RO & DM plantsDwarakaprakash3 variants
Dwarakaprakash · DWA-451 series
- Permeate capacity
- 25 cu m/h to 100 cu m/h (see variants)
- Recovery
- 60%
- Membrane
- 4 inch TFC
- Feed TDS
- Up to 5000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 set
PV modulesHoysala4 variants
Hoysala · HOY-526 series
- Rated power
- 540 Wp to 600 Wp (see variants)
- Cell technology
- TOPCon N-type
- Cell configuration
- 120 half-cut
- Module efficiency
- 22.0%
- Maximum system voltage
- 1000 V DC
Lead time 3-4 weeks · Warranty 12 years product, 30 years performance · MOQ 2 nos
Precision coolingSatavahana4 variants
Satavahana · SAT-452 series
- Cooling capacity
- 15 kW to 50 kW (see variants)
- Type
- Chilled water
- Airflow
- Downflow
- Compressor
- Inverter scroll
- Fan
- EC plug fan
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Solar cells, wafers & ingotsPallavaakshay4 variants
SampleSolar cells, wafers & ingots Pallavaakshay · PAL-9F1 series
- Format
- G12 210 mm to Wafer 182 mm (see variants)
- Cell type
- Mono PERC
- Cell efficiency
- 25.5%
- Wafer thickness
- 130 micron
- Conductivity type
- N-type phosphorus
Lead time 2-3 weeks · Warranty As per supply agreement · MOQ 1 nos
Pellet & briquetting machinesCoromandel5 variants
SamplePellet & briquetting machines Coromandel · COR-351 series
- Capacity
- 250 kg/h to 5 TPH (see variants)
- Machine type
- Screw briquetter
- Product size
- 8 mm pellet
- Feedstock
- Paddy straw
- Motor power
- 90 kW
Lead time 3-5 weeks · Warranty 18 months on motor · MOQ 2 nos
Medium-voltage drivesKonark5 variants
SampleMedium-voltage drives Konark · KON-7D8 series
- Rating
- 200 kW to 3500 kW (see variants)
- Output voltage
- 11 kV
- Topology
- Cascaded H-bridge
- Input harmonics
- Below IEEE 519 (18/24/36-pulse)
- Power factor
- > 0.95 at full speed range
Lead time 22-30 weeks · Warranty 36 months from supply · MOQ 1 nos
Steam turbines & condensersMunnarloha5 variants
SampleSteam turbines & condensers Munnarloha · MUN-AD4 series
- Output
- 30 MW to 500 MW (see variants)
- Turbine type
- Condensing
- Inlet steam
- 67 ata / 485 C
- Speed
- 5500 rpm with gearbox
- Exhaust pressure
- 0.1 ata
Lead time 8-12 months · Warranty 18 months · MOQ 1 nos
Air compressors & dryersArcmark3 variants
SampleAir compressors & dryers Arcmark · ARC-333 series
- Motor rating
- 22 kW to 55 kW (see variants)
- Working pressure
- 13 bar
- Free air delivery
- 1.2 cu m/min
- Type
- Oil-injected screw
- Drive
- VFD
Lead time 4-6 weeks · Warranty 24 months airend · MOQ 1 nos
Site acceptance & pre-commissioning testsMahanadiloha5 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadiloha · MAH-C64 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
CT/PT & transformer analysersMadurai4 variants
SampleCT/PT & transformer analysers Madurai · MAD-DA4 series
- Test channels / output
- 3-phase 5 kV to Multi-function 60 A (see variants)
- Tests
- Knee point, excitation
- Class tested
- PS class
- Output current
- 0-30 A
- Output voltage
- 0-250 V
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 nos
Biomass handling & storageSuryamax3 variants
SampleBiomass handling & storage Suryamax · SUR-134 series
- Storage capacity
- 250 m3 to 1000 m3 (see variants)
- Equipment
- Conveyor
- Material
- Mild steel IS 2062
- Discharge rate
- 10 TPH
- Motor power
- 3 kW
Lead time 8-14 weeks · Warranty 12 months · MOQ 1 nos
Survey & inspection dronesSabarmatitamra5 variants
SampleFor rentSurvey & inspection drones Sabarmatitamra · SAB-239 series
- Drone class
- Small survey to Heavy payload (see variants)
- Sensor
- 20 MP RGB
- Positioning
- PPK
- Flight time
- 30 min
- Pilot
- DGCA licensed remote pilot
Lead time 2-3 days · Warranty Backup drone on site · MOQ 1 nos
Helmets, shoes & eyewearJalmark6 variants
SampleHelmets, shoes & eyewear Jalmark · JAL-0C3 series
- Item
- Helmet to Dielectric boots 20 kV (see variants)
- Helmet material
- ABS
- Electrical rating
- Class G 2.2 kV
- Suspension
- 4-point
- Shoe toe cap
- Steel 200 J
Lead time 2-3 weeks · Warranty 12 months · MOQ 1 nos
OEM sparesThanjavurarc6 variants
Thanjavurarc · THA-571 series
- Spare category
- Contact kit to Complete overhaul kit (see variants)
- Type
- Original equipment
- Voltage
- 230 V AC
- Compatibility
- Equipment model as per nameplate
- Mounting
- Plug-in
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 5 nos
PLC & DCSSarvammark3 variants
Sarvammark · SAR-A36 series
- I/O points
- 64 I/O to 256 I/O (see variants)
- CPU memory
- 512 KB
- Scan time
- < 1 ms per 1k instructions
- Redundancy
- Hot standby CPU and network
- Programming
- IEC 61131-3 (LD, FBD, ST)
Lead time 8-12 weeks · Warranty 24 months from supply · MOQ 5 nos
Condition monitoring systems (CMS)Trishulmark3 variants
SampleCondition monitoring systems (CMS) Trishulmark · TRI-902 series
- Channels
- 16 channels to 32 channels (see variants)
- Sensor type
- Inductive oil debris
- Sampling rate
- 51.2 kHz
- Frequency range
- 0.1 Hz-10 kHz
- Data storage
- Cloud
Lead time 3-5 weeks · Warranty 3 years with subscription · MOQ 1 set
Hybrid & dead-tank switchgearAmaravatianant4 variants
SampleHybrid & dead-tank switchgear Amaravatianant · AMA-8F4 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Hybrid
- Rated current
- 4000 A
- Breaking current
- 31.5 kA
- Gas
- SF6-free
Lead time 16-24 weeks · Warranty 24 months · MOQ 1 nos
Generation forecastingCoorgjyoti4 variants
SampleGeneration forecasting Coorgjyoti · COO-638 series
- Plant capacity
- Up to 50 MW to Up to 500 MW (see variants)
- Forecast horizon
- Day-ahead
- Resolution
- 15-minute blocks
- Update frequency
- Every 15 minutes
- Method
- Satellite cloud-motion
Lead time 1-2 weeks · Warranty Monthly accuracy report included · MOQ 2 month
Surveys (topo, geotech, drone)Satpurapushpak6 variants
SampleServiceSurveys (topo, geotech, drone) Satpurapushpak · SAT-796 series
- Survey area
- 25 acres to 1000 acres (see variants)
- Survey method
- Drone photogrammetry
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Contour map, DEM, CAD plan
- Geotech boreholes
- As per project requirement
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Street lightsNeelgen4 variants
Neelgen · NEE-418 series
- Wattage
- 20 W to 60 W (see variants)
- Luminous efficacy
- 130 lm/W
- Colour temperature
- 6500 K
- CRI
- Above 70
- Ingress protection
- IP66
Lead time 4-5 weeks · Warranty 60 months from supply · MOQ 2 nos
Boilers & HRSGNarmada4 variants
Narmada · NAR-B24 series
- Steam capacity
- 75 TPH to 670 TPH (see variants)
- Boiler type
- PC
- Steam pressure
- 110 bar
- Steam temperature
- 540 C
- Fuel
- Gas
Lead time 10-14 months · Warranty 18 months from commissioning · MOQ 10 nos
Energy-efficient appliances (BEE star rated)Tungabhadraneel5 variants
SampleEnergy-efficient appliances (BEE star rated) Tungabhadraneel · TUN-5F7 series
- Capacity or rating
- 1.5 ton AC to 10 ton VRF unit (see variants)
- BEE star rating
- 3 star
- Technology
- BLDC
- ISEER
- 5.5
- Refrigerant
- R32
Lead time Bulk lots 3-4 weeks · Warranty Compressor 5-10 years · MOQ 1 nos
Third-party inspection (TPI)Airavatsys4 variants
SampleServiceThird-party inspection (TPI) Airavatsys · AIR-091 series
- Inspection effort
- 10 man-days to 100 man-days (see variants)
- Equipment inspected
- Switchgear and relays
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Gas turbinesPataliputra4 variants
Pataliputra · PAT-001 series
- ISO rating
- 5 MW to 50 MW (see variants)
- Type
- Heavy-duty frame
- Fuel
- Natural gas
- Efficiency
- 27%
- Exhaust temperature
- 480 C
Lead time 18-26 months · Warranty 24 months · MOQ 5 nos