Thermography & condition monitoringGarudatron6 variants
SampleServiceThermography & condition monitoring Garudatron · GAR-537 series
- Asset size
- 1 MW to 100 MW (see variants)
- Technique
- Partial discharge testing
- Camera resolution
- 640x480 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Ground sampling 3 cm per pixel
Lead time Report in 5-10 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site
Land identification & aggregationTungabhadra3 variants
SampleServiceLand identification & aggregation Tungabhadra · TUN-618 series
- Land requirement
- 25 acres to 100 acres (see variants)
- Land type
- Wasteland
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- 7/12 extracts, mutation, maps
Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre
High-mast & flood lightsDeccan5 variants
SampleHigh-mast & flood lights Deccan · DEC-F69 series
- Wattage
- 50 W to 300 W (see variants)
- Luminous efficacy
- 150 lm/W
- Beam angle
- 90 deg
- Colour temperature
- 6500 K
- CRI
- Above 70
Lead time 4-6 weeks · Warranty 60 months from supply · MOQ 5 nos
Module cleaning systemsKonkan4 variants
SampleModule cleaning systems Konkan · KON-BF3 series
- Plant capacity covered
- 1 MWp to 50 MWp (see variants)
- Cleaning method
- Waterless
- Drive
- Diesel tractor
- Row length handled
- Up to 150 m
- Cleaning speed
- 10 m/min
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 set
Mounting structures & trackersBundellumen4 variants
SampleMounting structures & trackers Bundellumen · BUN-C94 series
- Structure type
- Elevated rooftop to Single-axis tracker (see variants)
- Material
- Zn-Al-Mg coated steel
- Zinc coating
- 86 micron
- Design wind speed
- 47 m/s
- Module tilt
- 10 deg
Lead time 2-3 weeks · Warranty 25 years structural on galvanising · MOQ 1 kWp
Power semiconductors (IGBT, SiC, thyristors)Neeltron5 variants
SamplePower semiconductors (IGBT, SiC, thyristors) Neeltron · NEE-7E4 series
- Rating
- 1200 V / 75 A to 3300 V / 800 A (see variants)
- Device type
- Trench IGBT
- Topology
- Half-bridge
- Package
- Press-pack
- Isolation voltage
- 4 kV
Lead time 12-20 weeks · Warranty 12 months from supply · MOQ 1 nos
GST & tax advisoryWattgen5 variants
SampleServiceGST & tax advisory Wattgen · WAT-073 series
- Annual turnover
- INR 25 crore to INR 1000 crore (see variants)
- Scope
- Monthly compliance
- Issues
- Works contract GST
- Returns
- GSTR-1 and 3B
- Litigation
- Reply to notices
Lead time Opinion in 5-10 days · Warranty Professional indemnity · MOQ 1 month
Ammonia & methanol synthesis equipmentJhelumkiran5 variants
SampleAmmonia & methanol synthesis equipment Jhelumkiran · JHE-422 series
- Production capacity
- 1 TPD to 100 TPD (see variants)
- Product
- Methanol
- Synthesis pressure
- 200 bar
- Reactor temperature
- 400-500 deg C
- Catalyst
- Iron based
Lead time 30-40 weeks · Warranty As per contract · MOQ 1 lot
Covered conductors & LT spacersAwadh5 variants
SampleCovered conductors & LT spacers Awadh · AWA-E22 series
- Conductor size
- 70 mm2 to 185 mm2 (see variants)
- Voltage
- 11 kV
- Conductor
- AAAC
- Insulation
- HDPE
- Layers
- Triple (tree wire)
Lead time 6-8 weeks · Warranty 12 months · MOQ 2 km
Solar module recyclingKakatiya5 variants
SampleServiceSolar module recycling Kakatiya · KAK-9D6 series
- Quantity
- 10 tonnes to 1000 tonnes (see variants)
- Process
- Reuse testing
- Recovery rate
- 90%+
- Materials recovered
- Silicon, silver
- Authorisation
- Authorised under E-waste Rules
Lead time Processing 2-8 weeks · Warranty Certificate of destruction · MOQ 1 tonne
EarthwireGodavari4 variants
Godavari · GOD-238 series
- Size
- 7/3.15 mm to OPGW 12F (see variants)
- Type
- Alumoweld
- Strands
- 7
- Tensile strength
- 70 kN
- Fibres
- 12
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 km
Effluent & sewage treatment (ETP / STP)Betwafaraday5 variants
SampleEffluent & sewage treatment (ETP / STP) Betwafaraday · BET-776 series
- Capacity
- 25 KLD to 500 KLD (see variants)
- Process
- MBBR
- Tank material
- FRP
- Treated BOD
- Below 30 mg/l
- Blower
- Twin lobe
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 set
Lender's engineer & TEV studiesDeepmark5 variants
SampleServiceLender's engineer & TEV studies Deepmark · DEE-9D6 series
- Project cost
- INR 50 crore to INR 1000 crore (see variants)
- Phase
- Pre-financing TEV
- Scope
- Contract and permit review
- Reporting
- TEV report
- Site visits
- Monthly
Lead time Appointment in 1 week · Warranty Report reliance letter to lenders · MOQ 1 report
Protective coatings & wrapsDeccanpushpak4 variants
SampleProtective coatings & wraps Deccanpushpak · DEC-405 series
- Pack size
- 1 litre to 20 litre (see variants)
- Coating type
- Zinc rich
- Number of packs
- Two pack
- Dry film thickness
- 150 micron
- Solid by volume
- 55%
Lead time 3-7 days · Warranty 12 months shelf life · MOQ 1 litre
SCADA / EMS / DMS platformsLonavala5 variants
SampleSCADA / EMS / DMS platforms Lonavala · LON-5E7 series
- Points / tags
- 500 tags to 100,000 tags (see variants)
- Architecture
- Client-server
- Protocols
- OPC UA
- Database
- Historian
- Redundancy
- Hot standby
Lead time 12-20 weeks · Warranty 12 months support · MOQ 1 licence
DC connectors (MC4-type)Sahyadri4 variants
SampleDC connectors (MC4-type) Sahyadri · SAH-2E7 series
- Conductor size
- 1.5 sq mm to 6 sq mm (see variants)
- Rated current
- 35 A
- Rated voltage
- 1500 V DC
- Contact material
- Tinned copper
- Housing
- PPO
Lead time 1 week · Warranty 12 months from supply · MOQ 1 pair
Bus post insulators & clampsPrithvicore4 variants
SampleBus post insulators & clamps Prithvicore · PRI-AE2 series
- System voltage
- 36 kV to 245 kV (see variants)
- Type
- Pillar insulator
- Cantilever strength
- 12.5 kN
- Creepage
- 31 mm/kV
- Material
- Silicone composite
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Fabrication & galvanisingIndraprasthashikhar6 variants
SampleServiceFabrication & galvanising Indraprasthashikhar · IND-406 series
- Job complexity
- Cutting only to Fabrication and galvanising (see variants)
- Material supplied by
- Fabricator
- Process
- Laser cutting
- Thickness range
- Up to 25 mm
- Tolerance
- +/-2 mm
Lead time 3-4 weeks · Warranty Rework of defects at no cost · MOQ 1 kg
Geotextiles & slope protectionMewararc6 variants
SampleGeotextiles & slope protection Mewararc · MEW-A64 series
- Mass per unit area
- 100 gsm to 600 gsm (see variants)
- Material
- Polyester
- Construction
- Geocell
- Roll width
- 5 m
- Roll length
- 100 m
Lead time 1-2 weeks · Warranty 10 years UV life (limited) · MOQ 1 sq m
Submarine & export cablesKonark6 variants
SampleSubmarine & export cables Konark · KON-182 series
- Rating
- 33 kV 3C x 185 sq mm to 220 kV 3C x 800 sq mm (see variants)
- Conductor
- Copper
- Insulation
- XLPE
- Water barrier
- Lead sheath
- Armour
- Single-layer galvanised steel wire
Lead time 20-28 weeks · Warranty 24 months from commissioning · MOQ 5 km
Conduits, boxes & fittingsAravalidhruv3 variants
SampleConduits, boxes & fittings Aravalidhruv · ARA-952 series
- Nominal diameter
- 25 mm to 40 mm (see variants)
- Material
- Rigid PVC
- Wall class
- Heavy
- Length
- 3 m
- Colour
- Orange
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 m
Fire extinguishersAjanta4 variants
Ajanta · AJA-556 series
- Capacity
- 6 kg to 50 kg wheeled (see variants)
- Type
- CO2
- Class rating
- A B C E
- Cylinder material
- Aluminium
- Operating pressure
- Stored pressure 15 bar
Lead time 1-2 weeks · Warranty 12 months · MOQ 5 nos
SF6-free (vacuum, clean-air) HV breakersMadurai5 variants
SampleSF6-free (vacuum, clean-air) HV breakers Madurai · MAD-CC2 series
- System voltage
- 36 kV to 245 kV (see variants)
- Insulation medium
- Dry air
- Interrupter
- Vacuum
- Rated current
- 1250 A
- Breaking current
- 40 kA
Lead time 30-40 weeks · Warranty 36 months · MOQ 1 nos
VCB panelsCoromandelampere6 variants
Coromandelampere · COR-B76 series
- Rating
- 11 kV 630 A to 33 kV 1250 A (see variants)
- Short-circuit rating
- 20 kA/3 s
- Construction
- Metal-clad withdrawable
- Breaker operating duty
- O-0.3 s-CO-3 min-CO
- Control voltage
- 110 V DC
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos