EOT & gantry cranes, hoistsArcmark5 variants
SampleEOT & gantry cranes, hoists Arcmark · ARC-2E4 series
- Capacity
- 3 t to 32 t (see variants)
- Span
- 15 m
- Duty class
- M4
- Hoisting speed
- 8 m/min
- Lift height
- 6 m
Lead time 10-12 weeks · Warranty 18 months from supply · MOQ 10 nos
Voltage stabilisersDoaba3 variants
SampleVoltage stabilisers Doaba · DOA-C14 series
- Rating
- 25 kVA to 100 kVA (see variants)
- Input range
- 160-270 V (1-ph)
- Output voltage
- 230 V ±1%
- Phases
- 1-ph
- Correction speed
- 35 V/s (servo)
Lead time 1-2 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Project finance & debt arrangementVijaya5 variants
SampleServiceProject finance & debt arrangement Vijaya · VIJ-CD1 series
- Project cost
- INR 50 crore to INR 1000 crore (see variants)
- Mandate
- Equity and debt
- Debt-equity
- 75:25
- Tenor
- 18 years
- Lenders approached
- Multilaterals and funds
Lead time Financial close in 3-9 months · Warranty As per mandate letter · MOQ 1 job
Hydro generatorsAkshaymark6 variants
Akshaymark · AKS-4F7 series
- Rating
- 1 MVA to 60 MVA (see variants)
- Generator voltage
- 13.8 kV
- Speed
- 500 rpm
- Power factor
- 0.9 lag
- Excitation
- Brushless
Lead time 9-12 months · Warranty 24 months · MOQ 1 nos
Load-break & AB switchesIndraprastha5 variants
SampleLoad-break & AB switches Indraprastha · IND-866 series
- Rating
- 11 kV 400 A to 33 kV 800 A (see variants)
- Switch type
- Load-break switch
- Operation
- Hookstick
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 set
SF6 gas & handlingVoltcore4 variants
Voltcore · VOL-877 series
- Cylinder size
- 5 kg to 40 kg (see variants)
- Purity
- 99.99%
- Moisture
- Below 5 ppmv
- Cylinder
- Seamless steel
- Valve
- CGA 590
Lead time 3-4 weeks · Warranty Test certificate per cylinder · MOQ 1 kg
Field instruments (pressure, temperature, flow, level)Satpura4 variants
SampleField instruments (pressure, temperature, flow, level) Satpura · SAT-E38 series
- Range / size
- 0-10 bar / DN25 to 0-250 bar / DN100 (see variants)
- Output
- FOUNDATION Fieldbus
- Accuracy
- ±0.25%
- Process connection
- G1/2
- Wetted material
- Tantalum
Lead time 2-4 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Solar cells, wafers & ingotsKalingagaruda6 variants
SampleSolar cells, wafers & ingots Kalingagaruda · KAL-3C9 series
- Format
- M6 166 mm to Wafer 182 mm (see variants)
- Cell type
- HJT
- Cell efficiency
- 22.8%
- Wafer thickness
- 150 micron
- Conductivity type
- P-type boron
Lead time 4-8 weeks · Warranty As per supply agreement · MOQ 5 nos
Plant decommissioning & dismantlingVindhya4 variants
SampleServicePlant decommissioning & dismantling Vindhya · VIN-D12 series
- Plant capacity
- 10 MW to 100 MW (see variants)
- Scope
- Dismantling only
- Technology
- Wind
- Cranes
- Heavy crawler cranes
- Material disposal
- Recycler tie-up
Lead time Planning in 2-3 weeks · Warranty Site restoration certificate · MOQ 1 MW
Data loggersHampi5 variants
Hampi · HAM-376 series
- Channels
- 4 channels to 64 channels (see variants)
- Input types
- 0-10 V
- Resolution
- 16-bit
- Sampling rate
- 100 ms min
- Memory
- 2 GB
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Electric & electrode boilersSetucore3 variants
SampleElectric & electrode boilers Setucore · SET-345 series
- Capacity
- 500 kW to 2.5 MW (see variants)
- Type
- Resistance
- Steam output
- 1.4 TPH
- Working pressure
- 35 bar
- Supply voltage
- 415 V
Lead time 14-18 weeks · Warranty 12 months · MOQ 10 nos
Transformer overhaul & oil filtrationVidarbha4 variants
SampleServiceTransformer overhaul & oil filtration Vidarbha · VID-615 series
- Transformer rating
- 1 MVA to 20 MVA (see variants)
- Service
- Oil filtration and dehydration
- Filtration machine
- Mobile 12000 L/hr
- Oil BDV target
- Above 60 kV
- Moisture target
- Below 10 ppm
Lead time Mobilisation in 3-5 days · Warranty Oil quality guarantee 6 months · MOQ 1 nos
Building wiresNanditek3 variants
Nanditek · NAN-2E3 series
- Size
- 4 sq mm to 10 sq mm (see variants)
- Coil length
- 90 m
- Conductor
- Annealed copper (class 5)
- Insulation
- FRLS PVC
- Voltage grade
- 650/1100 V
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 2 coil
Arc-flash suitsAjantajoule4 variants
Ajantajoule · AJA-A41 series
- Arc rating
- 25 cal/cm² jacket + trouser to Hood 40 cal/cm² (see variants)
- ATPV rating
- 40 cal/cm²
- PPE category
- CAT 2
- Fabric
- Multi-layer aramid
- Size range
- S to 3XL
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Fencing & gatesJalsys6 variants
Jalsys · JAL-A89 series
- Fence height
- 1.2 m to 3.0 m (see variants)
- Mesh type
- 358 anti-climb
- Wire diameter
- 4.5 mm
- Post
- 50 NB GI pipe
- Post spacing
- 2.5 m
Lead time 1-2 weeks · Warranty 12 months against coating defects · MOQ 5 m
Torque wrenches & bolt tensioningMagadhrajat6 variants
SampleTorque wrenches & bolt tensioning Magadhrajat · MAG-546 series
- Torque range
- 5-25 Nm to 1000-10000 Nm (see variants)
- Type
- Click type
- Drive size
- 3/8 inch
- Accuracy
- +/-1% digital
- Length
- 1200 mm
Lead time 3-5 weeks · Warranty Re-calibration after 5000 cycles · MOQ 10 set
Packing & cratingMunnar4 variants
SampleServicePacking & crating Munnar · MUN-DD1 series
- Packing volume
- 5 CBM to 100 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- Desiccant and moisture barrier
- Marking
- Project-specific labelling
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty As per terms · MOQ 1 lot
Trade credit & export insuranceTaxila5 variants
SampleServiceTrade credit & export insurance Taxila · TAX-514 series
- Insured turnover
- INR 5 crore to INR 500 crore (see variants)
- Cover type
- Key accounts
- Cover percentage
- 90%
- Territory
- India only
- Buyer risk
- Commercial default
Lead time Policy in 1-2 weeks · Warranty Claims support · MOQ 1 job
Aerial work platforms & boom liftsAravali6 variants
SampleFor rentAerial work platforms & boom lifts Aravali · ARA-767 series
- Working height
- 8 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 230 kg
- Drive
- Electric
- Outreach
- 10 m
- Insulation
- Not insulated
Lead time 1-2 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Capacitors, resistors & magneticsChola3 variants
SampleCapacitors, resistors & magnetics Chola · CHO-F37 series
- Value
- 100 µF to 1000 µF (see variants)
- Rated voltage
- 630 VDC
- Capacitor type
- MKP film
- Tolerance
- ±10%
- Temperature range
- -40 to 85 °C
Lead time 6-10 weeks · Warranty 12 months from supply · MOQ 1 nos
Asset & O&M managementPallava5 variants
SampleAsset & O&M management Pallava · PAL-E28 series
- Capacity covered
- Up to 25 MWp to Portfolio unlimited (see variants)
- Deployment
- Cloud SaaS
- Users
- 50
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty 12 months support · MOQ 2 licence
Fuel-gas conditioning & pressure-reducing skidsGupta6 variants
SampleFuel-gas conditioning & pressure-reducing skids Gupta · GUP-673 series
- Flow capacity
- 1000 Sm3/h to 100000 Sm3/h (see variants)
- Inlet pressure
- 16-70 bar
- Outlet pressure
- 4 bar
- Pressure regulation
- Active-monitor redundant
- Filtration
- Coalescer separator, 5 micron
Lead time 16-22 weeks · Warranty 18 months · MOQ 10 nos
Geotextiles & slope protectionPataliputrasetu5 variants
SampleGeotextiles & slope protection Pataliputrasetu · PAT-A64 series
- Mass per unit area
- 100 gsm to 400 gsm (see variants)
- Material
- Polypropylene
- Construction
- Geocell
- Roll width
- 4 m
- Roll length
- 100 m
Lead time 3 weeks · Warranty 12 months from supply · MOQ 10 sq m
Solar & wind BoP constructionShaktimax6 variants
SampleServiceSolar & wind BoP construction Shaktimax · SHA-8C8 series
- Project size
- 10 MW to 400 MW (see variants)
- Scope
- Complete BoP except modules
- DC cables
- 4 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW