Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Import freight forwarding and customs clearance, Core series

SampleServiceFreight forwarding & customs clearance

Teesta · TEE-C79 series

Shipment size
20 ft container to Multiple containers (see variants)
Mode
Sea LCL
Customs services
Duty planning and classification
Incoterm
DAP
Permits
Solar and EPCG benefits

Lead time Booking in 2-3 days · Warranty Claims support · MOQ 1 lot

Price on quote

by Teesta Consultants (Sample) · invoiced by BARREL

Request quote

Solar resource assessment with ground measurement, Core series

SampleServiceResource assessment (solar, wind, hydro)

Vidyuttron · VID-0E6 series

Measurement duration
6 months to 18 months (see variants)
Technology
Small hydro
Data source
On-site measurement
Equipment
Class A pyranometer station
Uncertainty
P50/P90 with uncertainty budget

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

by Vidyuttron Engineering Services (Sample) · invoiced by BARREL

Request quote

Hybrid GIS-AIS bay, Max series

SampleHybrid & dead-tank switchgear

Amaravatianant · AMA-8F9 series

System voltage
72.5 kV to 420 kV (see variants)
Concept
Compact
Rated current
4000 A
Breaking current
31.5 kA
Gas
SF6-free

Lead time 16-24 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Amaravatianant Switchgear (Sample) · invoiced by BARREL

Request quote

Grey iron casting job work, Prime series

SampleServiceCasting & forging

Narmada · NAR-3F8 series

Casting weight
Up to 25 kg to Over 500 kg (see variants)
Material
WCB steel
Process
Sand casting
Pattern
Customer supplied
Machining
Finish machined

Lead time 6-8 weeks · Warranty Replacement of defective castings · MOQ 1 kg

Price on quote

by Narmada Job Works (Sample) · invoiced by BARREL

Request quote

Stockbridge vibration damper, Ultra series

SampleHardware fittings & dampers

Konkangrid · KON-8B6 series

Conductor type
Moose to Quad Moose (see variants)
Component
Earthwire clamp
Material
Forged aluminium alloy
Rated load
210 kN
Slip strength
95% of RBL

Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos

Price for verified buyers

by Konkangrid Conductors (Sample) · invoiced by BARREL

Request quote

Saurashtra · SAU-707 series

Rating
400 A to 1000 A (see variants)
Panel type
ACDB
System voltage
220 V DC
Short-circuit rating
65 kA/1 s
Form of separation
Form 4b

Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 nos

Price for verified buyers

by Saurashtra Switchboards (Sample) · invoiced by BARREL

Request quote

Spring-cage terminal block, Elite series

SampleConnectors & terminal blocks

Tirhutohm · TIR-6B1 series

Rating
2.5 mm² / 24 A to 16 mm² / 76 A (see variants)
Connection type
Push-in
Rated voltage
1000 V
Housing material
PBT
Conductor material
Tinned copper

Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos

Price on quote

by Tirhutohm Electronics (Sample) · invoiced by BARREL

Request quote

NGR with current transformer, Pro series

SampleNeutral grounding resistors

Ujjayini · UJJ-091 series

Rated current
50 A to 1500 A (see variants)
System voltage
33 kV
Resistance
20 ohm
Time rating
Continuous
Element
SS 304 grid

Lead time 4-6 weeks · Warranty 18 months · MOQ 1 nos

Price for verified buyers

by Ujjayini Switchgear (Sample) · invoiced by BARREL

Request quote

Airavatmax · AIR-E52 series

Capacity
CMRI handheld to 3-ph 3-position 0.05 (see variants)
Reference accuracy
0.05%
Voltage range
57.7-480 V
Current range
0.001-100 A
Source type
Programmable electronic source

Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos

Price for verified buyers

by Airavatmax SCADA Systems (Sample) · invoiced by BARREL

Request quote

Biodiversity and avifauna study, Edge 2 series

SampleServiceEIA, ESG & environmental studies

Ravipushpak · RAV-449 series

Project scale
100 MW to 1 GW (see variants)
Study
Rapid EIA
Baseline season
One season
Deliverables
Final EIA with approvals
Lab testing
NABL accredited lab

Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report

Price on quote

by Ravipushpak Projects (Sample) · invoiced by BARREL

Request quote

Solar plant decommissioning and dismantling, Ultra series

SampleServicePlant decommissioning & dismantling

Beasphase · BEA-CF1 series

Plant capacity
10 MW to 100 MW (see variants)
Scope
Dismantling with recycling
Technology
Wind
Cranes
Heavy crawler cranes
Material disposal
Recycler tie-up

Lead time Execution 4 weeks to 6 months · Warranty Site restoration certificate · MOQ 1 MW

Price for verified buyers

by Beasphase Advisory (Sample) · invoiced by BARREL

Request quote

Web GIS portal for discoms, Ultra series

SampleGIS & network planning

Satavahana · SAT-B37 series

Users / scale
5 users to 100 users (see variants)
Deployment
Mobile + web
Data formats
GeoJSON
Network analysis
Tracing, connectivity, load flow
Basemaps
Cadastral overlay

Lead time 8-12 weeks · Warranty 12 months support · MOQ 1 licence

Price for verified buyers

by Satavahana Digital Systems (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited