Neutral grounding resistorsPrithvicore3 variants
SampleNeutral grounding resistors Prithvicore · PRI-564 series
- Rated current
- 200 A to 800 A (see variants)
- System voltage
- 6.6 kV
- Resistance
- 100 ohm
- Time rating
- Continuous
- Element
- Liquid electrolyte
Lead time 4-6 weeks · Warranty 18 months · MOQ 10 nos
Voltage detectors & discharge / earthing rodsUjjayinivolt5 variants
SampleVoltage detectors & discharge / earthing rods Ujjayinivolt · UJJ-086 series
- Voltage range
- LT 90-1000 V to 132 kV (see variants)
- Type
- Contact type
- Indication
- Audio-visual alarm
- Self-test
- Yes
- Insulating stick
- Telescopic, FRP
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
ElectrolysersGridcore5 variants
Gridcore · GRI-6C4 series
- Hydrogen output
- 50 Nm3/h to 1000 Nm3/h (see variants)
- Technology
- AEM
- Operating pressure
- Atmospheric
- H2 purity
- 99.9%
- Specific energy
- 5.2 kWh/Nm3
Lead time 16-24 weeks · Warranty Stack warranty 5 years or 40000 hours · MOQ 2 nos
Cranes & hydrasNandigen5 variants
SampleFor rentCranes & hydras Nandigen · NAN-E92 series
- Crane capacity
- 8 t hydra to 80 t (see variants)
- Boom length
- 45 m
- Operator
- Not included
- Fuel
- Client scope
- Minimum hire
- 1 month
Lead time Same day to 1 day · Warranty Breakdown replacement within 48 h · MOQ 1 nos
FastenersSatpura4 variants
Satpura · SAT-533 series
- Bolt size
- M16 to M30 (see variants)
- Grade
- 10.9
- Material
- SS 316
- Finish
- Hot-dip galvanised
- Length
- 75 mm
Lead time 3-7 days · Warranty 12 months against coating defects · MOQ 10 kg
Auto-reclosers & sectionalisersPataliputra4 variants
SampleAuto-reclosers & sectionalisers Pataliputra · PAT-718 series
- Rating
- 11 kV 630 A 16 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- SF6
- Insulation
- Silicone rubber
- Mounting
- Substation structure
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 1 nos
Civil & foundation worksRavikiran4 variants
SampleServiceCivil & foundation works Ravikiran · RAV-478 series
- Works volume
- 1 MW equivalent to 25 MW equivalent (see variants)
- Foundation type
- Ramming or screw pile
- Concrete grade
- M25
- Pull-out testing
- 2% piles tested
- Reinforcement
- Fe 550D
Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job
Traction substations & transformersMahanadifaraday4 variants
SampleTraction substations & transformers Mahanadifaraday · MAH-D42 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Scott
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Geotextiles & slope protectionShivalikgrid3 variants
SampleGeotextiles & slope protection Shivalikgrid · SHI-816 series
- Mass per unit area
- 200 gsm to 400 gsm (see variants)
- Material
- HDPE
- Construction
- Needle punched non-woven
- Roll width
- 5 m
- Roll length
- 100 m
Lead time 3 weeks · Warranty 12 months from supply · MOQ 1 sq m
PCC, MCC, ACDB, DCDBHampitej6 variants
SamplePCC, MCC, ACDB, DCDB Hampitej · HAM-103 series
- Rating
- 400 A to 4000 A (see variants)
- Panel type
- DCDB
- System voltage
- 415 V AC
- Short-circuit rating
- 25 kA/1 s
- Form of separation
- Form 3b
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Digital twins & analyticsRavi3 variants
SampleDigital twins & analytics Ravi · RAV-9A1 series
- Plant size
- Up to 100 MW to Up to 500 MW (see variants)
- Deployment
- Cloud SaaS
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 3-4 weeks · Warranty Support as per agreement · MOQ 1 licence
Aluminium rods, busbars & sectionsParammax3 variants
SampleAluminium rods, busbars & sections Parammax · PAR-D93 series
- Size
- 100 x 10 mm to 100 mm OD tube (see variants)
- Grade
- 6101 T6
- Conductivity
- Min 61% IACS
- Temper
- O
- Form
- Flat bar
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 1 kg
Insulating materials (pressboard, paper, mica, resins)Nalanda5 variants
SampleInsulating materials (pressboard, paper, mica, resins) Nalanda · NAL-0A6 series
- Thickness / grade
- 1 mm to 8 mm (see variants)
- Material
- Pressboard high density
- Density
- 1.25 g/cc
- Dielectric strength
- Min 12 kV/mm
- Form
- Sheet
Lead time 1-2 weeks · Warranty 12 months shelf life · MOQ 5 kg
Solar plant O&M & module cleaningSahyadriakshay6 variants
SampleServiceSolar plant O&M & module cleaning Sahyadriakshay · SAH-D99 series
- Plant capacity
- 1 MWp to 100 MWp (see variants)
- Scope
- Full O&M with spare management
- Cleaning method
- Waterless dry brush
- Cleaning frequency
- Monthly in monsoon
- Availability guarantee
- Grid availability 99.5%
Lead time Baseline audit before takeover · Warranty Service credits as per contract · MOQ 1 MWp
Numerical relaysMalabarsurya4 variants
Malabarsurya · MAL-9E6 series
- Function
- Motor protection to Line distance (see variants)
- Aux supply
- 110 V DC
- CT input
- 1/5 A selectable
- VT input
- 63.5 V
- Binary inputs
- 16
Lead time 3-6 weeks · Warranty 24 months · MOQ 10 nos
Recruitment servicesMahabaleshwarflux6 variants
SampleServiceRecruitment services Mahabaleshwarflux · MAH-319 series
- Role seniority
- Technician to General manager (see variants)
- Fee basis
- Percentage of annual CTC
- Search
- Targeted headhunting
- Screening
- Assessment centre
- Verification
- Criminal and credit check
Lead time Shortlist in 7-15 days · Warranty Fee refund if candidate leaves early · MOQ 1 case
Module cleaning systemsTeslamark3 variants
SampleModule cleaning systems Teslamark · TES-E09 series
- Plant capacity covered
- 500 kWp to 5 MWp (see variants)
- Cleaning method
- Waterless
- Drive
- Battery electric
- Row length handled
- Up to 100 m
- Cleaning speed
- 6 m/min
Lead time 4-6 weeks · Warranty 24 months on drive unit · MOQ 1 set
Gas turbinesLonavalavajra5 variants
Lonavalavajra · LON-1E3 series
- ISO rating
- 1 MW to 50 MW (see variants)
- Type
- Industrial
- Fuel
- Dual fuel gas / HSD
- Efficiency
- 33%
- Exhaust temperature
- 480 C
Lead time 18-26 months · Warranty 24 months · MOQ 10 nos
Towers & foundationsDoaba4 variants
SampleTowers & foundations Doaba · DOA-707 series
- Hub height
- 110 m to 160 m (see variants)
- Tower type
- Hybrid concrete steel
- Section count
- 5
- Steel grade
- S355NL
- Wall thickness
- 14-40 mm
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 nos
Instrument transformers (CT, PT, CVT)Amaravati5 variants
SampleInstrument transformers (CT, PT, CVT) Amaravati · AMA-C44 series
- System voltage
- 11 kV to 220 kV (see variants)
- Type
- Current transformer
- Ratio
- 132 kV/110 V
- Accuracy class
- 0.2S
- Burden
- 50 VA
Lead time 4-6 weeks · Warranty 18 months · MOQ 10 nos
Lithium batteries for telecom & solarNarmada4 variants
SampleLithium batteries for telecom & solar Narmada · NAR-268 series
- Capacity
- 48 V 100 Ah to 51.2 V 100 Ah (see variants)
- Chemistry
- LFP
- Nominal voltage
- 48 V
- Usable energy
- 10 kWh
- Cycle life at 80% DoD
- 6000 cycles
Lead time 3-4 weeks · Warranty 5 years · MOQ 5 nos
Waste-heat recovery unitsIndraprasthaflux3 variants
SampleWaste-heat recovery units Indraprasthaflux · IND-1E2 series
- Recovered heat
- 5 MWth to 20 MWth (see variants)
- Heat source
- Kiln gas
- Gas inlet temperature
- 550 C
- Medium
- Thermal oil
- Steam pressure
- 17 bar
Lead time 18-26 weeks · Warranty 18 months · MOQ 10 nos
Resource assessment (solar, wind, hydro)Tamraline3 variants
SampleServiceResource assessment (solar, wind, hydro) Tamraline · TAM-B55 series
- Measurement duration
- 3 months to 12 months (see variants)
- Technology
- Wind
- Data source
- Satellite and reanalysis
- Equipment
- 80-120 m met mast with LiDAR
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Campaign 3-24 months · Warranty As per contract · MOQ 1 report
Type & routine testing laboratories (NABL)Rajatcore6 variants
SampleServiceType & routine testing laboratories (NABL) Rajatcore · RAJ-FB3 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan