Main inlet valves (butterfly, spherical)Ajantaspark4 variants
SampleMain inlet valves (butterfly, spherical) Ajantaspark · AJA-2D6 series
- Nominal diameter
- DN 800 to DN 2000 (see variants)
- Valve type
- Butterfly
- Pressure rating
- PN 16
- Body material
- Cast steel WCB
- Seat seal
- Service and maintenance seals
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 nos
CCTV & video analyticsGupta4 variants
SampleCCTV & video analytics Gupta · GUP-4A1 series
- Item
- PTZ 4 MP 30x to NVR 64-ch (see variants)
- Resolution
- 5 MP
- Lens
- 2.8-12 mm varifocal
- IR range
- 50 m
- Video compression
- H.265+
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 1 nos
ODC & heavy-haul transportVindhya5 variants
SampleServiceODC & heavy-haul transport Vindhya · VIN-4B3 series
- Consignment weight
- 50 tonnes to 400 tonnes (see variants)
- Equipment
- Hydraulic multi-axle
- Route survey
- Optional
- Escort and permits
- Client arranges
- Insurance
- Carrier liability only
Lead time Permits 7-21 days · Warranty Carrier liability as per law · MOQ 1 job
Precision coolingVindhya3 variants
Vindhya · VIN-6A7 series
- Cooling capacity
- 10 kW to 25 kW (see variants)
- Type
- DX water-cooled
- Airflow
- Upflow
- Compressor
- Not applicable
- Fan
- EC plug fan
Lead time 8-10 weeks · Warranty 24 months from supply · MOQ 1 nos
Pile drivers & augersKamrup6 variants
SampleFor rentPile drivers & augers Kamrup · KAM-DB5 series
- Rig capacity
- Light solar pile driver to Rotary rig 300 kNm (see variants)
- Pile diameter
- Up to 1500 mm
- Depth capacity
- 30 m
- Operator
- Not included
- Crew
- Operator + 2 helpers
Lead time 1-2 weeks · Warranty Breakdown replacement within 72 h · MOQ 1 nos
Compressors & storage tanksVidarbha5 variants
SampleCompressors & storage tanks Vidarbha · VID-979 series
- Capacity
- 50 Nm3/h to 1000 Nm3/h (see variants)
- Type
- Ionic liquid
- Suction pressure
- 5-30 bar
- Discharge pressure
- 900 bar
- Drive
- Hydraulic
Lead time 12-16 weeks · Warranty 24 months · MOQ 5 nos
Adhesives & sealantsSparkmark3 variants
SampleAdhesives & sealants Sparkmark · SPA-355 series
- Pack size
- 50 ml to 300 ml cartridge (see variants)
- Chemistry
- Silicone
- Cure time
- 5 minutes
- Colour
- Clear
- Temperature
- -50 to 260 deg C
Lead time 1-2 weeks · Warranty 12 months shelf life · MOQ 2 nos
Factory acceptance test (FAT) witnessingKrishna6 variants
SampleServiceFactory acceptance test (FAT) witnessing Krishna · KRI-174 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
CEMS & ambient air monitoringDeccanvolt4 variants
SampleCEMS & ambient air monitoring Deccanvolt · DEC-CF5 series
- Parameters monitored
- PM + SO2 to PM + gases + flow (see variants)
- Measurement method
- In-situ
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- Modbus TCP
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 set
Reciprocating gas & dual-fuel enginesSatavahana6 variants
SampleReciprocating gas & dual-fuel engines Satavahana · SAT-097 series
- Electrical output
- 500 kW to 12 MW (see variants)
- Fuel
- HSD / gas dual fuel
- Engine speed
- 1000 rpm
- Electrical efficiency
- 47%
- Cylinders
- V16
Lead time 30-40 weeks · Warranty 24 months or 8000 running hours · MOQ 2 nos
Generation forecastingMarwarswarna3 variants
SampleGeneration forecasting Marwarswarna · MAR-472 series
- Plant capacity
- Up to 100 MW to Up to 500 MW (see variants)
- Forecast horizon
- Day-ahead
- Resolution
- 15-minute blocks
- Update frequency
- Every 15 minutes
- Method
- NWP + machine learning
Lead time 1-2 weeks · Warranty Service level as per agreement · MOQ 1 month
Fibre optic (OPGW, ADSS)Mysore4 variants
SampleFibre optic (OPGW, ADSS) Mysore · MYS-615 series
- Fibre count
- 48F to 144F (see variants)
- Cable type
- OPGW
- Fibre type
- G.655 NZDS
- Structure
- Central tube
- Short-circuit rating
- 120 kA2s
Lead time 6-8 weeks · Warranty As per contract · MOQ 10 km
Ties, markers & clampsOjascore6 variants
SampleTies, markers & clamps Ojascore · OJA-7D8 series
- Size
- 100 x 2.5 mm to 450 x 9 mm (see variants)
- Material
- Stainless steel 316
- Pack quantity
- 500 pcs
- Colour
- Black UV
- Tensile strength
- 18 kg
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 pack
Ethanol & biofuel plant equipmentVidarbha3 variants
SampleEthanol & biofuel plant equipment Vidarbha · VID-E35 series
- Plant capacity
- 60 KLPD to 150 KLPD (see variants)
- Feedstock
- Molasses
- Distillation
- Atmospheric
- Dehydration
- Molecular sieve
- Product purity
- 99.5% v/v
Lead time 14-20 months · Warranty 12 months · MOQ 10 lot
ACB, MCCB & MCBTamracore4 variants
Tamracore · TAM-273 series
- Rating
- 63 A to 630 A (see variants)
- Breaker type
- MCB
- Poles
- 4P
- Rated voltage
- 240 V AC
- Breaking capacity (Icu)
- 36 kA
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 2 nos
Data loggersPennar5 variants
Pennar · PEN-BB9 series
- Channels
- 4 channels to 64 channels (see variants)
- Input types
- 4-20 mA
- Resolution
- 16-bit
- Sampling rate
- 100 ms min
- Memory
- 2 GB
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Energy auditsKakatiya3 variants
SampleServiceEnergy audits Kakatiya · KAK-A74 series
- Connected load
- 1 MW to 10 MW (see variants)
- Audit level
- Investment-grade audit
- Instruments
- Power analyser, thermal camera
- Auditor
- BEE accredited energy auditor
- Report
- Implementation roadmap
Lead time Audit in 1-2 weeks · Warranty Savings estimate accuracy within agreed band · MOQ 1 site
Changeover switches & ATS panelsKamrup4 variants
SampleChangeover switches & ATS panels Kamrup · KAM-2B7 series
- Rating
- 125 A to 630 A (see variants)
- Type
- Motorised changeover
- Poles
- 3P
- Rated voltage
- 415 V AC
- Transfer device
- Contactor pair
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 1 nos
Land identification & aggregationWayanad4 variants
SampleServiceLand identification & aggregation Wayanad · WAY-097 series
- Land requirement
- 250 acres to 2500 acres (see variants)
- Land type
- Barren government land
- Acquisition mode
- Government allotment
- Screening
- Forest and eco-sensitive screening
- Documents
- Revenue records and survey numbers
Lead time Aggregation 3-9 months · Warranty Replacement of failed parcels · MOQ 1 acre
Thermal camerasMadurai4 variants
Madurai · MAD-FA7 series
- Detector resolution
- 80 x 60 to 320 x 240 (see variants)
- Temperature range
- -20 to 350 deg C
- Thermal sensitivity
- Below 0.1 deg C
- Accuracy
- +/-2%
- Focus
- Autofocus
Lead time 3-5 weeks · Warranty 10 years detector warranty (limited) · MOQ 1 nos
Cable trays & laddersNarmadaprithvi5 variants
SampleCable trays & ladders Narmadaprithvi · NAR-468 series
- Width
- 100 mm to 600 mm (see variants)
- Type
- Trough
- Material
- FRP
- Finish
- Hot-dip galvanised
- Thickness
- 3.0 mm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 m
Inverter duty transformersAmaravati5 variants
SampleInverter duty transformers Amaravati · AMA-F52 series
- Rating
- 4 MVA to 12.5 MVA (see variants)
- Voltage ratio
- 33/0.69 kV
- Windings
- Two
- Vector group
- Dy11y11
- Cooling
- ONAN
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Digital twins & analyticsSatavahana3 variants
SampleDigital twins & analytics Satavahana · SAT-0D4 series
- Plant size
- Up to 250 MW to Portfolio > 1 GW (see variants)
- Deployment
- Hybrid edge
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 3-4 weeks · Warranty Subscription support · MOQ 2 licence
Pumped-storage pump-turbines & motor-generatorsTirhutamrit3 variants
SamplePumped-storage pump-turbines & motor-generators Tirhutamrit · TIR-825 series
- Unit rating
- 150 MW to 300 MW (see variants)
- Machine type
- Motor-generator
- Head range
- 150-300 m
- Rated speed
- 333 rpm
- Mode
- Generating / pumping
Lead time 24-36 months · Warranty 24 months · MOQ 5 nos