SF6 gas & handlingWayanad5 variants
Wayanad · WAY-D49 series
- Cylinder size
- 5 kg to 50 kg (see variants)
- Purity
- 99.99%
- Moisture
- Below 5 ppmv
- Cylinder
- Aluminium
- Valve
- CGA 590
Lead time 1-2 weeks · Warranty Test certificate per cylinder · MOQ 1 kg
CCTV & video analyticsTaptisetu6 variants
SampleCCTV & video analytics Taptisetu · TAP-2A2 series
- Item
- IP bullet 4 MP to NVR 64-ch (see variants)
- Resolution
- 2 MP
- Lens
- 2.8-12 mm varifocal
- IR range
- 50 m
- Video compression
- H.265+
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 5 nos
Excavators, backhoes & loadersAravali5 variants
SampleFor rentExcavators, backhoes & loaders Aravali · ARA-707 series
- Operating weight
- 3 t mini to 30 t (see variants)
- Bucket capacity
- 0.5 cu m
- Operator
- Included
- Fuel
- Included
- Attachments
- Auger
Lead time 1-2 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Power conversion systems (PCS)Pallavaswarna4 variants
SamplePower conversion systems (PCS) Pallavaswarna · PAL-8F4 series
- Rated power
- 250 kW to 1.725 MW (see variants)
- DC voltage range
- 600-900 V
- AC output voltage
- 400 V
- Topology
- Two-level IGBT
- Peak efficiency
- 99%
Lead time 4-6 weeks · Warranty 5 years standard · MOQ 10 nos
EIA, ESG & environmental studiesPallava5 variants
SampleServiceEIA, ESG & environmental studies Pallava · PAL-929 series
- Project scale
- 50 MW to 1 GW (see variants)
- Study
- Rapid EIA
- Baseline season
- Three seasons
- Deliverables
- Draft EIA, EMP, public hearing support
- Lab testing
- NABL accredited lab
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
AlternatorsTaxilasurya4 variants
Taxilasurya · TAX-D61 series
- Rating
- 50 kVA to 500 kVA (see variants)
- Voltage
- 11 kV
- Excitation
- Self-excited brushless
- Poles
- 4
- Insulation class
- F
Lead time 8-12 weeks · Warranty 24 months · MOQ 1 nos
IoT & remote monitoringAwadh3 variants
SampleIoT & remote monitoring Awadh · AWA-B03 series
- Channels / points
- 64 inputs to 256 inputs (see variants)
- Connectivity
- Ethernet + 4G
- Protocols
- Modbus RTU/TCP
- Serial ports
- 1 x RS-485
- Digital I/O
- 8 DI / 4 DO
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
Testing & commissioningHoysala6 variants
SampleServiceTesting & commissioning Hoysala · HOY-8F8 series
- Plant capacity
- 5 MW to 250 MW (see variants)
- Tests covered
- String IV curve, insulation, earth
- Instruments
- Calibrated IV tracer, megger, CRM
- Calibration
- Calibration valid at test date
- Team
- Lead plus 5 member crew
Lead time Mobilisation in 5 days · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW
VFDs & soft startersMahanadi6 variants
SampleVFDs & soft starters Mahanadi · MAH-345 series
- Rating
- 0.75 kW to 132 kW (see variants)
- Input voltage
- 3-ph 415 V ±10%
- Control mode
- V/f
- Overload
- 110% 60 s (variable torque)
- Protection class
- IP54
Lead time 1-2 weeks · Warranty 18 months from commissioning · MOQ 5 nos
Energy meters (smart, ABT, net)Magadh3 variants
SampleEnergy meters (smart, ABT, net) Magadh · MAG-5C1 series
- Meter type
- 3-ph LTCT 5 A to ABT 0.2S 3P4W (see variants)
- Accuracy class
- 1.0
- Reference voltage
- 3x63.5/110 V
- Frequency
- 50 Hz
- Communication
- Optical port + NIC
Lead time 4-6 weeks · Warranty 5 years from supply · MOQ 2 nos
Compact secondary substationsTejmark5 variants
SampleCompact secondary substations Tejmark · TEJ-6C5 series
- Transformer rating
- 100 kVA to 1000 kVA (see variants)
- Primary voltage
- 22 kV
- Secondary voltage
- 0.69 kV
- HV equipment
- Ring main unit
- Transformer type
- Cast resin dry
Lead time 6-8 weeks · Warranty 18 months · MOQ 1 nos
Feeder pillars & LT distribution boxesPataliputra3 variants
SampleFeeder pillars & LT distribution boxes Pataliputra · PAT-691 series
- Rating
- 100 A to 400 A (see variants)
- Enclosure material
- SMC / FRP
- Ways
- 4-way
- Busbar
- Copper
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Harmonic filtersVindhyaurja5 variants
Vindhyaurja · VIN-025 series
- Filter rating
- 25 kVAr to 300 kVAr (see variants)
- Tuned to
- 5th
- Voltage
- 11 kV
- Reactor core
- CRGO laminated
- Reactor insulation
- Class H
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos
DCIM softwareVindhyaneel3 variants
SampleServiceDCIM software Vindhyaneel · VIN-124 series
- Scope
- Up to 250 racks to Up to 1000 racks (see variants)
- Licence type
- Perpetual
- Deployment
- On-premises
- Monitoring points
- Unlimited
- Protocols
- BACnet
Lead time 1-2 weeks · Warranty Updates for 12 months · MOQ 1 licence
Synchronising panelsGupta3 variants
SampleSynchronising panels Gupta · GUP-EE9 series
- Gensets in parallel
- 6 gensets to 10 gensets (see variants)
- Bus rating
- 800 A
- Voltage
- 11 kV
- Fault level
- 65 kA
- Controller
- Genset controller per set
Lead time 8-12 weeks · Warranty 12 months · MOQ 2 nos
Copper rods, strips & busbarsMalwa6 variants
SampleCopper rods, strips & busbars Malwa · MAL-A82 series
- Rod / busbar size
- 8 mm rod to 100 x 10 mm (see variants)
- Grade
- Cu-DHP
- Conductivity
- Min 98% IACS
- Temper
- Annealed
- Form
- Strip
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 2 kg
Static transfer switchesKonark4 variants
SampleStatic transfer switches Konark · KON-693 series
- Rating
- 63 A to 400 A (see variants)
- Phase
- 1-phase
- Rated voltage
- 230 V AC
- Transfer time
- Below 4 ms
- Transfer type
- Break-before-make
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Street lightsMalabar3 variants
Malabar · MAL-EA6 series
- Wattage
- 45 W to 90 W (see variants)
- Luminous efficacy
- 150 lm/W
- Colour temperature
- 6500 K
- CRI
- Above 80
- Ingress protection
- IP65
Lead time 4-5 weeks · Warranty 60 months from supply · MOQ 1 nos
Biomass handling & storageMunnaragni4 variants
SampleBiomass handling & storage Munnaragni · MUN-137 series
- Storage capacity
- 10 m3 to 250 m3 (see variants)
- Equipment
- Conveyor
- Material
- Mild steel IS 2062
- Discharge rate
- 5 TPH
- Motor power
- 3 kW
Lead time 8-14 weeks · Warranty 12 months · MOQ 10 nos
Feeder pillars & LT distribution boxesDwaraka5 variants
SampleFeeder pillars & LT distribution boxes Dwaraka · DWA-C07 series
- Rating
- 200 A to 1250 A (see variants)
- Enclosure material
- Stainless steel
- Ways
- 8-way
- Busbar
- Copper
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Transformer & scrap disposalGodavari5 variants
SampleServiceTransformer & scrap disposal Godavari · GOD-B55 series
- Scrap quantity
- 1 tonne to 100 tonnes (see variants)
- Scrap type
- Batteries
- Process
- Auction
- Authorisation
- Hazardous waste permit
- PCB testing
- Not applicable
Lead time Processing 1-4 weeks · Warranty Certificate of disposal · MOQ 1 lot
Water storage & pumpingKrishnashikhar5 variants
SampleWater storage & pumping Krishnashikhar · KRI-897 series
- Motor rating
- 7.5 kW to 75 kW (see variants)
- Pump type
- End suction
- Head
- 100 m
- Flow
- 50 cu m/h
- Casing material
- Cast iron
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Floating solar floats & anchoringSuryaline5 variants
SampleFloating solar floats & anchoring Suryaline · SUR-831 series
- Plant size
- 1 MWp to 100 MWp (see variants)
- Float material
- Hollow rotomoulded HDPE
- Module orientation
- Portrait
- Tilt angle
- 10 deg
- Anchoring
- Concrete block
Lead time 4-6 weeks · Warranty 10 years on floats · MOQ 1 kWp
Covered conductors & LT spacersSuryamax5 variants
SampleCovered conductors & LT spacers Suryamax · SUR-773 series
- Conductor size
- 95 mm2 to 240 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- ACSR
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 km