Conduits & HDPE ductsAravali4 variants
SampleConduits & HDPE ducts Aravali · ARA-322 series
- Outside diameter
- 40 mm to 90 mm (see variants)
- Type
- Double wall corrugated
- Material
- HDPE PE100
- Pressure class
- PN 10
- Colour
- Orange
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 m
CCTV & video analyticsTeesta3 variants
SampleCCTV & video analytics Teesta · TEE-7D1 series
- Item
- IP bullet 4 MP to PTZ 4 MP 30x (see variants)
- Resolution
- 2 MP
- Lens
- Motorised zoom
- IR range
- 100 m
- Video compression
- H.265+
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 5 nos
Aspirating smoke detectionThanjavurkiran4 variants
SampleAspirating smoke detection Thanjavurkiran · THA-7D8 series
- Coverage
- Up to 500 m² / 2 pipes to Up to 4000 m² (see variants)
- Sensitivity
- Class A (very high)
- Detection
- Laser light scattering
- Alarm levels
- Alert, Action, Fire 1, Fire 2
- Pipe network
- Up to 100 m
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Tariff & regulatory advisorySatpura6 variants
SampleServiceTariff & regulatory advisory Satpura · SAT-F98 series
- Matter complexity
- Advisory note to Appeal before APTEL (see variants)
- Forum
- State Electricity Regulatory Commission
- Deliverable
- Opinion note
- Representation
- Drafting only
- Data support
- Benchmark analysis
Lead time Initial note in 1 week · Warranty Free redrafting if Commission raises defects · MOQ 1 case
Gas-based suppressionNandimark5 variants
SampleGas-based suppression Nandimark · NAN-612 series
- Protected volume
- Up to 50 m³ to 1000-3000 m³ (see variants)
- Agent
- IG-541
- Cylinder pressure
- 42 bar
- Discharge time
- 60 seconds (inert gas)
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 24 months from supply · MOQ 5 set
Fabrication & galvanisingAravali6 variants
SampleServiceFabrication & galvanising Aravali · ARA-409 series
- Job complexity
- Cutting only to Fabrication and galvanising (see variants)
- Material supplied by
- Fabricator
- Process
- Welding
- Thickness range
- Up to 6 mm
- Tolerance
- +/-1 mm
Lead time 3-4 weeks · Warranty Rework of defects at no cost · MOQ 1 kg
EIA, ESG & environmental studiesKrishnavayu6 variants
SampleServiceEIA, ESG & environmental studies Krishnavayu · KRI-FC3 series
- Project scale
- Under 25 MW to 1 GW (see variants)
- Study
- Comprehensive EIA
- Baseline season
- Three seasons
- Deliverables
- Draft EIA, EMP, public hearing support
- Lab testing
- NABL accredited lab
Lead time 8-12 weeks, longer with seasonal baseline · Warranty Query response with regulators at no cost · MOQ 1 report
Substation & line O&MMagadh5 variants
SampleServiceSubstation & line O&M Magadh · MAG-8E7 series
- Voltage level
- 11 kV to 220 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- General shift plus on-call
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Hydrogen dispensers & refuelling stationsMarwar3 variants
SampleHydrogen dispensers & refuelling stations Marwar · MAR-D96 series
- Daily capacity
- 500 kg/day to 2000 kg/day (see variants)
- Dispensing pressure
- 350 and 700 bar
- Fill protocol
- SAE J2601
- Pre-cooling
- -20 deg C
- Nozzle
- H70
Lead time 30-40 weeks · Warranty 24 months · MOQ 2 nos
FastenersThanjavurarc5 variants
Thanjavurarc · THA-262 series
- Bolt size
- M8 to M20 (see variants)
- Grade
- 4.6
- Material
- SS 304
- Finish
- Plain
- Length
- 25 mm
Lead time 1-2 weeks · Warranty Mechanical test certificate · MOQ 10 kg
Drone & AI inspectionTaxilaarc3 variants
SampleServiceDrone & AI inspection Taxilaarc · TAX-A12 series
- Scope
- Up to 100 MWp to Above 250 MWp (see variants)
- Sensor
- RGB + thermal
- Resolution
- 20 MP RGB
- Analytics
- AI defect classification
- Deliverables
- Defect report with GPS tags
Lead time 1 week · Warranty Report accuracy as per contract · MOQ 1 MWp
Cable pulling winches & rollersPataliputra3 variants
SampleCable pulling winches & rollers Pataliputra · PAT-534 series
- Pull capacity
- 3 t to 10 t (see variants)
- Drive
- Electric
- Line speed
- 8 m/min
- Wire rope length
- 100 m
- Motor power
- 3.7 kW
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 1 nos
HVAC & ventilationTeslaline6 variants
Teslaline · TES-2F2 series
- Capacity
- 1.5 TR to 10 TR (see variants)
- Type
- Floor standing
- Refrigerant
- R32
- Power supply
- 415 V 3 phase
- Compressor
- Inverter rotary
Lead time 3-4 weeks · Warranty 12 months comprehensive · MOQ 5 nos
HMI & industrial PCsTaxilagaruda6 variants
SampleHMI & industrial PCs Taxilagaruda · TAX-E29 series
- Screen size
- 7 inch to 21.5 inch (see variants)
- Display type
- TFT LCD, capacitive touch
- Resolution
- 800x480
- CPU
- Intel Core i5
- RAM
- 16 GB
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 2 nos
Ester oils (natural & synthetic)Indraprasthashikhar4 variants
SampleEster oils (natural & synthetic) Indraprasthashikhar · IND-D57 series
- Pack size
- 210 litre drum to Bulk 20000 litre (see variants)
- Type
- Natural ester
- Flash point
- Min 270 deg C
- Fire point
- Min 300 deg C
- Viscosity at 40 deg C
- Max 35 cSt
Lead time 3-4 weeks · Warranty Test certificate per batch · MOQ 10 litre
DG & equipment rentalSabarmativayu6 variants
SampleFor rentDG & equipment rental Sabarmativayu · SAB-9B3 series
- DG capacity
- 15 kVA to 500 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- CPCB IV+ canopy
- Operator
- Included
Lead time 2-3 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Surge arresters (station class)Malabarojas4 variants
SampleSurge arresters (station class) Malabarojas · MAL-8C3 series
- System voltage
- 36 kV to 245 kV (see variants)
- Rated voltage
- 9 kV
- Nominal discharge current
- 20 kA
- Line discharge class
- Class 4
- Housing
- Porcelain
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Thermal camerasBrahmaputra5 variants
Brahmaputra · BRA-D61 series
- Detector resolution
- 80 x 60 to 384 x 288 (see variants)
- Temperature range
- -20 to 350 deg C
- Thermal sensitivity
- Below 0.1 deg C
- Accuracy
- +/-2%
- Focus
- Autofocus
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos
Switchgear & breaker sparesNarmada6 variants
SampleSwitchgear & breaker spares Narmada · NAR-ED2 series
- Rated voltage
- 12 kV to 145 kV (see variants)
- Component
- Contact
- Rated current
- 630 A
- Short circuit rating
- 40 kA
- Mechanical life
- 30000 operations
Lead time 4-8 weeks · Warranty 18 months from supply · MOQ 1 nos
Supply-chain / invoice financeDoabaampere3 variants
SampleServiceSupply-chain / invoice finance Doabaampere · DOA-AD1 series
- Programme limit
- INR 10 crore to INR 100 crore (see variants)
- Structure
- Reverse factoring
- Advance rate
- 90% of invoice
- Tenor
- Up to 180 days
- Recourse
- Without recourse
Lead time Funding in 24-72 hours after approval · Warranty As per programme terms · MOQ 1 job
Sensors & transducersTaxilagaruda6 variants
SampleSensors & transducers Taxilagaruda · TAX-662 series
- Sensor type
- Proximity 8 mm to PT100 4-wire (see variants)
- Output
- 4-20 mA
- Accuracy
- ±1%
- Supply voltage
- 24 VDC
- Response time
- < 100 ms
Lead time 1-2 weeks · Warranty 18 months from supply · MOQ 1 nos
RO & DM plantsAwadhtej6 variants
Awadhtej · AWA-753 series
- Permeate capacity
- 1 cu m/h to 50 cu m/h (see variants)
- Recovery
- 75%
- Membrane
- 8 inch TFC
- Feed TDS
- Up to 5000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 8-10 weeks · Warranty 12 months from commissioning · MOQ 5 set
Voltage stabilisersBeas4 variants
SampleVoltage stabilisers Beas · BEA-599 series
- Rating
- 100 kVA to 1000 kVA (see variants)
- Input range
- 160-270 V (1-ph)
- Output voltage
- 415 V ±1%
- Phases
- 1-ph
- Correction speed
- 35 V/s (servo)
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 nos
Shunt & series reactorsKaverianant4 variants
SampleShunt & series reactors Kaverianant · KAV-756 series
- Rating
- 50 MVAr to 200 MVAr (see variants)
- System voltage
- 400 kV
- Type
- Series
- Construction
- Oil-immersed gapped core
- Phases
- Three
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 1 nos