Ester oils (natural & synthetic)Nalanda5 variants
SampleEster oils (natural & synthetic) Nalanda · NAL-B51 series
- Pack size
- 20 litre to Bulk 20000 litre (see variants)
- Type
- Natural ester
- Flash point
- Min 250 deg C
- Fire point
- Min 340 deg C
- Viscosity at 40 deg C
- Max 29 cSt
Lead time 1-2 weeks · Warranty 12 months in sealed container · MOQ 1 litre
Solar & wind BoP constructionDeepmark6 variants
SampleServiceSolar & wind BoP construction Deepmark · DEE-F34 series
- Project size
- 5 MW to 200 MW (see variants)
- Scope
- Civil plus electrical BoP
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time Mobilisation in 14 days · Warranty Workmanship 12 months · MOQ 1 MW
Insulated hand tools (1000 V)Magadhrajat5 variants
SampleInsulated hand tools (1000 V) Magadhrajat · MAG-608 series
- Kit size
- 8 pieces to 40 pieces (see variants)
- Rated voltage
- 1000 V AC
- Material
- Chrome molybdenum
- Insulation
- Dipped
- Handle colour
- Orange
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 set
Gas-insulated switchgear (GIS)Sahyadri5 variants
SampleGas-insulated switchgear (GIS) Sahyadri · SAH-7A9 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 4000 A
- Short-circuit current
- 40 kA
- Configuration
- Double bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 24 months · MOQ 1 bay
PCBs & electronic assembliesTirhutohm6 variants
SamplePCBs & electronic assemblies Tirhutohm · TIR-232 series
- Layers / type
- Single-sided to Metal-core (1 layer) (see variants)
- Base material
- FR-4 Tg 170
- Copper weight
- 6 oz
- Board thickness
- 1.0 mm
- Surface finish
- OSP
Lead time 1-2 weeks · Warranty As per purchase order · MOQ 1 nos
Static transfer switchesVindhyaneel5 variants
SampleStatic transfer switches Vindhyaneel · VIN-C26 series
- Rating
- 63 A to 800 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 230 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Break-before-make
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Wind resource assessment (met masts, LiDAR, SoDAR)Ojasgen6 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Ojasgen · OJA-FF6 series
- Measurement height
- 50 m to 200 m (see variants)
- Instrument type
- Met mast
- Mast construction
- Lattice
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 12
Lead time 4-6 weeks · Warranty 12 months · MOQ 10 set
Motor & transformer rewindingGodavari5 variants
SampleServiceMotor & transformer rewinding Godavari · GOD-375 series
- Machine rating
- Up to 5 kW to 100 kVA transformer (see variants)
- Equipment
- Distribution transformer
- Conductor
- Aluminium
- Insulation class
- Class F
- Process
- VPI
Lead time 2-4 weeks · Warranty 12 months on rewinding · MOQ 1 nos
Fleet & depot charging systemsBeasamrit5 variants
SampleFleet & depot charging systems Beasamrit · BEA-156 series
- Buses served
- 10 buses to 200 buses (see variants)
- Charger rating
- 240 kW
- Charging type
- Pantograph
- Dispensers
- 25
- Power cabinet
- Shared pool, 480 kW
Lead time 8-12 weeks · Warranty 24 months · MOQ 5 set
Hybrid & off-grid inverters, charge controllersSamarthline6 variants
SampleHybrid & off-grid inverters, charge controllers Samarthline · SAM-FE8 series
- Rated power
- 3 kVA to 30 kVA (see variants)
- Battery voltage
- 192 V
- Battery type
- Lead-acid
- Max PV input
- 3000 W
- Controller type
- PWM
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Protective coatings & wrapsKakatiyatej3 variants
SampleProtective coatings & wraps Kakatiyatej · KAK-699 series
- Pack size
- 10 litre to 50 litre (see variants)
- Coating type
- Polyurethane
- Number of packs
- Two pack
- Dry film thickness
- 75 micron
- Solid by volume
- 55%
Lead time 1-2 weeks · Warranty 10 years coating life as per system · MOQ 1 litre
Flow batteriesPallavaswarna5 variants
Pallavaswarna · PAL-F36 series
- Discharge duration
- 4 hours to 12 hours (see variants)
- Chemistry
- Vanadium redox
- Rated power
- 1 MW
- Round-trip efficiency
- 65-72%
- Cycle life
- 15000 cycles
Lead time 16-20 weeks · Warranty 20 years design life · MOQ 10 kWh
Tower erection gin poles & derricksTeesta5 variants
SampleTower erection gin poles & derricks Teesta · TEE-486 series
- Safe working load
- 500 kg to 5 t (see variants)
- Pole type
- Lattice
- Pole length
- 9 m
- Material
- Aluminium alloy
- Winch
- Electric
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 set
Welding consumablesHoysalaanant5 variants
SampleWelding consumables Hoysalaanant · HOY-602 series
- Electrode / wire diameter
- 2.5 mm to 0.8 mm wire (see variants)
- Classification
- E6013
- Coating
- Basic low hydrogen
- Current type
- DC+
- Tensile strength
- Min 420 MPa
Lead time 1-2 weeks · Warranty 12 months shelf life in sealed pack · MOQ 1 kg
Disturbance recorders & PMUsSabarmatideep3 variants
SampleDisturbance recorders & PMUs Sabarmatideep · SAB-C85 series
- Channels
- 32 analog to 96 analog (see variants)
- Sampling rate
- 20 kHz
- Time sync
- IRIG-B
- Accuracy
- 0.1% FS
- Reporting rate
- 50 fps
Lead time 6-8 weeks · Warranty 36 months · MOQ 2 nos
Multimeters, clamp meters & insulation testersNarmadaphase3 variants
SampleMultimeters, clamp meters & insulation testers Narmadaphase · NAR-4D6 series
- Maximum current / voltage range
- 1000 A to 2000 A (see variants)
- Measurement
- Resistance
- Display count
- 10000
- Accuracy
- 1%
- Safety rating
- CAT III 600 V
Lead time 3-7 days · Warranty 3 years limited · MOQ 1 nos
Thermal camerasSudarshanmark4 variants
Sudarshanmark · SUD-109 series
- Detector resolution
- 160 x 120 to 384 x 288 (see variants)
- Temperature range
- -20 to 650 deg C
- Thermal sensitivity
- Below 0.05 deg C
- Accuracy
- +/-2%
- Focus
- Fixed
Lead time 1-2 weeks · Warranty 10 years detector warranty (limited) · MOQ 10 nos
Power system studies (load flow, short circuit, grid code)Ravipushpak6 variants
SampleServicePower system studies (load flow, short circuit, grid code) Ravipushpak · RAV-F17 series
- Network scale
- 11 kV plant to 400 kV system (see variants)
- Study type
- Harmonics
- Software
- PSS/E
- Model data
- Client single line diagram and data
- Deliverables
- Study report with results
Lead time 2-6 weeks · Warranty Revision for utility comments · MOQ 1 report
Auxiliary, trip & timer relaysThanjavurampere5 variants
SampleAuxiliary, trip & timer relays Thanjavurampere · THA-A18 series
- Coil voltage
- 24 V DC to 230 V AC (see variants)
- Relay type
- Timer 2
- Contacts
- 8NO
- Contact rating
- 16 A
- Operate time
- < 30 ms
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Paints & anti-corrosion coatingsVayutron4 variants
SamplePaints & anti-corrosion coatings Vayutron · VAY-168 series
- Pack size
- 1 litre to 20 litre (see variants)
- Paint type
- Silicone
- Packs
- Two pack
- Dry film thickness
- 100 micron
- Colour
- Light grey RAL 7035
Lead time 1-2 weeks · Warranty 5 years coating life per system · MOQ 5 litre
Procurement & sourcing servicesMaurya3 variants
SampleServiceProcurement & sourcing services Maurya · MAU-BD8 series
- Procurement value
- INR 1 crore to INR 10 crore (see variants)
- Scope
- Full procurement cycle
- Category
- Electrical BoP
- Vendor audit
- Factory audit
- Fee model
- Percentage of purchase value
Lead time Kick-off in 3-5 days · Warranty As per contract · MOQ 1 lot
Solar thermal collectors & water heatersHoysala5 variants
SampleSolar thermal collectors & water heaters Hoysala · HOY-CD6 series
- Capacity
- 300 LPD to 5000 LPD (see variants)
- Collector type
- Heat pipe ETC
- Tank material
- SS 304
- Tank insulation
- PUF 50 mm
- System type
- Thermosyphon
Lead time 1-2 weeks · Warranty 5 years on tank · MOQ 1 nos
Hydro turbines (Francis, Kaplan, Pelton)Magadhshikhar4 variants
SampleHydro turbines (Francis, Kaplan, Pelton) Magadhshikhar · MAG-AA6 series
- Turbine output
- 3 MW to 25 MW (see variants)
- Turbine type
- Bulb
- Net head
- 5-30 m
- Rated speed
- 428 rpm
- Shaft orientation
- Vertical
Lead time 10-14 months · Warranty 24 months from commissioning · MOQ 1 nos
Primary & secondary injection kitsShivalik3 variants
SamplePrimary & secondary injection kits Shivalik · SHI-BB2 series
- Output current
- 1000 A to 3000 A (see variants)
- Output voltage
- 24 V
- Duty cycle
- Short time 5 min
- Supply
- 230 V AC
- Meters
- Built-in timer
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 set