PCBs & electronic assembliesChola3 variants
SamplePCBs & electronic assemblies Chola · CHO-2D1 series
- Layers / type
- Double-sided to 6-layer (see variants)
- Base material
- Aluminium core
- Copper weight
- 3 oz
- Board thickness
- 1.0 mm
- Surface finish
- ENIG
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Pole hardware, stays & cross-armsIndraprastha3 variants
SamplePole hardware, stays & cross-arms Indraprastha · IND-8B1 series
- Size
- 115x45 mm to 200x100 mm (see variants)
- Hardware item
- Pole clamp
- Material
- Mild steel to IS 2062
- Section
- Channel
- Length
- 1.8 m
Lead time 2-3 weeks · Warranty As per discom specification · MOQ 1 nos
BMS & energy management (EMS)Pallavagaruda6 variants
SampleBMS & energy management (EMS) Pallavagaruda · PAL-A91 series
- System scale
- Up to 100 kWh to Up to 200 MWh (see variants)
- Cell count supported
- Up to 384 series
- Voltage sensing accuracy
- +/- 5 mV
- Temperature sensing
- NTC, +/- 1 deg C
- SOC accuracy
- +/- 5%
Lead time 6-8 weeks · Warranty 36 months with AMC · MOQ 10 set
Detuned & series reactorsSahyadriojas3 variants
SampleDetuned & series reactors Sahyadriojas · SAH-3A4 series
- Rating
- 100 kVAr to 400 kVAr (see variants)
- Detuning factor
- 14% (134 Hz)
- Rated voltage
- 525 V
- Core
- CRGO silicon steel, gapped
- Winding
- Copper
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Control & relay panelsPushpakmax5 variants
SampleControl & relay panels Pushpakmax · PUS-717 series
- System voltage
- 33 kV to 400 kV (see variants)
- Panel type
- Simplex
- Bay type
- Transformer
- Protection
- Distance + DEF
- Panel size
- 1000 x 800 x 2200 mm
Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos
Glands & lugsUrjasys6 variants
Urjasys · URJ-6D9 series
- Size
- 20S to 50 (see variants)
- Item
- Lug
- Material
- Tinned copper
- Gland type
- CW
- Thread
- NPT
Lead time 1 week · Warranty As per manufacturer · MOQ 5 nos
Transformer & scrap disposalKakatiya5 variants
SampleServiceTransformer & scrap disposal Kakatiya · KAK-B57 series
- Scrap quantity
- 1 tonne to 100 tonnes (see variants)
- Scrap type
- Switchgear
- Process
- Dismantling and segregation
- Authorisation
- PCB-authorised recycler
- PCB testing
- Oil tested for PCB
Lead time Pick-up in 5-10 days · Warranty Certificate of disposal · MOQ 1 lot
Static transfer switchesUjjayini3 variants
SampleStatic transfer switches Ujjayini · UJJ-691 series
- Rating
- 32 A to 125 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 400 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Break-before-make
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 2 nos
Nacelle components & main bearingsKrishna5 variants
SampleNacelle components & main bearings Krishna · KRI-351 series
- Turbine rating
- 1.5 MW to 3.6 MW (see variants)
- Component
- Main bearing
- Bearing type
- Spherical roller
- Bore diameter
- 700 mm
- Material
- SG iron 400-18
Lead time 12-16 weeks · Warranty 12 months · MOQ 5 nos
Fencing & gatesKalingaspark6 variants
Kalingaspark · KAL-FA9 series
- Fence height
- 1.2 m to 3.0 m (see variants)
- Mesh type
- 358 anti-climb
- Wire diameter
- 4.5 mm
- Post
- Angle 50x50x6
- Post spacing
- 3 m
Lead time 1-2 weeks · Warranty 12 months against coating defects · MOQ 1 m
Thermal energy storageKiranline5 variants
SampleThermal energy storage Kiranline · KIR-864 series
- Storage capacity
- 500 kWh-th to 100 MWh-th (see variants)
- Storage medium
- Graphite or refractory block
- Operating temperature
- 250-400 deg C
- Charge source
- Chiller
- Discharge output
- Hot water
Lead time 16-24 weeks · Warranty 24 months · MOQ 1 kWh
CT/PT & transformer analysersMagadhlumen3 variants
SampleCT/PT & transformer analysers Magadhlumen · MAG-DA3 series
- Test channels / output
- 3-phase 5 kV to Multi-function 30 A (see variants)
- Tests
- Ratio, polarity, burden
- Class tested
- PS class
- Output current
- 0-100 A
- Output voltage
- 0-250 V
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 2 nos
Transformer oil filtration plantsVidyutgen4 variants
SampleFor rentTransformer oil filtration plants Vidyutgen · VID-AD4 series
- Flow rate
- 1000 lph to 12000 lph (see variants)
- Vacuum level
- Below 1 mbar
- Heater power
- 54 kW
- Outlet moisture
- Below 5 ppm
- Outlet BDV
- Above 70 kV
Lead time 1-3 days · Warranty Replacement unit within 48 h · MOQ 1 nos
Hybrid & off-grid inverters, charge controllersSuryaline3 variants
SampleHybrid & off-grid inverters, charge controllers Suryaline · SUR-F95 series
- Rated power
- 2 kVA to 5 kVA (see variants)
- Battery voltage
- 12 V
- Battery type
- Both
- Max PV input
- 12 kW
- Controller type
- MPPT
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Hybrid & off-grid inverters, charge controllersHoysaladhruv5 variants
SampleHybrid & off-grid inverters, charge controllers Hoysaladhruv · HOY-F97 series
- Rated power
- 2 kVA to 10 kVA (see variants)
- Battery voltage
- 192 V
- Battery type
- Lithium-ion
- Max PV input
- 12 kW
- Controller type
- PWM
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 2 nos
Blades & rotor partsDoaba4 variants
SampleBlades & rotor parts Doaba · DOA-462 series
- Blade length
- 30 m to 60 m (see variants)
- Material
- Carbon-glass hybrid
- Resin system
- Polyester
- Turbine class
- IEC IIIA
- Root diameter
- 2.4 m
Lead time 16-20 weeks · Warranty 5 years structural · MOQ 1 nos
CRGO & CRNO electrical steelMewar6 variants
SampleCRGO & CRNO electrical steel Mewar · MEW-5D7 series
- Grade / thickness
- M3 0.23 mm to CRNO 0.50 mm (see variants)
- Core loss
- 0.90 W/kg at 1.7 T
- Form
- Slit coil
- Coil width
- 1000 mm
- Coil weight
- 10 MT
Lead time 2-4 weeks · Warranty Replacement if out of spec · MOQ 1 kg
Weather monitoring stationsNilgiri5 variants
SampleWeather monitoring stations Nilgiri · NIL-474 series
- Configuration
- Standard: GHI, POA, Tamb, Tmod to Wind mast 80 m (see variants)
- Pyranometer class
- Reference cell 2% accuracy
- Wind sensor
- Ultrasonic 2D
- Temperature sensor
- PT100 class A
- Humidity range
- 0-100% RH
Lead time 2-4 weeks · Warranty 24 months from commissioning · MOQ 1 set
Transformer NIFPSKavachcore4 variants
Kavachcore · KAV-C13 series
- Transformer oil volume
- 20-40 kL to Above 100 kL (see variants)
- Principle
- Nitrogen injection and drain
- Nitrogen cylinders
- 3 x 68 L
- Operating pressure
- 150 bar
- Oil drain valve
- Pneumatic
Lead time 8-10 weeks · Warranty 24 months from commissioning · MOQ 1 set
Energy auditsTejtek4 variants
SampleServiceEnergy audits Tejtek · TEJ-9B9 series
- Connected load
- 5 MW to 50 MW (see variants)
- Audit level
- Detailed audit
- Instruments
- Power analyser, thermal camera
- Auditor
- Certified Energy Manager
- Report
- Savings opportunities with payback
Lead time Report in 2-4 weeks · Warranty Clarifications for 6 months · MOQ 1 site
Prefab control roomsShivalikgrid3 variants
SamplePrefab control rooms Shivalikgrid · SHI-C08 series
- Floor area
- 48 sq m to 96 sq m (see variants)
- Wall panel
- Precast RCC
- Fire rating
- 2 hour
- Roof
- Flat RCC with waterproofing
- Flooring
- Raised floor
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 2 nos
AMI head-end & meter data managementKonkan5 variants
SampleAMI head-end & meter data management Konkan · KON-DD3 series
- Meter capacity
- 50,000 meters to 1,000,000 meters (see variants)
- Deployment
- On-premise
- Protocols
- DLMS/COSEM
- Communication support
- GPRS/4G
- Data validation
- Automated estimation
Lead time 16-24 weeks · Warranty 36 months support included · MOQ 10 licence
Thermal camerasHoysala3 variants
Hoysala · HOY-D95 series
- Detector resolution
- 80 x 60 to 240 x 180 (see variants)
- Temperature range
- -20 to 1200 deg C
- Thermal sensitivity
- Below 0.1 deg C
- Accuracy
- +/-2 deg C
- Focus
- Autofocus
Lead time 1-2 weeks · Warranty 10 years detector warranty (limited) · MOQ 1 nos
Street lightsAravali4 variants
Aravali · ARA-5B8 series
- Wattage
- 30 W to 90 W (see variants)
- Luminous efficacy
- 150 lm/W
- Colour temperature
- 4000 K
- CRI
- Above 80
- Ingress protection
- IP65
Lead time 2-3 weeks · Warranty 60 months from supply · MOQ 1 nos