Packing & cratingMaurya5 variants
SampleServicePacking & crating Maurya · MAU-916 series
- Packing volume
- 20 CBM to 500 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- Desiccant and moisture barrier
- Marking
- Handling symbols, tags
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty Packing damage replacement · MOQ 1 lot
Protective coatings & wrapsSutlej3 variants
SampleProtective coatings & wraps Sutlej · SUT-AC7 series
- Pack size
- 1 litre to 10 litre (see variants)
- Coating type
- Zinc rich
- Number of packs
- Single pack
- Dry film thickness
- 50 micron
- Solid by volume
- 55%
Lead time 3-7 days · Warranty 12 months shelf life · MOQ 1 litre
PPA structuring & advisoryJhelum3 variants
SampleServicePPA structuring & advisory Jhelum · JHE-752 series
- Contract capacity
- 100 MW to 500 MW (see variants)
- PPA type
- Time-of-day tariff
- Counterparty
- SECI-type intermediary
- Deliverables
- Term sheet
- Tenor
- 15 years
Lead time 3-8 weeks · Warranty As per contract · MOQ 1 job
Feasibility studies & DPRTamraline3 variants
SampleServiceFeasibility studies & DPR Tamraline · TAM-BB5 series
- Project capacity
- 100 MW to 1 GW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- WAsP wind energy assessment
- Financial model
- Sensitivity and tariff analysis
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report
Feasibility studies & DPRNilgiritesla5 variants
SampleServiceFeasibility studies & DPR Nilgiritesla · NIL-BB9 series
- Project capacity
- 5 MW to 500 MW (see variants)
- Scope
- Bankable DPR
- Energy yield
- WAsP wind energy assessment
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- GNA/connectivity route study
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Statutory approvals (CEIG, pollution, forest)Arcmark3 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Arcmark · ARC-D97 series
- Approval package
- Solar park set (8) to Transmission project set (12) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Drawing and application preparation
- Liaison
- Site inspection coordination
- Statutory fee
- Included
Lead time Approval 4-24 weeks · Warranty As per contract · MOQ 1 application
String combiner boxes & DCDBNilgirisudarshan6 variants
SampleString combiner boxes & DCDB Nilgirisudarshan · NIL-963 series
- Inputs
- 4 in 1 out to 24 in 1 out (see variants)
- Rated voltage
- 1000 V DC
- Output current
- 32 A
- Enclosure material
- Powder-coated MS
- Ingress protection
- IP65
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 nos
SFRA, winding resistance & turns-ratio testersShivalik5 variants
SampleSFRA, winding resistance & turns-ratio testers Shivalik · SHI-366 series
- Test current / range
- 5 A winding resistance to SFRA 20 Hz-2 MHz (see variants)
- Instrument
- Winding resistance
- Accuracy
- 0.1%
- Frequency range
- 20 Hz to 2 MHz
- Dynamic range
- Over 100 dB
Lead time 6-10 weeks · Warranty 24 months with calibration · MOQ 1 nos
Control & relay panelsTejtron4 variants
SampleControl & relay panels Tejtron · TEJ-4D5 series
- System voltage
- 66 kV to 400 kV (see variants)
- Panel type
- Free-standing
- Bay type
- Transformer
- Protection
- O/C + E/F
- Panel size
- 1000 x 800 x 2200 mm
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 1 nos
AlternatorsGupta5 variants
Gupta · GUP-331 series
- Rating
- 50 kVA to 1000 kVA (see variants)
- Voltage
- 6.6 kV
- Excitation
- Self-excited brushless
- Poles
- 4
- Insulation class
- H
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Cable drum jacks & trailersPhasetek4 variants
SampleCable drum jacks & trailers Phasetek · PHA-958 series
- Drum capacity
- 2 t to 8 t (see variants)
- Maximum drum diameter
- 1.2 m
- Maximum drum width
- 1.4 m
- Axle
- Single
- Jack type
- Mechanical screw
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 1 nos
Traction SCADATaxila3 variants
Taxila · TAX-EA4 series
- Control posts
- Up to 10 posts to Up to 50 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot
Gas engines, CHP & cogeneration setsThanjavur5 variants
SampleGas engines, CHP & cogeneration sets Thanjavur · THA-A43 series
- Electrical output
- 100 kW to 2 MW (see variants)
- Fuel
- LPG
- Electrical efficiency
- 40%
- Thermal output
- 3 MWth
- Total efficiency
- 80%
Lead time 24-32 weeks · Warranty 24 months or 8000 hours · MOQ 1 nos
Hybrid & off-grid inverters, charge controllersSatpura4 variants
SampleHybrid & off-grid inverters, charge controllers Satpura · SAT-859 series
- Rated power
- 5 kVA to 15 kVA (see variants)
- Battery voltage
- 192 V
- Battery type
- Lithium-ion
- Max PV input
- 12 kW
- Controller type
- PWM
Lead time 3-4 weeks · Warranty 5 years on hybrid units · MOQ 5 nos
Cabling, trenching & HDD worksChola6 variants
SampleServiceCabling, trenching & HDD works Chola · CHO-C11 series
- Cable route length
- 1 km to 50 km (see variants)
- Method
- Open trench
- HDD capacity
- Up to 450 mm bore
- Trench depth
- 0.9 m
- Cable type
- 11/33 kV XLPE
Lead time Permits may extend timeline · Warranty Restoration warranty 6 months · MOQ 1 km
Bay control units & gatewaysHoysala3 variants
SampleBay control units & gateways Hoysala · HOY-C94 series
- I/O capacity
- 16 DI / 8 DO to 64 DI / 32 DO (see variants)
- Analog inputs
- 8
- Protocols south
- IEC 61850
- Protocols north
- IEC 61850
- Interlocking
- Bay and station level
Lead time 8-10 weeks · Warranty 24 months · MOQ 5 nos
Home & building automationBeasfaraday3 variants
SampleHome & building automation Beasfaraday · BEA-BB9 series
- Channels
- 4-channel to 16-channel (see variants)
- Protocol
- Wi-Fi
- Supply voltage
- 230 V AC
- Load per channel
- 10 A
- Control
- App
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 2 nos
Generation forecastingRavi4 variants
SampleGeneration forecasting Ravi · RAV-471 series
- Plant capacity
- Up to 50 MW to Up to 500 MW (see variants)
- Forecast horizon
- 7-day
- Resolution
- 15-minute blocks
- Update frequency
- Every 15 minutes
- Method
- NWP + machine learning
Lead time 1-2 weeks · Warranty Monthly accuracy report included · MOQ 10 month
Fencing & gatesVajraline6 variants
Vajraline · VAJ-FA8 series
- Fence height
- 1.2 m to 3.0 m (see variants)
- Mesh type
- Welded 75x25 mm
- Wire diameter
- 4.0 mm
- Post
- 75 NB GI pipe
- Post spacing
- 2.5 m
Lead time 1-2 weeks · Warranty 12 months against coating defects · MOQ 1 m
Changeover switches & ATS panelsSamarthmax3 variants
SampleChangeover switches & ATS panels Samarthmax · SAM-258 series
- Rating
- 250 A to 630 A (see variants)
- Type
- Motorised changeover
- Poles
- 4P
- Rated voltage
- 415 V AC
- Transfer device
- Interlocked MCCB
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Substation & line O&MKaveriohm6 variants
SampleServiceSubstation & line O&M Kaveriohm · KAV-728 series
- Voltage level
- 11 kV to 400 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 month
Compact secondary substationsKakatiya6 variants
SampleCompact secondary substations Kakatiya · KAK-6C7 series
- Transformer rating
- 100 kVA to 1600 kVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.433 kV
- HV equipment
- Ring main unit
- Transformer type
- Cast resin dry
Lead time 10-14 weeks · Warranty 18 months · MOQ 5 nos
Live-line & hot-stick toolsTeesta4 variants
SampleLive-line & hot-stick tools Teesta · TEE-209 series
- Rated voltage
- 11 kV to 132 kV (see variants)
- Material
- FRP epoxy glass tube
- Length
- 3 m
- Type
- Telescopic
- Head fittings
- Universal head
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Insulated gloves & matsWattsys5 variants
SampleInsulated gloves & mats Wattsys · WAT-256 series
- Voltage class
- Class 00 (500 V) to Class 3 (26.5 kV) (see variants)
- Gloves length
- 280 mm
- Proof test
- 30 kV
- Material
- Natural rubber latex
- Mat thickness
- 6 mm
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos