Insulated hand tools (1000 V)Mewar3 variants
SampleInsulated hand tools (1000 V) Mewar · MEW-494 series
- Kit size
- 12 pieces to 25 pieces (see variants)
- Rated voltage
- 1000 V AC
- Material
- Chrome molybdenum
- Insulation
- Dipped
- Handle colour
- Red and yellow
Lead time 1-2 weeks · Warranty Lifetime against material defects · MOQ 5 set
Charging cables & connectors (CCS2, Type 2)Awadh6 variants
SampleCharging cables & connectors (CCS2, Type 2) Awadh · AWA-DD1 series
- Current rating
- 32 A to 500 A (see variants)
- Connector standard
- CCS2
- Cable length
- 7.5 m
- Phases
- 3-phase
- Rated voltage
- 1000 V DC
Lead time 1-2 weeks · Warranty 24 months · MOQ 1 nos
Insulators (porcelain, polymer, glass)Brahmaputraanant5 variants
SampleInsulators (porcelain, polymer, glass) Brahmaputraanant · BRA-D45 series
- Voltage and strength
- 11 kV 45 kN to 220 kV 120 kN (see variants)
- Material
- Porcelain
- Type
- Strain
- Failing load
- 210 kN
- Creepage
- Anti-fog 40 mm/kV
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Ex instrumentsChola4 variants
Chola · CHO-053 series
- Instrument type
- Temperature RTD head-mount to Fixed gas detector (see variants)
- Protection type
- Ex db IIC T6
- Output
- 4-20 mA HART
- Accuracy
- ±0.5%
- Supply
- 24 VDC loop-powered
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Pumped-storage pump-turbines & motor-generatorsKonark5 variants
SamplePumped-storage pump-turbines & motor-generators Konark · KON-794 series
- Unit rating
- 100 MW to 400 MW (see variants)
- Machine type
- Motor-generator
- Head range
- 150-300 m
- Rated speed
- 500 rpm
- Mode
- Generating / pumping
Lead time 24-36 months · Warranty 24 months · MOQ 1 nos
Machining & CNCIndraprasthashikhar5 variants
SampleServiceMachining & CNC Indraprasthashikhar · IND-E29 series
- Part size envelope
- Up to 100 mm to Up to 1200 mm (see variants)
- Process
- VMC
- Material
- Stainless steel
- Tolerance
- +/-0.05 mm
- Surface finish
- Ra 0.8
Lead time 1-2 weeks · Warranty Rework of out-of-tolerance parts · MOQ 1 nos
Training & certification (electrical licence, work at height)Vidarbha6 variants
SampleServiceTraining & certification (electrical licence, work at height) Vidarbha · VID-ED7 series
- Course duration
- 2 days to 3 months (see variants)
- Programme
- Work at height
- Mode
- Classroom
- Batch size
- 30 participants
- Certification
- Training completion certificate
Lead time On-site within 2 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Panel wiring & assemblyKamrupnandi6 variants
SampleServicePanel wiring & assembly Kamrupnandi · KAM-0A2 series
- Panel complexity
- Up to 50 wires to Over 2000 wires (see variants)
- Panel type
- LT distribution
- Wiring standard
- IS 8623
- Wire type
- Multi-core
- Ferrules
- Printed with numbering
Lead time 3-5 weeks · Warranty Rework of wiring defects · MOQ 1 nos
Mounting structures & trackersPushpakcore6 variants
SampleMounting structures & trackers Pushpakcore · PUS-5F4 series
- Structure type
- Rooftop RCC flat to Single-axis tracker (see variants)
- Material
- Pre-galvanised steel
- Zinc coating
- HDG per IS 4759
- Design wind speed
- 50 m/s
- Module tilt
- Site latitude
Lead time 4-6 weeks · Warranty 25 years structural on galvanising · MOQ 2 kWp
Furnace & rectifier transformersKutchwatt3 variants
SampleFurnace & rectifier transformers Kutchwatt · KUT-2B9 series
- Rating
- 2 MVA to 10 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- Up to 1000 V
- Application
- Rectifier
- Cooling
- OFAF
Lead time 28-36 weeks · Warranty 24 months · MOQ 1 nos
Energy meters (smart, ABT, net)Lonavalatamra4 variants
SampleEnergy meters (smart, ABT, net) Lonavalatamra · LON-2F7 series
- Meter type
- 3-ph LTCT 5 A to ABT 0.2S 3P3W (see variants)
- Accuracy class
- 0.2S
- Reference voltage
- 3x240/415 V
- Frequency
- 50 Hz
- Communication
- Optical port + NIC
Lead time 2-3 weeks · Warranty 60 months from installation · MOQ 1 nos
Excavators, backhoes & loadersGridmax3 variants
SampleFor rentExcavators, backhoes & loaders Gridmax · GRI-D84 series
- Operating weight
- 3 t mini to 14 t (see variants)
- Bucket capacity
- 0.5 cu m
- Operator
- Included
- Fuel
- Included
- Attachments
- Hydraulic breaker
Lead time 3-5 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Service connections & meter boxesDeccanhertz5 variants
SampleService connections & meter boxes Deccanhertz · DEC-0A3 series
- Capacity
- 1 meter to 8 meters (see variants)
- Material
- SMC / FRP
- Phase
- Single phase
- Meter type
- CT-operated
- Degree of protection
- IP54
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Cable compounds (XLPE, PVC, LSZH)Neeltek5 variants
SampleCable compounds (XLPE, PVC, LSZH) Neeltek · NEE-A24 series
- Voltage application
- 1.1 kV to 132 kV (see variants)
- Compound type
- Semi-con
- Cross-linking
- Silane
- Melt flow index
- 1 g/10 min
- Colour
- Natural
Lead time 3-4 weeks · Warranty 12 months shelf life in sealed pack · MOQ 5 kg
Company secretarial & complianceWattgen3 variants
SampleServiceCompany secretarial & compliance Wattgen · WAT-B81 series
- Entity count
- 5 entities to 25 entities (see variants)
- Services
- Annual filing
- Entity type
- Public limited
- Filings
- AOC-4, MGT-7
- Secretarial audit
- Optional
Lead time Incorporation in 7-10 days · Warranty Professional indemnity · MOQ 1 month
Green open access & REC tradingNanditron6 variants
SampleServiceGreen open access & REC trading Nanditron · NAN-BB6 series
- Consumption
- 1 MW to 100 MW (see variants)
- Mechanism
- REC purchase
- Source
- Solar
- Services
- Approvals
- REC handling
- Trading on exchange
Lead time Contract 2-4 months · Warranty Compliance support · MOQ 1 job
Drilling & core cuttingPhasetek6 variants
SampleDrilling & core cutting Phasetek · PHA-EA4 series
- Maximum drill / core diameter
- 26 mm to 250 mm (see variants)
- Power
- 1500 W
- Voltage
- 230 V single phase
- Chuck
- MT3 taper
- Speed
- 2000 rpm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
Solar street lightsAkshaymax6 variants
SampleSolar street lights Akshaymax · AKS-3D3 series
- Wattage
- 18 W to 80 W (see variants)
- Battery
- LiFePO4
- Battery capacity
- 25.6 V 30 Ah
- Solar panel
- Mono PERC 150 Wp
- Controller
- MPPT
Lead time 4-5 weeks · Warranty 36 months from supply · MOQ 10 set
Insulated gloves & matsVolttek5 variants
SampleInsulated gloves & mats Volttek · VOL-045 series
- Voltage class
- Class 0 (1 kV) to Class 4 (36 kV) (see variants)
- Gloves length
- 280 mm
- Proof test
- 10 kV
- Material
- Composite
- Mat thickness
- 3 mm
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos
Ammonia & methanol synthesis equipmentSaurashtra6 variants
SampleAmmonia & methanol synthesis equipment Saurashtra · SAU-421 series
- Production capacity
- 1 TPD to 300 TPD (see variants)
- Product
- Ammonia
- Synthesis pressure
- 200 bar
- Reactor temperature
- 400-500 deg C
- Catalyst
- Cu/ZnO/Al2O3
Lead time 30-40 weeks · Warranty As per contract · MOQ 1 lot
High-efficiency (IE3/IE4) & HT motorsSaurashtra6 variants
SampleHigh-efficiency (IE3/IE4) & HT motors Saurashtra · SAU-E63 series
- Rating
- 7.5 kW to 500 kW (see variants)
- Efficiency class
- IE4
- Voltage
- 3.3 kV
- Speed
- 750 rpm
- Frame
- Fabricated
Lead time 20-26 weeks · Warranty 24 months · MOQ 2 nos
Surge protection devicesPataliputraohm3 variants
SampleSurge protection devices Pataliputraohm · PAT-778 series
- Rating
- Type 2, 20 kA, 600 VDC to Type 2, 40 kA, 1500 VDC (see variants)
- SPD class
- Type 2
- Max continuous voltage (Uc)
- 275 VAC
- Nominal discharge current (In)
- 40 kA
- Max discharge current (Imax)
- 80 kA
Lead time 1-2 weeks · Warranty 24 months · MOQ 1 nos
Reciprocating gas & dual-fuel enginesRavi3 variants
SampleReciprocating gas & dual-fuel engines Ravi · RAV-012 series
- Electrical output
- 1 MW to 4.5 MW (see variants)
- Fuel
- HSD / gas dual fuel
- Engine speed
- 1500 rpm
- Electrical efficiency
- 44%
- Cylinders
- V20
Lead time 16-24 weeks · Warranty 12 months · MOQ 1 nos
Fabrication & galvanisingNarmada6 variants
SampleServiceFabrication & galvanising Narmada · NAR-774 series
- Job complexity
- Cutting only to Fabrication and galvanising (see variants)
- Material supplied by
- Customer
- Process
- CNC punching
- Thickness range
- Up to 6 mm
- Tolerance
- +/-1 mm
Lead time 1-2 weeks · Warranty Rework of defects at no cost · MOQ 1 kg