Tariff & regulatory advisoryMaduraividyut4 variants
SampleServiceTariff & regulatory advisory Maduraividyut · MAD-3D7 series
- Matter complexity
- Advisory note to Complex petition (see variants)
- Forum
- APTEL
- Deliverable
- Petition with annexures
- Representation
- Appearance before Commission
- Data support
- Benchmark analysis
Lead time Initial note in 1 week · Warranty As per engagement letter · MOQ 1 case
Weather monitoring stationsKalinga5 variants
SampleWeather monitoring stations Kalinga · KAL-427 series
- Configuration
- Standard: GHI, POA, Tamb, Tmod to Wind mast 80 m (see variants)
- Pyranometer class
- Reference cell 2% accuracy
- Wind sensor
- Ultrasonic 2D
- Temperature sensor
- PT100 class A
- Humidity range
- 0-100% RH
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 5 set
Industrial & hazardous-area lightingPrabhasys3 variants
SampleIndustrial & hazardous-area lighting Prabhasys · PRA-004 series
- Wattage
- 100 W to 200 W (see variants)
- Protection concept
- Ex d flameproof
- Gas group
- IIC
- Zone
- Zone 2
- Temperature class
- T5
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Installation & erectionVindhyatarang5 variants
SampleServiceInstallation & erection Vindhyatarang · VIN-715 series
- Installation scope
- 10 MW to 200 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Own cranes and erection tools
Lead time Start after material at site · Warranty Defect liability 24 months · MOQ 1 MW
Data loggersVaigaishakti3 variants
Vaigaishakti · VAI-FA3 series
- Channels
- 8 channels to 32 channels (see variants)
- Input types
- Modbus RTU
- Resolution
- 24-bit
- Sampling rate
- 100 ms min
- Memory
- 32 GB
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 5 nos
Freight forwarding & customs clearanceMaurya5 variants
SampleServiceFreight forwarding & customs clearance Maurya · MAU-FC6 series
- Shipment size
- 5 CBM to Project cargo (see variants)
- Mode
- Sea LCL
- Customs services
- Duty planning and classification
- Incoterm
- DAP
- Permits
- Solar and EPCG benefits
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
E-waste managementKakatiya6 variants
SampleServiceE-waste management Kakatiya · KAK-307 series
- E-waste quantity
- 100 kg to 100 tonnes (see variants)
- Service
- ITAD
- Categories
- Lighting
- Authorisation
- CPCB registered recycler
- Data destruction
- Shredding
Lead time Certificate in 2-4 weeks · Warranty Certificate of recycling · MOQ 1 tonne
Line monitoring (DLR, fault passage indicators)Suryamax6 variants
SampleLine monitoring (DLR, fault passage indicators) Suryamax · SUR-373 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Device
- DLR sensor
- Measured
- Current
- Accuracy
- +/- 1 deg C
- Communication
- GSM / 4G
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Lender's engineer & TEV studiesMagadh5 variants
SampleServiceLender's engineer & TEV studies Magadh · MAG-A23 series
- Project cost
- INR 25 crore to INR 500 crore (see variants)
- Phase
- Construction monitoring
- Scope
- Technical, cost and schedule review
- Reporting
- TEV report
- Site visits
- Quarterly
Lead time Appointment in 1 week · Warranty Professional indemnity · MOQ 1 report
First aid & emergency showersIndraprasthasudarshan6 variants
SampleFirst aid & emergency showers Indraprasthasudarshan · IND-425 series
- Type / size
- Kit for 10 persons to Shower with tank and heater (see variants)
- Cabinet material
- ABS plastic
- Contents
- Dressings, burn gel, antiseptics, splints
- Eye wash flow
- 11.4 L/min for 15 min
- Shower flow
- 75 L/min
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos
EPC / turnkey contractingMahabaleshwarflux5 variants
SampleServiceEPC / turnkey contracting Mahabaleshwarflux · MAH-955 series
- Project capacity
- 1 MWp to 50 MWp (see variants)
- Scope
- Turnkey including 33 kV line and bay
- Module technology
- Mono PERC DCR
- Inverter
- Central inverter
- Performance guarantee
- PR 80% for first year
Lead time 3-6 months to commissioning · Warranty Inverter 5-10 years · MOQ 1 MWp
Utility billing & customer systemsAmaravati4 variants
SampleUtility billing & customer systems Amaravati · AMA-581 series
- Consumer base
- Up to 10,000 to Up to 1 million (see variants)
- Deployment
- On-premise
- Billing types
- Postpaid, prepaid, net metering
- Tariff engine
- Slab, TOD, fixed + variable
- Meter integration
- MDM / AMI via IS 15959
Lead time 20-30 weeks · Warranty 36 months support · MOQ 10 licence
PCBs & electronic assembliesKrishna4 variants
SamplePCBs & electronic assemblies Krishna · KRI-852 series
- Layers / type
- Double-sided to 8-layer (see variants)
- Base material
- FR-4 Tg 170
- Copper weight
- 2 oz
- Board thickness
- 2.0 mm
- Surface finish
- HASL lead-free
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Mobile substationsEllora3 variants
Ellora · ELL-031 series
- Transformer rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 33 kV
- Chassis
- Skid
- Primary switchgear
- AIS disconnector and breaker
Lead time 30-40 weeks · Warranty 24 months · MOQ 1 nos
Ex junction boxes & cable glandsChola5 variants
SampleEx junction boxes & cable glands Chola · CHO-113 series
- Size
- Gland M25 to JB 300x300 mm (see variants)
- Protection type
- Ex tb IIIC
- Enclosure material
- GRP
- Gland material
- Nickel-plated brass
- Cable type
- Unarmoured
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Covered conductors & LT spacersKonkansudarshan4 variants
SampleCovered conductors & LT spacers Konkansudarshan · KON-773 series
- Conductor size
- 50 mm2 to 120 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- AAAC
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
PLC & DCSTaxilagaruda3 variants
Taxilagaruda · TAX-A37 series
- I/O points
- 128 I/O to 512 I/O (see variants)
- CPU memory
- 512 KB
- Scan time
- < 1 ms per 1k instructions
- Redundancy
- Hot standby CPU and network
- Programming
- IEC 61131-3 (LD, FBD, ST)
Lead time 8-12 weeks · Warranty 24 months from supply · MOQ 2 nos
SDH / MPLS & fibre terminal equipmentHoysalavajra5 variants
SampleSDH / MPLS & fibre terminal equipment Hoysalavajra · HOY-B16 series
- Capacity
- STM-4 to 100G DWDM (see variants)
- Interface
- STM-1 optical
- Optical reach
- 80 km
- Protection
- SNCP
- Wavelength
- 1310 nm
Lead time 8-10 weeks · Warranty 36 months from supply · MOQ 1 nos
Motor & transformer rewindingSutlej5 variants
SampleServiceMotor & transformer rewinding Sutlej · SUT-D29 series
- Machine rating
- Up to 30 kW to 1 MVA transformer (see variants)
- Equipment
- Alternator
- Conductor
- Aluminium
- Insulation class
- Class F
- Process
- Dip and bake
Lead time 2-4 weeks · Warranty 6 months on repair · MOQ 1 nos
Audit & accountingPhasetron4 variants
SampleServiceAudit & accounting Phasetron · PHA-A57 series
- Annual turnover
- INR 10 crore to INR 100 crore (see variants)
- Service
- Accounting outsourcing
- Accounting standard
- AS
- Audit team
- Partner, manager, 4 staff
- Reports
- Management letter
Lead time Audit 30-60 days · Warranty Clarifications for regulators · MOQ 1 month
Module materials (glass, EVA/POE, backsheet, frames, ribbon)Pallavaakshay6 variants
SampleModule materials (glass, EVA/POE, backsheet, frames, ribbon) Pallavaakshay · PAL-875 series
- Material
- POE film to Aluminium frame (see variants)
- Thickness
- 0.45 mm
- Light transmittance
- 93.5%
- Gel content
- > 75%
- Volume resistivity
- > 1e15 ohm-cm
Lead time 2-3 weeks · Warranty 12 months shelf life · MOQ 1 kg
Conveyors & material handlingPallava3 variants
SampleConveyors & material handling Pallava · PAL-363 series
- Belt width
- 650 mm to 1000 mm (see variants)
- Belt type
- EP 200 rubber
- Capacity
- 250 TPH
- Belt speed
- 1.6 m/s
- Idler pitch
- 1.2 m
Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 1 m
String combiner boxes & DCDBHoysaladhruv4 variants
SampleString combiner boxes & DCDB Hoysaladhruv · HOY-C74 series
- Inputs
- 2 in 1 out to 8 in 1 out (see variants)
- Rated voltage
- 1000 V DC
- Output current
- 400 A
- Enclosure material
- SS 304
- Ingress protection
- IP65
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Cable transit & sealing systemsDoabasamarth6 variants
SampleCable transit & sealing systems Doabasamarth · DOA-D44 series
- Opening
- Round 50 mm to Frame 300 x 150 mm (see variants)
- Type
- Round sleeve
- Fire rating
- EI 240
- Seal material
- EPDM rubber
- Frame material
- Stainless steel
Lead time 2-3 weeks · Warranty 10 years from supply · MOQ 10 nos