Home & building automationNalanda3 variants
SampleHome & building automation Nalanda · NAL-A68 series
- Channels
- 4-channel to 16-channel (see variants)
- Protocol
- Modbus
- Supply voltage
- 24 V DC
- Load per channel
- 10 A
- Control
- App
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Wind turbine generatorsVidarbhaprithvi3 variants
SampleWind turbine generators Vidarbhaprithvi · VID-7A3 series
- Rated power
- 2.0 MW to 3.0 MW (see variants)
- Rotor diameter
- 140 m
- Hub height
- 120 m
- Drive train
- Direct drive
- Generator
- PMSG
Lead time 6-9 months · Warranty 5 years with O&M contract · MOQ 1 nos
Gas engines, CHP & cogeneration setsHampi4 variants
SampleGas engines, CHP & cogeneration sets Hampi · HAM-688 series
- Electrical output
- 250 kW to 2 MW (see variants)
- Fuel
- Biogas
- Electrical efficiency
- 44%
- Thermal output
- 3 MWth
- Total efficiency
- 80%
Lead time 24-32 weeks · Warranty 12 months · MOQ 10 nos
Insulating materials (pressboard, paper, mica, resins)Satavahanadhruv6 variants
SampleInsulating materials (pressboard, paper, mica, resins) Satavahanadhruv · SAT-0A3 series
- Thickness / grade
- 0.5 mm to 8 mm (see variants)
- Material
- Pressboard high density
- Density
- 1.25 g/cc
- Dielectric strength
- Min 8 kV/mm in oil
- Form
- Sheet
Lead time 1-2 weeks · Warranty 12 months shelf life · MOQ 2 kg
Fleet & depot charging systemsMahabaleshwarhertz3 variants
SampleFleet & depot charging systems Mahabaleshwarhertz · MAH-155 series
- Buses served
- 10 buses to 50 buses (see variants)
- Charger rating
- 360 kW
- Charging type
- Plug-in CCS2
- Dispensers
- 25
- Power cabinet
- Shared pool, 480 kW
Lead time 8-12 weeks · Warranty 12 months · MOQ 5 set
Fire-survival & LSZH cablesWayanadprabha4 variants
SampleFire-survival & LSZH cables Wayanadprabha · WAY-D29 series
- Size
- 4C x 16 sq mm to 4C x 120 sq mm (see variants)
- Fire resistance
- Circuit integrity 180 min
- Insulation
- XLPO
- Sheath
- LSZH
- Conductor
- Aluminium
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 2 m
DG & equipment rentalVayumark5 variants
SampleFor rentDG & equipment rental Vayumark · VAY-9F1 series
- DG capacity
- 30 kVA to 500 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- Silent canopy
- Operator
- Not included
Lead time Same day to 1 day · Warranty Replacement within 48 h · MOQ 1 nos
Carbon credits & offsetsKonark6 variants
SampleServiceCarbon credits & offsets Konark · KON-D53 series
- Annual credits
- 1,000 tCO2e to 500,000 tCO2e (see variants)
- Programme
- Voluntary market
- Project type
- Renewable energy
- Methodology
- Approved methodology selection
- MRV
- Annual report
Lead time Feasibility in 2-3 weeks · Warranty Fee linked to issuance · MOQ 1 job
Survey & inspection dronesKavachsys5 variants
SampleFor rentSurvey & inspection drones Kavachsys · KAV-6A3 series
- Drone class
- RTK mapping to Fixed wing 100 sq km (see variants)
- Sensor
- LiDAR
- Positioning
- PPK
- Flight time
- 45 min
- Pilot
- DGCA licensed remote pilot
Lead time 1 week · Warranty Re-flight at no charge if data unusable · MOQ 1 nos
Ash utilisationSaurashtra5 variants
Saurashtra · SAU-281 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Bottom ash
- Grade
- Siliceous Grade 2
- Loss on ignition
- Below 5%
- Moisture
- Below 5%
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 5 MT
Biomass boilers & gasifiersVidarbha6 variants
SampleBiomass boilers & gasifiers Vidarbha · VID-3F6 series
- Capacity
- 1 TPH to 50 TPH (see variants)
- Fuel
- Wood chips
- Steam pressure
- 45 bar
- Firing system
- Travelling grate
- Efficiency
- 82%
Lead time 16-24 weeks · Warranty 18 months from supply · MOQ 2 nos
Solar productive-use appliances (cold rooms, mills, dryers)Godavari5 variants
SampleSolar productive-use appliances (cold rooms, mills, dryers) Godavari · GOD-5C5 series
- Capacity
- 2 MT to 30 MT (see variants)
- Appliance type
- Cold room
- Solar array
- 20 kWp
- Storage temperature
- -18 C
- Insulation
- PUF 100 mm
Lead time 6-10 weeks · Warranty 24 months on compressor · MOQ 2 nos
Static transfer switchesUjjayini3 variants
SampleStatic transfer switches Ujjayini · UJJ-DF1 series
- Rating
- 400 A to 1600 A (see variants)
- Phase
- 3-phase 4-wire
- Rated voltage
- 230 V AC
- Transfer time
- Below 6 ms
- Transfer type
- Break-before-make
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Trench coversMewararc5 variants
Mewararc · MEW-CF1 series
- Cover size (L x W)
- 500 x 300 mm to 1000 x 750 mm (see variants)
- Material
- Mild steel chequered plate
- Thickness
- 50 mm
- Load class
- Light vehicle 5 t
- Weight
- 12 kg
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Section insulators & neutral sectionsSabarmati3 variants
SampleSection insulators & neutral sections Sabarmati · SAB-C92 series
- Type
- Standard section insulator to Insulated overlap (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Simulators & e-learningUrjatron4 variants
SampleServiceSimulators & e-learning Urjatron · URJ-6A8 series
- Licensed users
- 50 users to 500 users (see variants)
- Product type
- Web LMS
- Content
- Substation switching and faults
- Languages
- Regional languages
- Assessment
- Quizzes and scored simulations
Lead time Custom content 8-12 weeks · Warranty Bug fixes at no cost · MOQ 1 nos
Live-line & hot-stick toolsMahabaleshwarohm5 variants
SampleLive-line & hot-stick tools Mahabaleshwarohm · MAH-C53 series
- Rated voltage
- 33 kV to 400 kV (see variants)
- Material
- FRP epoxy glass tube
- Length
- 4.5 m
- Type
- Insulating ladder
- Head fittings
- Clamp stick
Lead time 3-4 weeks · Warranty Re-test every 6 months recommended · MOQ 5 nos
Factory acceptance test (FAT) witnessingMalwavolt5 variants
SampleServiceFactory acceptance test (FAT) witnessing Malwavolt · MAL-175 series
- Equipment value
- INR 50 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day
VFDs & soft startersVaigai6 variants
SampleVFDs & soft starters Vaigai · VAI-341 series
- Rating
- 0.75 kW to 132 kW (see variants)
- Input voltage
- 3-ph 415 V ±10%
- Control mode
- Sensorless vector
- Overload
- 150% 60 s (constant torque)
- Protection class
- IP66
Lead time 1-2 weeks · Warranty 18 months from commissioning · MOQ 1 nos
Feeder pillars & LT distribution boxesJhelum3 variants
SampleFeeder pillars & LT distribution boxes Jhelum · JHE-699 series
- Rating
- 100 A to 400 A (see variants)
- Enclosure material
- CRCA sheet steel
- Ways
- 8-way
- Busbar
- Copper
- Incomer
- Switch-fuse
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 10 nos
Transformer NIFPSBeas6 variants
Beas · BEA-5C3 series
- Transformer oil volume
- Up to 10 kL to Above 100 kL (see variants)
- Principle
- Drain and stir
- Nitrogen cylinders
- 3 x 68 L
- Operating pressure
- 150 bar
- Oil drain valve
- Pneumatic
Lead time 8-10 weeks · Warranty 24 months from commissioning · MOQ 1 set
Fire-survival & LSZH cablesKonarkdeep6 variants
SampleFire-survival & LSZH cables Konarkdeep · KON-FA9 series
- Size
- 2C x 1.5 sq mm to 4C x 70 sq mm (see variants)
- Fire resistance
- Circuit integrity 180 min
- Insulation
- XLPE
- Sheath
- LSZH
- Conductor
- Copper
Lead time 4-5 weeks · Warranty As per contract · MOQ 10 m
SF6 circuit breakersMalabarojas6 variants
SampleSF6 circuit breakers Malabarojas · MAL-CD4 series
- System voltage
- 36 kV to 800 kV (see variants)
- Rated current
- 3150 A
- Breaking current
- 40 kA
- Operating mechanism
- Spring-spring
- Operation
- 3-pole
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Energy meters (smart, ABT, net)Beas3 variants
SampleEnergy meters (smart, ABT, net) Beas · BEA-5C7 series
- Meter type
- 1-ph smart 5-30 A to 3-ph LTCT 5 A (see variants)
- Accuracy class
- 0.5S
- Reference voltage
- 3x63.5/110 V
- Frequency
- 50 Hz
- Communication
- Optical port + NIC
Lead time 4-6 weeks · Warranty 5 years from supply · MOQ 1 nos