Solar module recyclingPrithvimark5 variants
SampleServiceSolar module recycling Prithvimark · PRI-9D8 series
- Quantity
- 5 tonnes to 500 tonnes (see variants)
- Process
- Mechanical separation
- Recovery rate
- 90%+
- Materials recovered
- Silicon, silver
- Authorisation
- Registered recycler
Lead time Pick-up in 7-14 days · Warranty As per authorisation · MOQ 1 tonne
Pole hardware, stays & cross-armsVindhya4 variants
SamplePole hardware, stays & cross-arms Vindhya · VIN-EC1 series
- Size
- 100x75 mm to 200x100 mm (see variants)
- Hardware item
- Pole clamp
- Material
- High tensile steel
- Section
- Flat
- Length
- 3.0 m
Lead time 2-3 weeks · Warranty As per discom specification · MOQ 1 nos
Gas-based suppressionAjanta5 variants
SampleGas-based suppression Ajanta · AJA-349 series
- Protected volume
- Up to 50 m³ to 1000-3000 m³ (see variants)
- Agent
- CO2
- Cylinder pressure
- 300 bar
- Discharge time
- 60 seconds (inert gas)
- Detection
- Cross-zoned smoke detectors
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 2 set
Substation constructionUrjatek3 variants
SampleServiceSubstation construction Urjatek · URJ-DC2 series
- Voltage class
- 33 kV to 132 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Civil and structural
- Transformers
- Up to 160 MVA
- Earthing
- Copper-bonded rods
Lead time Engineering in 4-6 weeks · Warranty Equipment as per OEM · MOQ 1 bay
Casting & forgingTeesta6 variants
SampleServiceCasting & forging Teesta · TEE-3F5 series
- Casting weight
- Up to 1 kg to Over 500 kg (see variants)
- Material
- FG 200
- Process
- Closed die forging
- Pattern
- Customer supplied
- Machining
- Rough
Lead time 3-4 weeks · Warranty Replacement of defective castings · MOQ 1 kg
Ester oils (natural & synthetic)Hoysalaanant4 variants
SampleEster oils (natural & synthetic) Hoysalaanant · HOY-B58 series
- Pack size
- 210 litre drum to Bulk 20000 litre (see variants)
- Type
- Natural ester
- Flash point
- Min 250 deg C
- Fire point
- Min 300 deg C
- Viscosity at 40 deg C
- Max 35 cSt
Lead time 1-2 weeks · Warranty 12 months in sealed container · MOQ 1 litre
Lattice towers & monopolesPrakashtek3 variants
SampleLattice towers & monopoles Prakashtek · PRA-CF7 series
- Voltage class
- 33 kV to 132 kV (see variants)
- Type
- Tubular
- Circuit
- Double
- Tower type
- C 15-deg angle
- Height
- 18 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 1 MT
Blowers, fans & compressorsVayumark6 variants
SampleBlowers, fans & compressors Vayumark · VAY-B72 series
- Power rating
- 2.2 kW to 250 kW (see variants)
- Type
- Roots
- Flow
- 500000 m3/h
- Pressure
- 600 mmWC
- Impeller
- Radial
Lead time 8-12 weeks · Warranty 18 months · MOQ 1 nos
Pumped-storage pump-turbines & motor-generatorsAgnicore6 variants
SamplePumped-storage pump-turbines & motor-generators Agnicore · AGN-DB5 series
- Unit rating
- 50 MW to 400 MW (see variants)
- Machine type
- Pump-turbine
- Head range
- 150-300 m
- Rated speed
- 500 rpm
- Mode
- Generating / pumping
Lead time 18-24 months · Warranty 24 months · MOQ 1 nos
GIS & network planningSatavahana4 variants
SampleGIS & network planning Satavahana · SAT-798 series
- Users / scale
- 5 users to Enterprise 500 users (see variants)
- Deployment
- Desktop
- Data formats
- DXF
- Network analysis
- Tracing, connectivity, load flow
- Basemaps
- Satellite
Lead time 8-12 weeks · Warranty 12 months support · MOQ 1 licence
Ring main units (RMU)Saurashtra4 variants
SampleRing main units (RMU) Saurashtra · SAU-997 series
- Configuration
- 2-way (LBS+LBS) to 4-way (2LBS+LBS+VCB) (see variants)
- Rated voltage
- 12 kV
- Rated current - ring
- 400 A
- Transformer feeder
- 200 A fuse-switch
- Short-circuit rating
- 25 kA/3 s
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 2 nos
RO & DM plantsSatavahanaflux5 variants
Satavahanaflux · SAT-438 series
- Permeate capacity
- 3 cu m/h to 50 cu m/h (see variants)
- Recovery
- 60%
- Membrane
- 4 inch TFC
- Feed TDS
- Up to 2000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 8-10 weeks · Warranty 6 months on membranes · MOQ 1 set
STATCOM & SVGSahyadriojas3 variants
Sahyadriojas · SAH-B28 series
- Rating
- 3 MVAr to 25 MVAr (see variants)
- Voltage
- 690 V
- Topology
- 3-level IGBT
- Response time
- < 5 ms
- Compensation
- Capacitive and inductive, bidirectional
Lead time 8-12 weeks · Warranty 36 months with AMC · MOQ 1 nos
Industrial & hazardous-area lightingIndraprastha5 variants
SampleIndustrial & hazardous-area lighting Indraprastha · IND-008 series
- Wattage
- 60 W to 240 W (see variants)
- Protection concept
- Ex e increased safety
- Gas group
- IIA
- Zone
- Zone 21
- Temperature class
- T4
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 2 nos
GI & copper stripsMalabar4 variants
Malabar · MAL-0F2 series
- Size
- 50x6 mm GI to 50x6 mm Cu (see variants)
- Material
- Mild steel galvanised
- Galvanising
- Min 85 µm
- Zinc coating
- IS 2629
- Current rating
- Fault current 1 s rated
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 m
Piles & foundationsWayanad5 variants
SamplePiles & foundations Wayanad · WAY-8D5 series
- Pile diameter
- 600 mm to 1200 mm (see variants)
- Pile type
- Micro pile
- Concrete grade
- M25
- Pile length
- 6 m
- Reinforcement
- Fe 550D
Lead time 2-3 weeks · Warranty Design life 50 years · MOQ 5 nos
Concrete batching & transit mixersFluxmax5 variants
SampleFor rentConcrete batching & transit mixers Fluxmax · FLU-045 series
- Output capacity
- Transit mixer 6 cu m to Boom pump 60 cu m/h (see variants)
- Drum capacity
- 6 cu m
- Type
- Boom pump
- Operator
- Not included
- Fuel
- Included
Lead time 2-3 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Installation & erectionDeepmark6 variants
SampleServiceInstallation & erection Deepmark · DEE-C47 series
- Installation scope
- 1 MW to 100 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 60 technicians plus supervisors
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
AC chargersHoysala4 variants
Hoysala · HOY-D62 series
- Rated power
- 3.3 kW to 22 kW (see variants)
- Input voltage
- 415 V 3-ph
- Connector
- Bharat AC-001 socket
- Cable length
- 5 m
- Authentication
- Plug and charge
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 nos
Fabrication & galvanisingGodavari4 variants
SampleServiceFabrication & galvanising Godavari · GOD-4C4 series
- Job complexity
- Cutting only to Medium fabrication (see variants)
- Material supplied by
- Fabricator
- Process
- Laser cutting
- Thickness range
- Up to 50 mm
- Tolerance
- +/-1 mm
Lead time 1-2 weeks · Warranty Rework of defects at no cost · MOQ 1 kg
Cable pulling winches & rollersTeesta5 variants
SampleCable pulling winches & rollers Teesta · TEE-397 series
- Pull capacity
- 1 t to 10 t (see variants)
- Drive
- Hand ratchet
- Line speed
- 8 m/min
- Wire rope length
- 50 m
- Motor power
- 3.7 kW
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 1 nos
Carbon credits & offsetsMewarkavach4 variants
SampleServiceCarbon credits & offsets Mewarkavach · MEW-F73 series
- Annual credits
- 10,000 tCO2e to 500,000 tCO2e (see variants)
- Programme
- Voluntary market
- Project type
- Waste heat
- Methodology
- Baseline development
- MRV
- Annual report
Lead time Registration 6-18 months · Warranty As per contract · MOQ 1 job
Hot-dip galvanisingSutlej6 variants
SampleServiceHot-dip galvanising Sutlej · SUT-284 series
- Minimum zinc coating
- 70 micron to 900 g/sq m (see variants)
- Item type
- Structure assembly
- Max piece length
- 6 m
- Bath size
- 14 x 1.8 x 3.5 m
- Zinc purity
- 99.95%
Lead time 3-5 days · Warranty Free re-galvanising for rejected pieces · MOQ 1 MT
Noise controlAmaravatitej3 variants
Amaravatitej · AMA-CA4 series
- Insertion loss
- 20 dB to 30 dB (see variants)
- Equipment served
- Compressor
- Panel construction
- Double skin MS
- Infill
- PU foam
- Sheet thickness
- 1.6 mm
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 nos