Primary & secondary injection kitsDwarakasamarth6 variants
SamplePrimary & secondary injection kits Dwarakasamarth · DWA-3D7 series
- Output current
- 100 A to 6000 A (see variants)
- Output voltage
- 12 V
- Duty cycle
- Short time 5 min
- Supply
- 230 V AC
- Meters
- Digital ammeter 0.5%
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 set
Ex instrumentsGarudaline4 variants
Garudaline · GAR-D27 series
- Instrument type
- Pressure 0-100 bar to Flow (vortex) DN50 (see variants)
- Protection type
- Ex db IIC T6
- Output
- 4-20 mA HART
- Accuracy
- ±0.1%
- Supply
- 24 VDC loop-powered
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 nos
Bird diverters, aviation warning spheres & anti-climbing devicesRavi6 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Ravi · RAV-0C7 series
- Conductor / size
- Spiral for 10-15 mm to Anti-climbing spikes (see variants)
- Material
- Fibreglass
- Colour
- White
- Visibility
- Day and night reflective
- Fixing
- Clip-on
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
EOT & gantry cranes, hoistsJhelum5 variants
SampleEOT & gantry cranes, hoists Jhelum · JHE-913 series
- Capacity
- 1 t to 20 t (see variants)
- Span
- 7.5 m
- Duty class
- M4
- Hoisting speed
- 5/0.8 m/min
- Lift height
- 12 m
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 nos
MV XLPE cablesMysore5 variants
Mysore · MYS-5F1 series
- Size
- 3C x 95 sq mm to 3C x 300 sq mm (see variants)
- Voltage grade
- 19/33 kV (E)
- Conductor
- Aluminium
- Insulation
- XLPE
- Screen
- Copper tape
Lead time 6-8 weeks · Warranty As per contract · MOQ 1 km
I-V curve tracers & EL testers (solar)Magadhlumen5 variants
SampleI-V curve tracers & EL testers (solar) Magadhlumen · MAG-6D3 series
- Max DC voltage / current
- 1000 V 10 A to EL camera 10 MP (see variants)
- Measurement
- I-V curve
- Irradiance sensor
- Pyranometer
- Temperature sensor
- IR thermometer
- Accuracy
- +/-0.5%
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 5 nos
DG & equipment rentalJhelum6 variants
SampleFor rentDG & equipment rental Jhelum · JHE-9B7 series
- DG capacity
- 15 kVA to 500 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- CPCB IV+ canopy
- Operator
- Included
Lead time 2-3 days · Warranty Replacement within 48 h · MOQ 1 nos
InvertersVindhya3 variants
Vindhya · VIN-F03 series
- AC rated power
- 5 kW to 25 kW (see variants)
- Phase
- Single phase
- Max DC input voltage
- 1000 V
- MPPT range
- 550-1500 V
- Number of MPPT
- 2
Lead time 3-5 weeks · Warranty 10 years extended · MOQ 1 nos
Poles (PSC, steel, tubular)Taptishakti5 variants
SamplePoles (PSC, steel, tubular) Taptishakti · TAP-2D9 series
- Pole length
- 9 m to 18 m (see variants)
- Type
- Rolled steel
- Working load
- 300 kg
- Cross section
- Rectangular
- Steel grade
- Fe 410
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Grid connectivity & GNA applicationsRavipushpak3 variants
SampleServiceGrid connectivity & GNA applications Ravipushpak · RAV-379 series
- Capacity applied
- 100 MW to 500 MW (see variants)
- Application
- GNA
- Scope
- End-to-end liaison
- Bank guarantee
- Arranged by client
- Studies
- Detailed power system study
Lead time Filing in 1-2 weeks · Warranty Rework of deficient applications · MOQ 1 application
Wind turbine sparesCoorgshikhar3 variants
SampleWind turbine spares Coorgshikhar · COO-D02 series
- Turbine class
- 2 MW to 3.3 MW (see variants)
- Component
- Filter
- Fits make
- As per turbine nameplate
- Origin
- OEM
- Material
- Steel
Lead time 8-16 weeks · Warranty 18 months from supply · MOQ 1 nos
PumpsVayumax5 variants
Vayumax · VAY-705 series
- Power rating
- 15 HP to 300 HP (see variants)
- Flow
- 10 m3/h
- Head
- 50 m
- Casing material
- SS 316
- Impeller
- CF8M
Lead time 1-3 weeks · Warranty 12 months · MOQ 1 nos
Field instruments (pressure, temperature, flow, level)Satpura4 variants
SampleField instruments (pressure, temperature, flow, level) Satpura · SAT-145 series
- Range / size
- 0-25 bar / DN50 to 0-600 bar / DN150 (see variants)
- Output
- FOUNDATION Fieldbus
- Accuracy
- ±0.075%
- Process connection
- G1/2
- Wetted material
- SS 316L
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Aspirating smoke detectionJhelumfaraday4 variants
SampleAspirating smoke detection Jhelumfaraday · JHE-F05 series
- Coverage
- Up to 250 m² / 1 pipe to Up to 2000 m² (see variants)
- Sensitivity
- Class A (very high)
- Detection
- Laser light scattering
- Alarm levels
- Alert, Action, Fire 1, Fire 2
- Pipe network
- Up to 400 m
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 5 nos
Equipotential bondingMysoreakshay4 variants
SampleEquipotential bonding Mysoreakshay · MYS-988 series
- Capacity
- 6-way bar to Jumper 16 mm² x 300 mm (see variants)
- Bar material
- Electrolytic copper
- Bar size
- 100x10 mm
- Terminals
- M8 studs
- Insulators
- SMC
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 set
Effluent & sewage treatment (ETP / STP)Nilgiri3 variants
SampleEffluent & sewage treatment (ETP / STP) Nilgiri · NIL-772 series
- Capacity
- 100 KLD to 500 KLD (see variants)
- Process
- MBR
- Tank material
- RCC
- Treated BOD
- Below 20 mg/l
- Blower
- Ring blower
Lead time 8-12 weeks · Warranty 24 months on equipment · MOQ 5 set
Waste-to-energy (incineration, RDF)Ajanta6 variants
SampleWaste-to-energy (incineration, RDF) Ajanta · AJA-262 series
- Plant capacity
- 100 TPD to 1500 TPD (see variants)
- Technology
- Gasification
- Fuel
- Industrial waste
- Calorific value
- 3200 kcal/kg
- Steam parameters
- 42 bar / 400 C
Lead time 18-24 months · Warranty 24 months · MOQ 1 lot
Solar plant O&M & module cleaningTrishulmark6 variants
SampleServiceSolar plant O&M & module cleaning Trishulmark · TRI-D92 series
- Plant capacity
- 5 MWp to 250 MWp (see variants)
- Scope
- Full O&M with spare management
- Cleaning method
- Robotic
- Cleaning frequency
- Fortnightly
- Availability guarantee
- Grid availability 99.5%
Lead time Takeover in 2-3 weeks · Warranty Availability guarantee with penalty · MOQ 1 MWp
Cabling, trenching & HDD worksVindhyatarang5 variants
SampleServiceCabling, trenching & HDD works Vindhyatarang · VIN-3B7 series
- Cable route length
- 1 km to 20 km (see variants)
- Method
- Open trench
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.5 m
- Cable type
- LT armoured
Lead time Permits may extend timeline · Warranty Restoration warranty 6 months · MOQ 1 km
Condition monitoring systems (CMS)Thanjavur3 variants
SampleCondition monitoring systems (CMS) Thanjavur · THA-538 series
- Channels
- 4 channels to 12 channels (see variants)
- Sensor type
- Fibre Bragg grating
- Sampling rate
- 25.6 kHz
- Frequency range
- 0.1 Hz-10 kHz
- Data storage
- Cloud
Lead time 3-5 weeks · Warranty 3 years with subscription · MOQ 10 set
GIS & network planningKamrup5 variants
SampleGIS & network planning Kamrup · KAM-BA7 series
- Users / scale
- Single user to Enterprise 500 users (see variants)
- Deployment
- Mobile + web
- Data formats
- KML
- Network analysis
- Tracing, connectivity, load flow
- Basemaps
- Satellite
Lead time 8-12 weeks · Warranty Support under AMC · MOQ 2 licence
Air compressors & dryersPallava3 variants
SampleAir compressors & dryers Pallava · PAL-A36 series
- Motor rating
- 7.5 kW to 22 kW (see variants)
- Working pressure
- 8.5 bar
- Free air delivery
- 1.2 cu m/min
- Type
- Oil-free screw
- Drive
- Fixed speed
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Drilling & core cuttingCoromandeljyoti6 variants
SampleDrilling & core cutting Coromandeljyoti · COR-107 series
- Maximum drill / core diameter
- 26 mm to 250 mm (see variants)
- Power
- 2200 W
- Voltage
- 230 V single phase
- Chuck
- SDS Max
- Speed
- 2000 rpm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 5 nos
Insulation & tan delta testersAkshaymark4 variants
SampleInsulation & tan delta testers Akshaymark · AKS-DA2 series
- Maximum test voltage
- 2.5 kV to 12 kV (see variants)
- Resistance range
- Up to 10 Tohm
- Tests
- IR, PI, DAR
- Display
- Colour TFT
- Power supply
- 230 V AC and battery
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos