Servo stabilisers & isolation transformersKavachline5 variants
SampleServo stabilisers & isolation transformers Kavachline · KAV-476 series
- Rating
- 25 kVA to 500 kVA (see variants)
- Primary voltage
- 380-440 V
- Secondary voltage
- 415 V
- Phases
- 3-ph
- Winding
- Aluminium
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 1 nos
Third-party inspection (TPI)Deccan5 variants
SampleServiceThird-party inspection (TPI) Deccan · DEC-AE3 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
ERP, project & document managementKamrup6 variants
SampleERP, project & document management Kamrup · KAM-EA8 series
- Users
- 10 users to 500 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 10-16 weeks · Warranty Support with AMC · MOQ 5 licence
Training & certification (electrical licence, work at height)Tamraline3 variants
SampleServiceTraining & certification (electrical licence, work at height) Tamraline · TAM-4F7 series
- Course duration
- 5 days to 30 days (see variants)
- Programme
- Work at height
- Mode
- On-site
- Batch size
- 12 participants
- Certification
- Skill council NSQF aligned
Lead time On-site within 2 weeks · Warranty Re-training for missed sessions · MOQ 1 nos
Concrete batching & transit mixersMagadh6 variants
SampleFor rentConcrete batching & transit mixers Magadh · MAG-042 series
- Output capacity
- Mobile mixer 3 cu m to Boom pump 60 cu m/h (see variants)
- Drum capacity
- 9 cu m
- Type
- Self loading
- Operator
- Not included
- Fuel
- Included
Lead time 1 week · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Cable cleatsCoorgkavach3 variants
Coorgkavach · COO-773 series
- Cable diameter
- 45-60 mm to 80-100 mm (see variants)
- Arrangement
- Single
- Material
- Nylon 66
- Short-circuit rating
- Up to 100 kA peak
- Fixing
- M10
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Hybrid & dead-tank switchgearUjjayini4 variants
SampleHybrid & dead-tank switchgear Ujjayini · UJJ-077 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Dead tank
- Rated current
- 4000 A
- Breaking current
- 40 kA
- Gas
- SF6
Lead time 16-24 weeks · Warranty 24 months · MOQ 5 nos
Converters & turbine controllersBundelakshay4 variants
SampleConverters & turbine controllers Bundelakshay · BUN-676 series
- Converter rating
- 600 kVA to 2000 kVA (see variants)
- Converter type
- Full-power back-to-back
- Output voltage
- 690 V
- Switching device
- IGBT
- Cooling
- Air
Lead time 8-12 weeks · Warranty 24 months · MOQ 1 nos
Cable fault locatorsMaurya4 variants
SampleCable fault locators Maurya · MAU-893 series
- Surge voltage
- 8 kV to 20 kV (see variants)
- Surge energy
- 300 J
- Methods
- TDR, ARM, Decay
- Cable length range
- Up to 10 km
- Display
- Colour touch
Lead time 8-12 weeks · Warranty 12 months from supply · MOQ 1 set
SF6-free (vacuum, clean-air) HV breakersJhelum5 variants
SampleSF6-free (vacuum, clean-air) HV breakers Jhelum · JHE-CC6 series
- System voltage
- 36 kV to 245 kV (see variants)
- Insulation medium
- Dry air
- Interrupter
- Vacuum
- Rated current
- 3150 A
- Breaking current
- 25 kA
Lead time 16-20 weeks · Warranty 36 months · MOQ 10 nos
Noise controlParamline5 variants
Paramline · PAR-008 series
- Insertion loss
- 20 dB to 40 dB (see variants)
- Equipment served
- Transformer
- Panel construction
- GI perforated with rockwool
- Infill
- PU foam
- Sheet thickness
- 1.6 mm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Safety nets & barricadesTapti4 variants
SampleSafety nets & barricades Tapti · TAP-744 series
- Size / type
- Net 3x3 m to Barricade 2 m (see variants)
- Net material
- Nylon
- Mesh size
- 100 mm
- Net strength
- Drop test 100 kg from 6 m
- Border rope
- 12 mm polypropylene
Lead time 2-3 weeks · Warranty 12 months · MOQ 1 m
Insulating materials (pressboard, paper, mica, resins)Deccan6 variants
SampleInsulating materials (pressboard, paper, mica, resins) Deccan · DEC-C31 series
- Thickness / grade
- 0.5 mm to 8 mm (see variants)
- Material
- Pressboard high density
- Density
- 1.25 g/cc
- Dielectric strength
- Min 12 kV/mm
- Form
- Moulded part
Lead time 1-2 weeks · Warranty Test report per batch · MOQ 5 kg
Asset & O&M managementKamrup6 variants
SampleAsset & O&M management Kamrup · KAM-E22 series
- Capacity covered
- Up to 5 MWp to Portfolio unlimited (see variants)
- Deployment
- Cloud SaaS
- Users
- Unlimited
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 4-6 weeks · Warranty Support included for subscription term · MOQ 2 licence
Land identification & aggregationGarudatron4 variants
SampleServiceLand identification & aggregation Garudatron · GAR-0F6 series
- Land requirement
- 100 acres to 1000 acres (see variants)
- Land type
- Wasteland
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- Revenue records and survey numbers
Lead time Aggregation 3-9 months · Warranty As per contract · MOQ 1 acre
E-waste managementJhelum4 variants
SampleServiceE-waste management Jhelum · JHE-9E4 series
- E-waste quantity
- 100 kg to 5 tonnes (see variants)
- Service
- Collection and recycling
- Categories
- Electrical and electronic
- Authorisation
- State PCB authorised
- Data destruction
- Shredding
Lead time Pick-up in 5-7 days · Warranty Certificate of recycling · MOQ 1 tonne
Cable fault locatorsMalwa4 variants
SampleCable fault locators Malwa · MAL-897 series
- Surge voltage
- 16 kV to 40 kV (see variants)
- Surge energy
- 300 J
- Methods
- Pulse echo, ARM, SIM
- Cable length range
- Up to 20 km
- Display
- Colour touch
Lead time 8-12 weeks · Warranty 12 months from supply · MOQ 1 set
PCC, MCC, ACDB, DCDBKamrup4 variants
SamplePCC, MCC, ACDB, DCDB Kamrup · KAM-B11 series
- Rating
- 400 A to 1600 A (see variants)
- Panel type
- DCDB
- System voltage
- 415 V AC
- Short-circuit rating
- 25 kA/1 s
- Form of separation
- Form 3b
Lead time 6-8 weeks · Warranty 18 months from supply · MOQ 2 nos
Fire extinguishersTeestavajra3 variants
Teestavajra · TEE-8B7 series
- Capacity
- 2 kg to 6 kg (see variants)
- Type
- Clean agent (HFC-236fa)
- Class rating
- A B C
- Cylinder material
- Aluminium
- Operating pressure
- Stored pressure 15 bar
Lead time 2-3 weeks · Warranty 60 months for body · MOQ 5 nos
Boiler & turbine sparesMunnarloha6 variants
SampleBoiler & turbine spares Munnarloha · MUN-F05 series
- Unit size
- 10 MW to 500 MW (see variants)
- Component
- Superheater
- Tube material
- SA 210 A1
- Blade material
- 17-4 PH
- OEM compatibility
- BHEL type
Lead time 4-8 weeks · Warranty 12 months · MOQ 1 set
Housekeeping & cleaning suppliesKrishna3 variants
SampleHousekeeping & cleaning supplies Krishna · KRI-076 series
- Pack size
- 20 litre to 210 litre (see variants)
- Product type
- Detergent
- pH
- 9-11
- Dilution
- 1:50
- Residue
- Biodegradable
Lead time 3-7 days · Warranty 24 months shelf life in sealed pack · MOQ 5 nos
Gas-based suppressionVindhya4 variants
SampleGas-based suppression Vindhya · VIN-613 series
- Protected volume
- 50-150 m³ to 1000-3000 m³ (see variants)
- Agent
- CO2
- Cylinder pressure
- 42 bar
- Discharge time
- 10 seconds
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 1 set
SF6-free (vacuum, clean-air) HV breakersVijaya4 variants
SampleSF6-free (vacuum, clean-air) HV breakers Vijaya · VIJ-525 series
- System voltage
- 72.5 kV to 245 kV (see variants)
- Insulation medium
- Clean air
- Interrupter
- Multi-break vacuum
- Rated current
- 3150 A
- Breaking current
- 25 kA
Lead time 16-20 weeks · Warranty 36 months · MOQ 10 nos
Furnace & rectifier transformersBundel5 variants
SampleFurnace & rectifier transformers Bundel · BUN-BF4 series
- Rating
- 10 MVA to 100 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- SAF
- Cooling
- OFWF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 5 nos