SampleServiceESCO & performance contracting Nalanda · NAL-379 series
- Investment size
- INR 25 lakh to INR 25 crore (see variants)
- Contract model
- Shared savings
- Term
- 5 years
- Savings share
- 80:20
- M&V
- IPMVP Option B
Lead time Implementation 2-6 months · Warranty Equipment warranty 3-5 years · MOQ 1 project
EOT & gantry cranes, hoistsVaigaiagni4 variants
SampleEOT & gantry cranes, hoists Vaigaiagni · VAI-7F1 series
- Capacity
- 5 t to 32 t (see variants)
- Span
- 15 m
- Duty class
- M5
- Hoisting speed
- 5/0.8 m/min
- Lift height
- 6 m
Lead time 10-12 weeks · Warranty 18 months from supply · MOQ 1 nos
Nacelle components & main bearingsKavachtron5 variants
SampleNacelle components & main bearings Kavachtron · KAV-359 series
- Turbine rating
- 1.5 MW to 3.6 MW (see variants)
- Component
- Main bearing
- Bearing type
- Tapered roller double row
- Bore diameter
- 500 mm
- Material
- 42CrMo4 forged
Lead time 12-16 weeks · Warranty 12 months · MOQ 10 nos
Gearboxes & couplingsCholajyoti3 variants
SampleGearboxes & couplings Cholajyoti · CHO-FE7 series
- Power rating
- 7.5 kW to 55 kW (see variants)
- Type
- Fluid coupling
- Reduction ratio
- 5:1
- Service factor
- 1.25
- Housing
- Cast iron
Lead time 1-3 weeks · Warranty 12 months · MOQ 2 nos
SF6 circuit breakersSabarmati4 variants
SampleSF6 circuit breakers Sabarmati · SAB-787 series
- System voltage
- 145 kV to 800 kV (see variants)
- Rated current
- 1250 A
- Breaking current
- 31.5 kA
- Operating mechanism
- Spring-spring
- Operation
- Single-pole
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Traction SCADAWayanadjoule5 variants
Wayanadjoule · WAY-6A6 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Line monitoring (DLR, fault passage indicators)Godavari3 variants
SampleLine monitoring (DLR, fault passage indicators) Godavari · GOD-433 series
- Voltage class
- 132 kV to 400 kV (see variants)
- Device
- DLR sensor
- Measured
- Conductor temperature
- Accuracy
- +/- 2% current
- Communication
- GSM / 4G
Lead time 3-5 weeks · Warranty 36 months · MOQ 1 nos
Installation & erectionVindhya3 variants
SampleServiceInstallation & erection Vindhya · VIN-DB2 series
- Installation scope
- 5 MW to 25 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Mobilisation in 10 days · Warranty Workmanship 12 months · MOQ 1 MW
Gas detectors & confined-space kitsVidarbha3 variants
SampleGas detectors & confined-space kits Vidarbha · VID-6D2 series
- Configuration
- 4-gas (O2, LEL, CO, H2S) to Confined-space kit (see variants)
- Gases
- SF6 (O2 displacement)
- Sensor type
- Electrochemical
- Alarm
- Audio, visual, vibration
- Display
- LCD backlit
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos