Home & building automationBeasfaraday4 variants
SampleHome & building automation Beasfaraday · BEA-0D4 series
- Channels
- 1-channel to 8-channel (see variants)
- Protocol
- Wi-Fi
- Supply voltage
- 24 V DC
- Load per channel
- 16 A
- Control
- Scene / schedule
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Changeover switches & ATS panelsCoromandelampere6 variants
SampleChangeover switches & ATS panels Coromandelampere · COR-BE9 series
- Rating
- 125 A to 1600 A (see variants)
- Type
- Motorised changeover
- Poles
- 4P
- Rated voltage
- 415 V AC
- Transfer device
- Switch-disconnector
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
LED indoor & office lightingOhmgen5 variants
SampleLED indoor & office lighting Ohmgen · OHM-861 series
- Wattage
- 18 W to 50 W (see variants)
- Form factor
- High-bay
- Size
- 1200x300 mm
- Colour temperature
- 3000 K
- CRI
- Above 90
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 10 nos
Fans & ventilationTeesta5 variants
Teesta · TEE-9D6 series
- Sweep
- 450 mm to 1400 mm (see variants)
- Fan type
- Pedestal
- Motor
- Induction
- Power
- 250 W
- Speed
- 350 RPM
Lead time 1-2 weeks · Warranty 36 months from supply · MOQ 2 nos
MV metal-clad switchboards (11–33 kV)Lohacore5 variants
SampleMV metal-clad switchboards (11–33 kV) Lohacore · LOH-363 series
- Rating
- 11 kV 1250 A to 33 kV 2000 A (see variants)
- Insulation
- Air-insulated
- Short-circuit rating
- 40 kA/3 s
- Panel function
- Capacitor bank feeder
- Busbar
- Double busbar
Lead time 8-10 weeks · Warranty 18 months from commissioning · MOQ 1 nos
DCIM softwareUjjayini3 variants
SampleServiceDCIM software Ujjayini · UJJ-6E4 series
- Scope
- Up to 100 racks to Up to 500 racks (see variants)
- Licence type
- Annual subscription
- Deployment
- SaaS
- Monitoring points
- Up to 500
- Protocols
- Modbus TCP
Lead time 1-2 weeks · Warranty Updates for 12 months · MOQ 1 licence
Fans & ventilationMadurai3 variants
Madurai · MAD-D07 series
- Sweep
- 450 mm to 900 mm (see variants)
- Fan type
- Ceiling
- Motor
- Induction
- Power
- 750 W
- Speed
- 1400 RPM
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Solar street lightsIndraprastha3 variants
SampleSolar street lights Indraprastha · IND-F79 series
- Wattage
- 12 W to 24 W (see variants)
- Battery
- Lead-acid tubular
- Battery capacity
- 12.8 V 12 Ah
- Solar panel
- Mono PERC 100 Wp
- Controller
- MPPT
Lead time 4-5 weeks · Warranty 60 months on LED and panel · MOQ 1 set
Contactors, overload relays & motor startersMarwar5 variants
SampleContactors, overload relays & motor starters Marwar · MAR-568 series
- Rating
- 18 A to 185 A (see variants)
- Device type
- Overload relay
- Coil voltage
- 24 V AC
- Utilisation category
- AC-1
- Motor rating at 415 V
- 132 kW
Lead time 1-2 weeks · Warranty 18 months from supply · MOQ 5 nos
Conduits, boxes & fittingsArctron3 variants
SampleConduits, boxes & fittings Arctron · ARC-625 series
- Nominal diameter
- 20 mm to 32 mm (see variants)
- Material
- Mild steel GI
- Wall class
- Light
- Length
- 3 m
- Colour
- Orange
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 10 m
Service connections & meter boxesNalanda5 variants
SampleService connections & meter boxes Nalanda · NAL-0A2 series
- Capacity
- 2 meters to 12 meters (see variants)
- Material
- CRCA steel
- Phase
- Three phase
- Meter type
- Smart / prepaid
- Degree of protection
- IP54
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
VCB panelsSamarthmax6 variants
Samarthmax · SAM-B73 series
- Rating
- 11 kV 630 A to 33 kV 1250 A (see variants)
- Short-circuit rating
- 40 kA/3 s
- Construction
- Metal-enclosed fixed
- Breaker operating duty
- O-0.3 s-CO-3 min-CO
- Control voltage
- 220 V DC
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 1 nos
Industrial & hazardous-area lightingKrishna3 variants
SampleIndustrial & hazardous-area lighting Krishna · KRI-801 series
- Wattage
- 40 W to 100 W (see variants)
- Protection concept
- Ex nR
- Gas group
- IIC
- Zone
- Zone 1
- Temperature class
- T5
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos
Static transfer switchesVindhyaneel5 variants
SampleStatic transfer switches Vindhyaneel · VIN-C26 series
- Rating
- 63 A to 800 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 230 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Break-before-make
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Lighting poles & armsKamrup6 variants
SampleLighting poles & arms Kamrup · KAM-118 series
- Height
- 7.5 m to 20 m (see variants)
- Pole shape
- Octagonal
- Material
- Aluminium
- Wall thickness
- 3 mm
- Galvanising
- Hot dip 120 micron
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
MV metal-clad switchboards (11–33 kV)Lonavala6 variants
SampleMV metal-clad switchboards (11–33 kV) Lonavala · LON-B84 series
- Rating
- 11 kV 630 A to 33 kV 2000 A (see variants)
- Insulation
- Air-insulated
- Short-circuit rating
- 25 kA/3 s
- Panel function
- Capacitor bank feeder
- Busbar
- Single busbar
Lead time 8-10 weeks · Warranty 18 months from commissioning · MOQ 1 nos
Drop-out fuses & HRC fuse unitsNarmadasetu3 variants
SampleDrop-out fuses & HRC fuse units Narmadasetu · NAR-F59 series
- Rating
- 24 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 12 kV
- Interrupting capacity
- 12.5 kA
- Fuse tube
- Fibre-lined
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Static transfer switchesThanjavurdhruv4 variants
SampleStatic transfer switches Thanjavurdhruv · THA-844 series
- Rating
- 250 A to 1600 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 230 V AC
- Transfer time
- Below 4 ms
- Transfer type
- Make-before-break
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Bus ductsNilgirisudarshan6 variants
Nilgirisudarshan · NIL-207 series
- Rating
- 1000 A to 5000 A (see variants)
- Conductor
- Aluminium
- Rated voltage
- 690 V
- Construction
- Air-insulated
- Short-circuit withstand
- 65 kA/1 s
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 m
MCB distribution boardsArctron5 variants
SampleMCB distribution boards Arctron · ARC-121 series
- Ways
- 6-way to 24-way (see variants)
- Type
- TPN
- Incomer
- MCB 63 A
- Rated current
- 32 A
- Rated voltage
- 240 V
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Ring main units (RMU)Vindhya3 variants
SampleRing main units (RMU) Vindhya · VIN-EC1 series
- Configuration
- 2-way (LBS+LBS) to 3-way (LBS+LBS+VCB) (see variants)
- Rated voltage
- 12 kV
- Rated current - ring
- 630 A
- Transformer feeder
- 630 A VCB
- Short-circuit rating
- 25 kA/3 s
Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 1 nos
LED indoor & office lightingShivalik4 variants
SampleLED indoor & office lighting Shivalik · SHI-862 series
- Wattage
- 22 W to 50 W (see variants)
- Form factor
- High-bay
- Size
- 1200x300 mm
- Colour temperature
- 4000 K
- CRI
- Above 80
Lead time 1-2 weeks · Warranty 36 months from supply · MOQ 1 nos
Static transfer switchesSatavahana5 variants
SampleStatic transfer switches Satavahana · SAT-697 series
- Rating
- 63 A to 800 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 415 V AC
- Transfer time
- Below 4 ms
- Transfer type
- Make-before-break
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos
Precision coolingKonark5 variants
Konark · KON-DC6 series
- Cooling capacity
- 15 kW to 80 kW (see variants)
- Type
- DX water-cooled
- Airflow
- In-row
- Compressor
- Not applicable
- Fan
- Backward-curved EC
Lead time 8-10 weeks · Warranty 24 months from supply · MOQ 5 nos