Lattice towers & monopolesKonkangrid6 variants
SampleLattice towers & monopoles Konkangrid · KON-802 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Type
- Monopole
- Circuit
- Single
- Tower type
- D dead end
- Height
- 28 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 2 MT
Inverter duty transformersMauryajal5 variants
SampleInverter duty transformers Mauryajal · MAU-F56 series
- Rating
- 2.5 MVA to 6.3 MVA (see variants)
- Voltage ratio
- 33/0.8 kV
- Windings
- Three (split LV)
- Vector group
- Dy11y11
- Cooling
- ONAN
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 10 nos
SF6 circuit breakersHoysalasudarshan4 variants
SampleSF6 circuit breakers Hoysalasudarshan · HOY-2E2 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Rated current
- 2000 A
- Breaking current
- 50 kA
- Operating mechanism
- Hydraulic spring
- Operation
- Single-pole
Lead time 24-30 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Insulators (porcelain, polymer, glass)Kanchi5 variants
SampleInsulators (porcelain, polymer, glass) Kanchi · KAN-519 series
- Voltage and strength
- 11 kV 45 kN to 220 kV 120 kN (see variants)
- Material
- Silicone polymer
- Type
- Suspension
- Failing load
- 160 kN
- Creepage
- Anti-fog 40 mm/kV
Lead time 3-5 weeks · Warranty 30 months from supply · MOQ 10 nos
Hardware fittings & dampersSuryamax6 variants
SampleHardware fittings & dampers Suryamax · SUR-0D8 series
- Conductor type
- Dog to Quad Moose (see variants)
- Component
- Earthwire clamp
- Material
- Forged aluminium alloy
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 24 months · MOQ 10 nos
Transformer monitoring (online DGA, bushing monitors)Madurai4 variants
SampleTransformer monitoring (online DGA, bushing monitors) Madurai · MAD-381 series
- Gases monitored
- Single gas (H2) to 9 gases (see variants)
- Gases measured
- H2, CO
- Technology
- Gas chromatography
- Measurement interval
- 1 hour
- Accuracy
- +/- 5%
Lead time 8-10 weeks · Warranty 24 months · MOQ 5 nos
ACSR, AAAC & HTLS conductorsPrakashtek3 variants
SampleACSR, AAAC & HTLS conductors Prakashtek · PRA-AB1 series
- Conductor
- Rabbit to Panther (see variants)
- Type
- HTLS (ACCC)
- Stranding
- 54/7
- Aluminium area
- 400 mm2
- Overall diameter
- 21 mm
Lead time 6-8 weeks · Warranty 12 months · MOQ 1 km
ACSR, AAAC & HTLS conductorsGodavari3 variants
SampleACSR, AAAC & HTLS conductors Godavari · GOD-D44 series
- Conductor
- Dog to Wolf (see variants)
- Type
- ACSR
- Stranding
- 54/7
- Aluminium area
- 100 mm2
- Overall diameter
- 21 mm
Lead time 6-8 weeks · Warranty As per contract · MOQ 1 km
Neutral grounding resistorsMadurai4 variants
SampleNeutral grounding resistors Madurai · MAD-C19 series
- Rated current
- 200 A to 1500 A (see variants)
- System voltage
- 3.3 kV
- Resistance
- 10 ohm
- Time rating
- 60 s
- Element
- Liquid electrolyte
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Isolators & earth switchesUjjayini5 variants
SampleIsolators & earth switches Ujjayini · UJJ-0A6 series
- System voltage
- 12 kV to 245 kV (see variants)
- Rated current
- 800 A
- Type
- Pantograph
- Earth switch
- Without
- Short-time current
- 31.5 kA
Lead time 10-14 weeks · Warranty 24 months · MOQ 5 nos
Isolators & earth switchesMarwarsudarshan4 variants
SampleIsolators & earth switches Marwarsudarshan · MAR-1C1 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Rated current
- 1250 A
- Type
- Pantograph
- Earth switch
- With 1 earth switch
- Short-time current
- 31.5 kA
Lead time 10-14 weeks · Warranty 24 months · MOQ 2 nos
Hardware fittings & dampersCoromandelakash6 variants
SampleHardware fittings & dampers Coromandelakash · COR-8B5 series
- Conductor type
- Rabbit to Twin Moose (see variants)
- Component
- Spacer
- Material
- Forged aluminium alloy
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Surge arresters (station class)Malabarojas6 variants
SampleSurge arresters (station class) Malabarojas · MAL-8C3 series
- System voltage
- 12 kV to 420 kV (see variants)
- Rated voltage
- 192 kV
- Nominal discharge current
- 20 kA
- Line discharge class
- Class 5
- Housing
- Porcelain
Lead time 3-5 weeks · Warranty 36 months · MOQ 1 nos
Auxiliary, trip & timer relaysHoysala5 variants
SampleAuxiliary, trip & timer relays Hoysala · HOY-A12 series
- Coil voltage
- 24 V DC to 230 V AC (see variants)
- Relay type
- Auxiliary 95
- Contacts
- 8NO
- Contact rating
- 10 A
- Operate time
- < 10 ms
Lead time 1-2 weeks · Warranty 24 months · MOQ 1 nos
Instrument transformers (CT, PT, CVT)Mauryajal5 variants
SampleInstrument transformers (CT, PT, CVT) Mauryajal · MAU-C49 series
- System voltage
- 33 kV to 400 kV (see variants)
- Type
- CVT
- Ratio
- 100-200/1 A
- Accuracy class
- 1.0
- Burden
- 30 VA
Lead time 10-14 weeks · Warranty 18 months · MOQ 10 nos
Traction substations & transformersKakatiya4 variants
SampleTraction substations & transformers Kakatiya · KAK-068 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos
ACSR, AAAC & HTLS conductorsMarwar4 variants
SampleACSR, AAAC & HTLS conductors Marwar · MAR-811 series
- Conductor
- Moose to Quad Moose (see variants)
- Type
- AAAC
- Stranding
- 6/1
- Aluminium area
- 50 mm2
- Overall diameter
- 9.6 mm
Lead time 6-8 weeks · Warranty As per contract · MOQ 5 km
Hybrid & dead-tank switchgearMalabarojas4 variants
SampleHybrid & dead-tank switchgear Malabarojas · MAL-251 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Dead tank
- Rated current
- 2000 A
- Breaking current
- 50 kA
- Gas
- SF6
Lead time 28-36 weeks · Warranty 36 months · MOQ 10 nos
Distribution transformersHampiohm5 variants
SampleDistribution transformers Hampiohm · HAM-F82 series
- Rating
- 63 kVA to 500 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Vector group
- Dyn11
- Cooling
- ONAN
- Energy efficiency level
- Amorphous
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Transformer monitoring (online DGA, bushing monitors)Konark4 variants
SampleTransformer monitoring (online DGA, bushing monitors) Konark · KON-879 series
- Gases monitored
- Single gas (H2) to 9 gases (see variants)
- Gases measured
- H2, CO, C2H2
- Technology
- Infrared
- Measurement interval
- 4 hours
- Accuracy
- +/- 5%
Lead time 8-10 weeks · Warranty 36 months with AMC · MOQ 1 nos
Gas-insulated switchgear (GIS)Madurai5 variants
SampleGas-insulated switchgear (GIS) Madurai · MAD-D32 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 3150 A
- Short-circuit current
- 50 kA
- Configuration
- Single bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 24 months · MOQ 1 bay
Shunt & series reactorsSamarthtek5 variants
SampleShunt & series reactors Samarthtek · SAM-2C5 series
- Rating
- 5 MVAr to 80 MVAr (see variants)
- System voltage
- 33 kV
- Type
- Neutral
- Construction
- Oil-immersed gapped core
- Phases
- Single
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Hardware fittings & dampersRavi6 variants
SampleHardware fittings & dampers Ravi · RAV-CF6 series
- Conductor type
- Dog to Quad Moose (see variants)
- Component
- Spacer
- Material
- Forged aluminium alloy
- Rated load
- 70 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 24 months · MOQ 5 nos
Inverter duty transformersAjantajyoti4 variants
SampleInverter duty transformers Ajantajyoti · AJA-7B7 series
- Rating
- 3.15 MVA to 6.3 MVA (see variants)
- Voltage ratio
- 33/0.69/0.69 kV
- Windings
- Three (split LV)
- Vector group
- Dyn11
- Cooling
- ONAN
Lead time 10-14 weeks · Warranty 24 months from commissioning · MOQ 1 nos