Fibre optic (OPGW, ADSS)Konark3 variants
SampleFibre optic (OPGW, ADSS) Konark · KON-322 series
- Fibre count
- 12F to 36F (see variants)
- Cable type
- OPGW
- Fibre type
- G.652D single-mode
- Structure
- Stainless steel loose tube
- Short-circuit rating
- 90 kA2s
Lead time 6-8 weeks · Warranty As per contract · MOQ 10 km
Compact secondary substationsKonark6 variants
SampleCompact secondary substations Konark · KON-329 series
- Transformer rating
- 100 kVA to 1600 kVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.69 kV
- HV equipment
- Ring main unit
- Transformer type
- Cast resin dry
Lead time 10-14 weeks · Warranty 18 months · MOQ 10 nos
Feasibility studies & DPRRavipushpak4 variants
SampleServiceFeasibility studies & DPR Ravipushpak · RAV-231 series
- Project capacity
- 10 MW to 500 MW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- WAsP wind energy assessment
- Financial model
- Sensitivity and tariff analysis
- Grid assessment
- Nearest substation capacity check
Lead time 3-12 weeks · Warranty Clarification support for 6 months · MOQ 1 report
Digital twins & analyticsCoorgjyoti5 variants
SampleDigital twins & analytics Coorgjyoti · COO-004 series
- Plant size
- Up to 50 MW to Portfolio > 1 GW (see variants)
- Deployment
- Hybrid edge
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 3-4 weeks · Warranty Support as per agreement · MOQ 1 licence
Torque wrenches & bolt tensioningBundel4 variants
SampleTorque wrenches & bolt tensioning Bundel · BUN-9F5 series
- Torque range
- 40-200 Nm to 1000-10000 Nm (see variants)
- Type
- Multiplier
- Drive size
- 3/8 inch
- Accuracy
- +/-4%
- Length
- 1200 mm
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 1 set
Wind turbine O&MTrishulmark4 variants
SampleServiceWind turbine O&M Trishulmark · TRI-268 series
- Fleet size
- 5 turbines to 40 turbines (see variants)
- Scope
- Availability based O&M
- Turbine class
- 3 MW and above
- Availability guarantee
- 95% machine availability
- Technician team
- Local crew plus rope-access team
Lead time Takeover in 4-6 weeks · Warranty Work warranty 6 months · MOQ 1 nos
Copper rods, strips & busbarsMahanadiohm3 variants
SampleCopper rods, strips & busbars Mahanadiohm · MAH-F74 series
- Rod / busbar size
- 25 x 5 mm to 75 x 10 mm (see variants)
- Grade
- OFE copper
- Conductivity
- Min 98% IACS
- Temper
- Hard
- Form
- Strip
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 5 kg
Water testing laboratoriesArcmax4 variants
SampleServiceWater testing laboratories Arcmax · ARC-302 series
- Parameter panel
- Physical and chemical 25 to Effluent CPCB panel (see variants)
- Sample type
- Cooling water
- Reporting
- Hard copy with seal
- Accreditation
- NABL accredited
- Turnaround
- 7 days
Lead time 3-5 days · Warranty Report valid for the sampled lot · MOQ 1 job
Tower erection gin poles & derricksVidyutsys5 variants
SampleTower erection gin poles & derricks Vidyutsys · VID-486 series
- Safe working load
- 500 kg to 5 t (see variants)
- Pole type
- Tubular telescopic
- Pole length
- 9 m
- Material
- Aluminium alloy
- Winch
- Hand
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 10 set
Corrosion monitoringNarmada5 variants
SampleCorrosion monitoring Narmada · NAR-2B8 series
- Channel count
- 1 channel to 16 channel (see variants)
- Measurement
- Pipe-to-soil potential
- Range
- 0-20 mm/year
- Accuracy
- +/-2%
- Logging interval
- 15 min
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 set
ACB, MCCB & MCBCoromandelampere3 variants
Coromandelampere · COR-2A6 series
- Rating
- 1250 A to 4000 A (see variants)
- Breaker type
- ACB
- Poles
- 1P
- Rated voltage
- 690 V AC
- Breaking capacity (Icu)
- 25 kA
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 5 nos
Battery-swapping stationsAjantasamarth6 variants
SampleBattery-swapping stations Ajantasamarth · AJA-466 series
- Battery slots
- 4 slots to 40 slots (see variants)
- Vehicle type
- Bus
- Battery pack
- 72 V 40 Ah
- Charger per slot
- 600 W
- Swap time
- < 2 min
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Training & certification (electrical licence, work at height)Krishna5 variants
SampleServiceTraining & certification (electrical licence, work at height) Krishna · KRI-302 series
- Course duration
- 3 days to 3 months (see variants)
- Programme
- Substation operator
- Mode
- On-site
- Batch size
- 20 participants
- Certification
- Skill council NSQF aligned
Lead time Next batch in 2-4 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Project management (PMC) & owner's engineerMahabaleshwarflux3 variants
SampleServiceProject management (PMC) & owner's engineer Mahabaleshwarflux · MAH-494 series
- Project size
- 25 MW to 100 MW (see variants)
- Scope
- Full PMC with contract management
- Team on site
- 1 project manager plus 1 engineer
- Schedule control
- MS Project weekly
- Reporting
- Weekly progress report
Lead time Engagement for 6-24 months · Warranty Professional indemnity cover · MOQ 1 month
Condition monitoring systems (CMS)Trishulmark5 variants
SampleCondition monitoring systems (CMS) Trishulmark · TRI-522 series
- Channels
- 4 channels to 24 channels (see variants)
- Sensor type
- Inductive oil debris
- Sampling rate
- 25.6 kHz
- Frequency range
- 0.1 Hz-10 kHz
- Data storage
- Local 128 GB
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 set
Training & certification (electrical licence, work at height)Gupta3 variants
SampleServiceTraining & certification (electrical licence, work at height) Gupta · GUP-302 series
- Course duration
- 10 days to 3 months (see variants)
- Programme
- Substation operator
- Mode
- Hybrid
- Batch size
- 30 participants
- Certification
- Training completion certificate
Lead time On-site within 2 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Flue-gas desulphurisation (FGD)Saurashtra6 variants
SampleFlue-gas desulphurisation (FGD) Saurashtra · SAU-2E6 series
- Boiler size
- 10 MW to 350 MW (see variants)
- Technology
- Semi-dry
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Rubber lined carbon steel
Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 10 set
Solar module recyclingAkshaymax3 variants
SampleServiceSolar module recycling Akshaymax · AKS-148 series
- Quantity
- 100 tonnes to 1000 tonnes (see variants)
- Process
- Mechanical separation
- Recovery rate
- 90%+
- Materials recovered
- Silicon, silver
- Authorisation
- Registered recycler
Lead time Processing 2-8 weeks · Warranty Certificate of destruction · MOQ 1 tonne
Station batteries (Ni-Cd, VRLA)Hoysala3 variants
SampleStation batteries (Ni-Cd, VRLA) Hoysala · HOY-ED8 series
- Capacity
- 100 Ah to 300 Ah (see variants)
- Chemistry
- Ni-Cd
- Nominal cell voltage
- 1.2 V
- Number of cells
- 108
- Bank voltage
- 110 V
Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos
Motor & transformer rewindingMewar6 variants
SampleServiceMotor & transformer rewinding Mewar · MEW-D27 series
- Machine rating
- Up to 5 kW to 1 MVA transformer (see variants)
- Equipment
- HT motor
- Conductor
- Copper
- Insulation class
- Class F
- Process
- Dip and bake
Lead time 2-4 weeks · Warranty 6 months on repair · MOQ 1 nos
Scheduling & forecasting (QCA)Pushpakmax4 variants
SampleServiceScheduling & forecasting (QCA) Pushpakmax · PUS-D84 series
- Aggregated capacity
- 100 MW to 1000 MW (see variants)
- Service
- Forecasting only
- Forecast horizon
- Day-ahead
- Accuracy
- Error under 8%
- Data input
- Satellite nowcasting
Lead time Onboarding in 2-3 weeks · Warranty Forecast accuracy guarantee with fee linkage · MOQ 1 MW
Hybrid & dead-tank switchgearMarwarsudarshan4 variants
SampleHybrid & dead-tank switchgear Marwarsudarshan · MAR-FD2 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Hybrid
- Rated current
- 3150 A
- Breaking current
- 40 kA
- Gas
- SF6-free
Lead time 16-24 weeks · Warranty 24 months · MOQ 1 nos
Rack PDUs & buswayVindhyaneel6 variants
Vindhyaneel · VIN-2B5 series
- Current
- 16 A to 400 A (see variants)
- Type
- Switched
- Phase
- 3-phase
- Outlets
- 12 x C13
- Voltage
- 230 V
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 10 nos
Tunnel, port & stadium lightingVijaya5 variants
SampleTunnel, port & stadium lighting Vijaya · VIJ-4D7 series
- Wattage
- 100 W to 400 W (see variants)
- Luminous efficacy
- 150 lm/W
- Beam optics
- Symmetric 40 deg
- Colour temperature
- 4000 K
- CRI
- Above 70
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 5 nos