Building wiresVidyuttek4 variants
Vidyuttek · VID-2E7 series
- Size
- 1.0 sq mm to 4 sq mm (see variants)
- Coil length
- 90 m
- Conductor
- Annealed copper (class 2)
- Insulation
- LSZH
- Voltage grade
- 650/1100 V
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 10 coil
Solar productive-use appliances (cold rooms, mills, dryers)Bundelsamarth3 variants
SampleSolar productive-use appliances (cold rooms, mills, dryers) Bundelsamarth · BUN-5C7 series
- Capacity
- 5 MT to 20 MT (see variants)
- Appliance type
- Flour mill
- Solar array
- 10 kWp
- Storage temperature
- -18 C
- Insulation
- PUF 80 mm
Lead time 6-10 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Substation & line O&MKaverispark5 variants
SampleServiceSubstation & line O&M Kaverispark · KAV-059 series
- Voltage level
- 33 kV to 400 kV (see variants)
- Scope
- Maintenance only
- Shift pattern
- General shift plus on-call
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Mobilisation in 2-3 weeks · Warranty Service credits for avoidable outages · MOQ 1 month
Valves, pipes & fittingsWayanad3 variants
SampleValves, pipes & fittings Wayanad · WAY-9F3 series
- Nominal bore
- 80 NB to 150 NB (see variants)
- Body material
- Cast steel WCB
- Pressure class
- PN 10
- End connection
- Flanged
- Operation
- Hand wheel
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 1 nos
DCIM softwareMysorearc3 variants
SampleServiceDCIM software Mysorearc · MYS-3F4 series
- Scope
- Up to 50 racks to Up to 250 racks (see variants)
- Licence type
- 3-year subscription
- Deployment
- On-premises
- Monitoring points
- Up to 500
- Protocols
- IPMI
Lead time 1-2 weeks · Warranty As per contract · MOQ 1 licence
Casting & forgingAravali6 variants
SampleServiceCasting & forging Aravali · ARA-3F4 series
- Casting weight
- Up to 1 kg to Over 500 kg (see variants)
- Material
- SG 500/7
- Process
- Investment
- Pattern
- Customer supplied
- Machining
- Rough
Lead time 3-4 weeks · Warranty 12 months against casting defects · MOQ 1 kg
Refurbished & used equipmentMahanadikiran5 variants
SampleUsedRefurbished & used equipment Mahanadikiran · MAH-7D6 series
Like new · made 2022
- Equipment rating
- 250 kVA to 10 MVA (see variants)
- Condition
- Overhauled
- Age
- Less than 5 years
- Test report
- Full routine test
- Voltage class
- 415 V
Lead time 1-2 weeks · Warranty 12 months for overhauled units · MOQ 1 nos
CRGO & CRNO electrical steelParammax3 variants
SampleCRGO & CRNO electrical steel Parammax · PAR-255 series
- Grade / thickness
- M5 0.30 mm to Laser scribed 0.23 mm (see variants)
- Core loss
- 0.90 W/kg at 1.7 T
- Form
- Slit coil
- Coil width
- 750 mm
- Coil weight
- 5 MT
Lead time 2-4 weeks · Warranty Replacement if out of spec · MOQ 2 kg
ESP & bag filtersParamline3 variants
Paramline · PAR-592 series
- Gas flow rate
- 50000 Am3/h to 250000 Am3/h (see variants)
- Outlet emission
- Below 30 mg/Nm3
- Inlet temperature
- Up to 250 deg C
- Filter media
- PPS felt
- Cleaning
- Pulse jet
Lead time 20-28 weeks · Warranty 12 months from commissioning · MOQ 10 set
AlternatorsNarmada3 variants
Narmada · NAR-805 series
- Rating
- 1000 kVA to 5000 kVA (see variants)
- Voltage
- 11 kV
- Excitation
- PMG
- Poles
- 4
- Insulation class
- F
Lead time 2-3 weeks · Warranty 12 months · MOQ 10 nos
Feed-water pumps & heatersRavi4 variants
SampleFeed-water pumps & heaters Ravi · RAV-5A7 series
- Flow capacity
- 50 m3/h to 500 m3/h (see variants)
- Equipment
- Deaerator
- Discharge pressure
- 110 bar
- Stages
- 6
- Casing
- Segmental ring-section
Lead time 20-30 weeks · Warranty 12 months · MOQ 5 nos
Reciprocating gas & dual-fuel enginesBundel3 variants
SampleReciprocating gas & dual-fuel engines Bundel · BUN-092 series
- Electrical output
- 500 kW to 2 MW (see variants)
- Fuel
- Natural gas
- Engine speed
- 1500 rpm
- Electrical efficiency
- 44%
- Cylinders
- V16
Lead time 30-40 weeks · Warranty 12 months · MOQ 1 nos
Static transfer switchesVindhya4 variants
SampleStatic transfer switches Vindhya · VIN-C25 series
- Rating
- 250 A to 1600 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 415 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Break-before-make
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Data loggersAjanta4 variants
Ajanta · AJA-CF9 series
- Channels
- 4 channels to 32 channels (see variants)
- Input types
- 4-20 mA
- Resolution
- 24-bit
- Sampling rate
- 1 s min
- Memory
- 32 GB
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 5 nos
SF6 circuit breakersMalabarojas5 variants
SampleSF6 circuit breakers Malabarojas · MAL-CD6 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 2000 A
- Breaking current
- 31.5 kA
- Operating mechanism
- Hydraulic spring
- Operation
- 3-pole
Lead time 12-16 weeks · Warranty 30 months from supply · MOQ 1 nos
Towers & foundationsShikharmax3 variants
SampleTowers & foundations Shikharmax · SHI-912 series
- Hub height
- 110 m to 140 m (see variants)
- Tower type
- Lattice
- Section count
- 5
- Steel grade
- S355NL
- Wall thickness
- 14-40 mm
Lead time 10-14 weeks · Warranty 24 months · MOQ 10 nos
Shunt & series reactorsKonark3 variants
SampleShunt & series reactors Konark · KON-757 series
- Rating
- 80 MVAr to 200 MVAr (see variants)
- System voltage
- 220 kV
- Type
- Series
- Construction
- Oil-immersed gapped core
- Phases
- Single
Lead time 40-50 weeks · Warranty 36 months from supply · MOQ 10 nos
Flue-gas desulphurisation (FGD)Saurashtra6 variants
SampleFlue-gas desulphurisation (FGD) Saurashtra · SAU-772 series
- Boiler size
- 25 MW to 500 MW (see variants)
- Technology
- Dry sorbent
- SO2 removal efficiency
- 90%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Rubber lined carbon steel
Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 10 set
Mounting structures & trackersSatpura6 variants
SampleMounting structures & trackers Satpura · SAT-D09 series
- Structure type
- Rooftop metal sheet to Carport canopy (see variants)
- Material
- HDG steel
- Zinc coating
- 80 micron
- Design wind speed
- 50 m/s
- Module tilt
- Site latitude
Lead time 2-3 weeks · Warranty 10 years against corrosion · MOQ 1 kWp
Load-break & AB switchesJhelum6 variants
SampleLoad-break & AB switches Jhelum · JHE-863 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- AB switch
- Operation
- Gang operated manual
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 5 set
Solar pumps & controllersDwarakadeep3 variants
SampleSolar pumps & controllers Dwarakadeep · DWA-2E8 series
- Pump rating
- 10 HP to 20 HP (see variants)
- Pump type
- Floating
- Motor type
- BLDC
- Total head
- 50 m
- Daily discharge
- 100000 l
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 10 nos
Main inlet valves (butterfly, spherical)Jhelumojas4 variants
SampleMain inlet valves (butterfly, spherical) Jhelumojas · JHE-023 series
- Nominal diameter
- DN 600 to DN 1400 (see variants)
- Valve type
- Spherical
- Pressure rating
- PN 100
- Body material
- Cast steel WCB
- Seat seal
- Service and maintenance seals
Lead time 20-28 weeks · Warranty 36 months · MOQ 2 nos
Capacitor banks & APFCTungabhadrasamarth3 variants
SampleCapacitor banks & APFC Tungabhadrasamarth · TUN-AF2 series
- Rating
- 50 kVAr to 200 kVAr (see variants)
- Rated voltage
- 440 V
- Capacitor type
- Heavy-duty MPP
- Switching
- Contactor
- Detuning
- 14% (134 Hz)
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Supply-chain / invoice financeSudarshangen5 variants
SampleServiceSupply-chain / invoice finance Sudarshangen · SUD-AD2 series
- Programme limit
- INR 25 lakh to INR 25 crore (see variants)
- Structure
- Invoice discounting
- Advance rate
- 80-85% of invoice
- Tenor
- Up to 180 days
- Recourse
- Without recourse
Lead time Onboarding in 1-2 weeks · Warranty As per programme terms · MOQ 1 job