Traction substations & transformersKonarkkiran5 variants
SampleTraction substations & transformers Konarkkiran · KON-069 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
Control & relay panelsDwaraka6 variants
SampleControl & relay panels Dwaraka · DWA-EB6 series
- System voltage
- 11 kV to 400 kV (see variants)
- Panel type
- Duplex
- Bay type
- Bus coupler
- Protection
- Distance + DEF
- Panel size
- 800 x 800 x 2200 mm
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 nos
Neutral grounding resistorsMadurai6 variants
SampleNeutral grounding resistors Madurai · MAD-C17 series
- Rated current
- 50 A to 1500 A (see variants)
- System voltage
- 3.3 kV
- Resistance
- 10 ohm
- Time rating
- 10 s
- Element
- Liquid electrolyte
Lead time 8-10 weeks · Warranty 18 months · MOQ 1 nos
Hybrid & dead-tank switchgearUjjayini4 variants
SampleHybrid & dead-tank switchgear Ujjayini · UJJ-078 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Hybrid
- Rated current
- 2000 A
- Breaking current
- 50 kA
- Gas
- SF6
Lead time 28-36 weeks · Warranty 36 months · MOQ 1 nos
Bushings, OLTC & transformer accessoriesMadurai5 variants
SampleBushings, OLTC & transformer accessories Madurai · MAD-AD4 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Component
- OTI/WTI
- Current rating
- 2000 A
- Insulation type
- RIP
- Creepage
- 25 mm/kV
Lead time 12-20 weeks · Warranty 18 months · MOQ 2 nos
Shunt & series reactorsCoromandel5 variants
SampleShunt & series reactors Coromandel · COR-2C8 series
- Rating
- 5 MVAr to 80 MVAr (see variants)
- System voltage
- 33 kV
- Type
- Neutral
- Construction
- Air-core dry
- Phases
- Three
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Tubular busbars & switchyard conductorsCoromandelphase5 variants
SampleTubular busbars & switchyard conductors Coromandelphase · COR-8B2 series
- Pipe size
- 63 mm OD to 250 mm OD (see variants)
- Material
- Copper
- Wall thickness
- 8 mm
- Current rating
- 2500 A
- Length available
- 10 m
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 m
EarthwireSabarmati4 variants
Sabarmati · SAB-867 series
- Size
- 7/4.0 mm to OPGW 48F (see variants)
- Type
- Alumoweld
- Strands
- 7
- Tensile strength
- 70 kN
- Fibres
- 12
Lead time 3-5 weeks · Warranty 24 months · MOQ 2 km
OHE masts, cantilevers & catenaryTaxila4 variants
SampleOHE masts, cantilevers & catenary Taxila · TAX-F56 series
- Mast type
- Portal 2-track to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
EarthwireTungabhadra4 variants
Tungabhadra · TUN-DB6 series
- Size
- 7/3.15 mm to OPGW 12F (see variants)
- Type
- Alumoweld
- Strands
- 7
- Tensile strength
- 70 kN
- Fibres
- 12
Lead time 8-12 weeks · Warranty 12 months · MOQ 5 km
SF6 circuit breakersMadurai4 variants
SampleSF6 circuit breakers Madurai · MAD-CD5 series
- System voltage
- 145 kV to 800 kV (see variants)
- Rated current
- 4000 A
- Breaking current
- 25 kA
- Operating mechanism
- Hydraulic spring
- Operation
- Single-pole
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Covered conductors & LT spacersTungabhadrajal5 variants
SampleCovered conductors & LT spacers Tungabhadrajal · TUN-681 series
- Conductor size
- 95 mm2 to 240 mm2 (see variants)
- Voltage
- 33 kV
- Conductor
- AAAC
- Insulation
- HDPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
Shunt & series reactorsHampiohm5 variants
SampleShunt & series reactors Hampiohm · HAM-2C5 series
- Rating
- 25 MVAr to 200 MVAr (see variants)
- System voltage
- 220 kV
- Type
- Shunt
- Construction
- Oil-immersed gapped core
- Phases
- Single
Lead time 40-50 weeks · Warranty 36 months from supply · MOQ 10 nos
Bird diverters, aviation warning spheres & anti-climbing devicesKonkansudarshan4 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Konkansudarshan · KON-0C3 series
- Conductor / size
- 20 inch sphere to Anti-climbing spikes (see variants)
- Material
- Hot-dip galvanised steel
- Colour
- White
- Visibility
- Day and night reflective
- Fixing
- Bolted
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
SF6 circuit breakersJhelumtesla5 variants
SampleSF6 circuit breakers Jhelumtesla · JHE-EB3 series
- System voltage
- 72.5 kV to 800 kV (see variants)
- Rated current
- 1250 A
- Breaking current
- 50 kA
- Operating mechanism
- Spring-spring
- Operation
- Single-pole
Lead time 12-16 weeks · Warranty 30 months from supply · MOQ 1 nos
SF6-free (vacuum, clean-air) HV breakersPrithvimax5 variants
SampleSF6-free (vacuum, clean-air) HV breakers Prithvimax · PRI-2A5 series
- System voltage
- 36 kV to 245 kV (see variants)
- Insulation medium
- Fluoronitrile mix
- Interrupter
- Multi-break vacuum
- Rated current
- 3150 A
- Breaking current
- 31.5 kA
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 nos
Traction substations & transformersKalinga4 variants
SampleTraction substations & transformers Kalinga · KAL-917 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Substation automation (IEC 61850)Ujjayinisetu5 variants
SampleSubstation automation (IEC 61850) Ujjayinisetu · UJJ-982 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station + process bus
- Protocol
- DNP3
- Network topology
- Dual star
- HMI
- Single HMI
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 lot
Transformer monitoring (online DGA, bushing monitors)Awadhakshay4 variants
SampleTransformer monitoring (online DGA, bushing monitors) Awadhakshay · AWA-876 series
- Gases monitored
- Single gas (H2) to 9 gases (see variants)
- Gases measured
- H2, CO, C2H2
- Technology
- Gas chromatography
- Measurement interval
- 24 hours
- Accuracy
- +/- 10%
Lead time 8-10 weeks · Warranty 36 months with AMC · MOQ 2 nos
Instrument transformers (CT, PT, CVT)Bundel6 variants
SampleInstrument transformers (CT, PT, CVT) Bundel · BUN-795 series
- System voltage
- 11 kV to 400 kV (see variants)
- Type
- Current transformer
- Ratio
- 132 kV/110 V
- Accuracy class
- 0.5
- Burden
- 30 VA
Lead time 10-14 weeks · Warranty 18 months · MOQ 10 nos
Bushings, OLTC & transformer accessoriesKaverianant6 variants
SampleBushings, OLTC & transformer accessories Kaverianant · KAV-287 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Component
- PRV
- Current rating
- 3150 A
- Insulation type
- OIP
- Creepage
- 25 mm/kV
Lead time 12-20 weeks · Warranty 18 months · MOQ 1 nos
Mobile substationsMadurai5 variants
Madurai · MAD-031 series
- Transformer rating
- 10 MVA to 63 MVA (see variants)
- Primary voltage
- 66 kV
- Secondary voltage
- 33 kV
- Chassis
- Skid
- Primary switchgear
- AIS disconnector and breaker
Lead time 30-40 weeks · Warranty 36 months · MOQ 1 nos
Neutral grounding resistorsJhelum3 variants
SampleNeutral grounding resistors Jhelum · JHE-095 series
- Rated current
- 100 A to 400 A (see variants)
- System voltage
- 6.6 kV
- Resistance
- 50 ohm
- Time rating
- Continuous
- Element
- Liquid electrolyte
Lead time 4-6 weeks · Warranty 24 months · MOQ 10 nos
Instrument transformers (CT, PT, CVT)Bundel5 variants
SampleInstrument transformers (CT, PT, CVT) Bundel · BUN-0F1 series
- System voltage
- 33 kV to 400 kV (see variants)
- Type
- Combined CT-PT
- Ratio
- 400-800/1 A
- Accuracy class
- PS
- Burden
- 50 VA
Lead time 4-6 weeks · Warranty 18 months · MOQ 10 nos