Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Hampineel · HAM-A06 series

Rating / band
Wave trap 400 A to Wave trap 2000 A (see variants)
System voltage
132 kV
Frequency band
24-500 kHz
Inductance
0.5 mH
Blocking impedance
> 570 Ω

Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price on quote

by Hampineel Networks (Sample) · invoiced by BARREL

Request quote

FAT for GIS and switchgear, Volt series

SampleServiceFactory acceptance test (FAT) witnessing

Vidyutline · VID-177 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
International factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

by Vidyutline Technical Services (Sample) · invoiced by BARREL

Request quote

Project warehousing near solar and wind sites, Ultra series

SampleServiceWarehousing & yard management

Mysorevidyut · MYS-641 series

Storage area
2500 sq m to 25000 sq m (see variants)
Storage type
Open yard
Handling equipment
Heavy cranes up to 100 tonnes
Security
Perimeter fencing, access control
Inventory system
Daily stock statement

Lead time Space available in 3-7 days · Warranty Stock loss indemnity as per agreement · MOQ 1 month

Price for verified buyers

by Mysorevidyut Infra Services (Sample) · invoiced by BARREL

Request quote

LED tunnel luminaire, Smart series

SampleTunnel, port & stadium lighting

Akshaymax · AKS-534 series

Wattage
200 W to 400 W (see variants)
Luminous efficacy
130 lm/W
Beam optics
Asymmetric
Colour temperature
4000 K
CRI
Above 80

Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 1 nos

Price for verified buyers

by Akshaymax Luminaires (Sample) · invoiced by BARREL

Request quote

Wall-mounted first aid cabinet, Titan 3 series

SampleFirst aid & emergency showers

Kamrupsetu · KAM-754 series

Type / size
Kit for 10 persons to Eye wash portable 16 L (see variants)
Cabinet material
Powder-coated steel
Contents
Dressings, burn gel, antiseptics, splints
Eye wash flow
11.4 L/min for 15 min
Shower flow
75 L/min

Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Kamrupsetu Safety Equipment (Sample) · invoiced by BARREL

Request quote

Coreless induction furnace, Titan series

SampleInduction & arc furnaces

Hertzgen · HER-798 series

Furnace capacity
6 MT to 60 MT (see variants)
Type
Coreless induction
Power supply
1.5 MW
Frequency
500 Hz
Charge material
DRI/HBI

Lead time 20-30 weeks · Warranty 18 months · MOQ 1 nos

Price for verified buyers

by Hertzgen Furnaces (Sample) · invoiced by BARREL

Request quote

Industrial vacuum cleaner, Eco series

SampleHousekeeping & cleaning supplies

Narmada · NAR-1D2 series

Pack size
20 litre to 1000 litre (see variants)
Product type
Detergent
pH
9-11
Dilution
Ready to use
Residue
Non-residue

Lead time 3-7 days · Warranty 24 months shelf life in sealed pack · MOQ 2 nos

Price on quote

by Narmada Workshop Supplies (Sample) · invoiced by BARREL

Request quote

MC4 crimping tool kit, Neo 2 series

SampleDC connectors (MC4-type)

Narmadaprithvi · NAR-4E7 series

Conductor size
2.5 sq mm to 6 sq mm (see variants)
Rated current
45 A
Rated voltage
1500 V DC
Contact material
Tinned copper
Housing
PC

Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 pair

Price for verified buyers

by Narmadaprithvi Cable Systems (Sample) · invoiced by BARREL

Request quote

VMC machining, Duo series

SampleServiceMachining & CNC

Ujjayinisetu · UJJ-E27 series

Part size envelope
Up to 100 mm to Up to 500 mm (see variants)
Process
EDM wire cut
Material
Brass
Tolerance
+/-0.05 mm
Surface finish
Ra 0.8

Lead time 1-2 weeks · Warranty Rework of out-of-tolerance parts · MOQ 1 nos

Price for verified buyers

by Ujjayinisetu Workshop Supplies (Sample) · invoiced by BARREL

Request quote

Drawdown certification, Ultra series

SampleServiceLender's engineer & TEV studies

Vidyuttron · VID-BF9 series

Project cost
INR 50 crore to INR 2500 crore (see variants)
Phase
Construction monitoring
Scope
Technical, cost and schedule review
Reporting
TEV report
Site visits
At milestones

Lead time 4-8 weeks for TEV · Warranty Report reliance letter to lenders · MOQ 1 report

Price for verified buyers

by Vidyuttron Engineering Services (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited