Bird diverters, aviation warning spheres & anti-climbing devicesTungabhadra5 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Tungabhadra · TUN-089 series
- Conductor / size
- Spiral for 15-30 mm to Anti-climbing spikes (see variants)
- Material
- UV-stabilised PVC
- Colour
- White
- Visibility
- Day and night reflective
- Fixing
- Clip-on
Lead time 2-3 weeks · Warranty 24 months · MOQ 5 nos
Bird diverters, aviation warning spheres & anti-climbing devicesPrabhamark5 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Prabhamark · PRA-013 series
- Conductor / size
- Spiral for 10-15 mm to 36 inch sphere (see variants)
- Material
- Fibreglass
- Colour
- White
- Visibility
- Glow in dark
- Fixing
- Clip-on
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Station batteries (Ni-Cd, VRLA)Thanjavurampere3 variants
SampleStation batteries (Ni-Cd, VRLA) Thanjavurampere · THA-ED7 series
- Capacity
- 200 Ah to 500 Ah (see variants)
- Chemistry
- Ni-Cd
- Nominal cell voltage
- 1.2 V
- Number of cells
- 90
- Bank voltage
- 220 V
Lead time 3-4 weeks · Warranty 60 months pro-rata · MOQ 1 nos
Bus post insulators & clampsKonkanparam3 variants
SampleBus post insulators & clamps Konkanparam · KON-AE3 series
- System voltage
- 12 kV to 72.5 kV (see variants)
- Type
- Composite post
- Cantilever strength
- 4 kN
- Creepage
- 25 mm/kV
- Material
- Silicone composite
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Dry-type transformersKaverianant6 variants
SampleDry-type transformers Kaverianant · KAV-ED8 series
- Rating
- 250 kVA to 5000 kVA (see variants)
- Voltage ratio
- 33/0.433 kV
- Technology
- VPI
- Insulation class
- Class H
- Cooling
- AN/AF
Lead time 4-6 weeks · Warranty 36 months · MOQ 10 nos
Mobile substationsSamarthtek6 variants
Samarthtek · SAM-8E2 series
- Transformer rating
- 5 MVA to 63 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 33 kV
- Chassis
- Low-bed trailer
- Primary switchgear
- GIS bay
Lead time 16-24 weeks · Warranty 36 months · MOQ 5 nos
Mobile substationsKonark4 variants
Konark · KON-8E1 series
- Transformer rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 11 kV
- Chassis
- Container
- Primary switchgear
- AIS disconnector and breaker
Lead time 30-40 weeks · Warranty 24 months · MOQ 2 nos
Insulators (porcelain, polymer, glass)Prabhamark4 variants
SampleInsulators (porcelain, polymer, glass) Prabhamark · PRA-518 series
- Voltage and strength
- 66 kV 70 kN to 400 kV 160 kN (see variants)
- Material
- Silicone polymer
- Type
- Pin
- Failing load
- 210 kN
- Creepage
- 25 mm/kV
Lead time 3-5 weeks · Warranty 30 months from supply · MOQ 1 nos
Neutral grounding resistorsMalabarojas4 variants
SampleNeutral grounding resistors Malabarojas · MAL-569 series
- Rated current
- 100 A to 800 A (see variants)
- System voltage
- 33 kV
- Resistance
- 50 ohm
- Time rating
- 10 s
- Element
- SS 304 grid
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Covered conductors & LT spacersMahanadi4 variants
SampleCovered conductors & LT spacers Mahanadi · MAH-684 series
- Conductor size
- 70 mm2 to 150 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- AAAC
- Insulation
- HDPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
SF6 circuit breakersAmaravatianant6 variants
SampleSF6 circuit breakers Amaravatianant · AMA-CD3 series
- System voltage
- 36 kV to 800 kV (see variants)
- Rated current
- 1250 A
- Breaking current
- 50 kA
- Operating mechanism
- Hydraulic spring
- Operation
- 3-pole
Lead time 12-16 weeks · Warranty 30 months from supply · MOQ 1 nos
Insulators (porcelain, polymer, glass)Godavari4 variants
SampleInsulators (porcelain, polymer, glass) Godavari · GOD-517 series
- Voltage and strength
- 66 kV 70 kN to 400 kV 160 kN (see variants)
- Material
- Toughened glass
- Type
- Strain
- Failing load
- 120 kN
- Creepage
- 31 mm/kV
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 5 nos
OHE masts, cantilevers & catenaryMahanadifaraday6 variants
SampleOHE masts, cantilevers & catenary Mahanadifaraday · MAH-C26 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 2 nos
Numerical relaysDwaraka3 variants
Dwaraka · DWA-9E4 series
- Function
- Transformer differential to Busbar differential (see variants)
- Aux supply
- 24-250 V DC
- CT input
- 1/5 A selectable
- VT input
- 63.5 V
- Binary inputs
- 16
Lead time 3-6 weeks · Warranty 24 months · MOQ 5 nos
Transformer monitoring (online DGA, bushing monitors)Ellora3 variants
SampleTransformer monitoring (online DGA, bushing monitors) Ellora · ELL-382 series
- Gases monitored
- Single gas (H2) to 7 gases (see variants)
- Gases measured
- H2, CO, C2H2
- Technology
- Infrared
- Measurement interval
- 4 hours
- Accuracy
- +/- 5%
Lead time 8-10 weeks · Warranty 36 months with AMC · MOQ 2 nos
Lattice towers & monopolesSuryamax3 variants
SampleLattice towers & monopoles Suryamax · SUR-527 series
- Voltage class
- 132 kV to 400 kV (see variants)
- Type
- Tubular
- Circuit
- Single
- Tower type
- C 15-deg angle
- Height
- 18 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 1 MT
OHE masts, cantilevers & catenaryTaxila3 variants
SampleOHE masts, cantilevers & catenary Taxila · TAX-F81 series
- Mast type
- Portal 2-track to Tunnel bracket (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 5 nos
Line monitoring (DLR, fault passage indicators)Brahmaputraanant4 variants
SampleLine monitoring (DLR, fault passage indicators) Brahmaputraanant · BRA-379 series
- Voltage class
- 66 kV to 400 kV (see variants)
- Device
- Sag monitor
- Measured
- Sag
- Accuracy
- +/- 1 deg C
- Communication
- Satellite
Lead time 3-5 weeks · Warranty 24 months · MOQ 5 nos
Lattice towers & monopolesSabarmati6 variants
SampleLattice towers & monopoles Sabarmati · SAB-529 series
- Voltage class
- 33 kV to 765 kV (see variants)
- Type
- Tubular
- Circuit
- Single
- Tower type
- B 2-deg angle
- Height
- 13 m
Lead time 8-12 weeks · Warranty 12 months · MOQ 2 MT
Lattice towers & monopolesGodavari6 variants
SampleLattice towers & monopoles Godavari · GOD-803 series
- Voltage class
- 33 kV to 765 kV (see variants)
- Type
- Tubular
- Circuit
- Double
- Tower type
- C 15-deg angle
- Height
- 90 m
Lead time 8-12 weeks · Warranty As per contract · MOQ 2 MT
Distribution transformersJalline3 variants
SampleDistribution transformers Jalline · JAL-C12 series
- Rating
- 25 kVA to 100 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Vector group
- Dyn11
- Cooling
- ONAN
- Energy efficiency level
- Amorphous
Lead time 2-3 weeks · Warranty 18 months from supply · MOQ 1 nos
Traction substations & transformersKakatiya4 variants
SampleTraction substations & transformers Kakatiya · KAK-D44 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Single-phase
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
Insulators (porcelain, polymer, glass)Dhruvmax3 variants
SampleInsulators (porcelain, polymer, glass) Dhruvmax · DHR-D49 series
- Voltage and strength
- 132 kV 90 kN to 400 kV 160 kN (see variants)
- Material
- Silicone polymer
- Type
- Pin
- Failing load
- 160 kN
- Creepage
- 31 mm/kV
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Disturbance recorders & PMUsSahyadri5 variants
SampleDisturbance recorders & PMUs Sahyadri · SAH-7F1 series
- Channels
- 8 analog to 96 analog (see variants)
- Sampling rate
- 20 kHz
- Time sync
- GPS
- Accuracy
- 0.1% FS
- Reporting rate
- 25 fps
Lead time 10-14 weeks · Warranty 36 months · MOQ 1 nos