Prefab control roomsPallavaparam3 variants
SamplePrefab control rooms Pallavaparam · PAL-546 series
- Floor area
- 48 sq m to 96 sq m (see variants)
- Wall panel
- Precast RCC
- Fire rating
- 2 hour
- Roof
- Flat RCC with waterproofing
- Flooring
- Anti-static vinyl
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Boiler & turbine sparesPataliputra4 variants
SampleBoiler & turbine spares Pataliputra · PAT-7F6 series
- Unit size
- 60 MW to 500 MW (see variants)
- Component
- Turbine blades
- Tube material
- SA 213 T22
- Blade material
- 12Cr
- OEM compatibility
- BHEL type
Lead time 12-20 weeks · Warranty 12 months · MOQ 1 set
Plant decommissioning & dismantlingPrithvimark6 variants
SampleServicePlant decommissioning & dismantling Prithvimark · PRI-D04 series
- Plant capacity
- 5 MW to 250 MW (see variants)
- Scope
- Dismantling with recycling
- Technology
- Solar
- Cranes
- Heavy crawler cranes
- Material disposal
- Client store
Lead time Execution 4 weeks to 6 months · Warranty Workmanship 6 months · MOQ 1 MW
HVAC & ventilationWayanad6 variants
Wayanad · WAY-4A9 series
- Capacity
- 1.5 TR to 10 TR (see variants)
- Type
- Ducted
- Refrigerant
- R32
- Power supply
- 415 V 3 phase
- Compressor
- Scroll
Lead time 3-4 weeks · Warranty 5 years compressor · MOQ 1 nos
Fire-rated coatings & penetration sealsAjanta3 variants
SampleFire-rated coatings & penetration seals Ajanta · AJA-E73 series
- Fire rating
- 90 min to 180 min (see variants)
- Product type
- Mineral wool board
- Application
- Brush or airless spray
- Thickness
- 1 mm wet
- Smoke and toxicity
- Low smoke, halogen-free
Lead time 1-2 weeks · Warranty 10 years performance (system) · MOQ 1 kg
Welding consumablesKonarksamarth3 variants
SampleWelding consumables Konarksamarth · KON-A68 series
- Electrode / wire diameter
- 4.0 mm to 0.8 mm wire (see variants)
- Classification
- E308L-16
- Coating
- Basic low hydrogen
- Current type
- DC+
- Tensile strength
- Min 490 MPa
Lead time 3-7 days · Warranty 12 months shelf life in sealed pack · MOQ 5 kg
Substation constructionKaverishikhar5 variants
SampleServiceSubstation construction Kaverishikhar · KAV-092 series
- Voltage class
- 33 kV to 400 kV (see variants)
- Type
- Indoor GIS
- Scope
- Full turnkey
- Transformers
- Up to 160 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay
Static VAR compensators (SVC)Vidarbhaojas4 variants
SampleStatic VAR compensators (SVC) Vidarbhaojas · VID-724 series
- Rating
- 2 MVAr to 20 MVAr (see variants)
- System voltage
- 66 kV
- Configuration
- TCR + FC
- Thyristor valve
- Water-cooled
- Response time
- < 20 ms
Lead time 20-28 weeks · Warranty 36 months from commissioning · MOQ 2 nos
DG & equipment rentalVidarbha3 variants
SampleFor rentDG & equipment rental Vidarbha · VID-9F9 series
- DG capacity
- 250 kVA to 1010 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Client scope
- Enclosure
- Silent canopy
- Operator
- Included
Lead time Same day to 1 day · Warranty Replacement within 48 h · MOQ 1 nos
Wind turbine sparesMarwar3 variants
SampleWind turbine spares Marwar · MAR-CC3 series
- Turbine class
- 1.5 MW to 2.5 MW (see variants)
- Component
- Pitch bearing
- Fits make
- As per turbine nameplate
- Origin
- Compatible
- Material
- Sintered metal
Lead time 8-16 weeks · Warranty 18 months from supply · MOQ 1 nos
Hardware fittings & dampersPrabhamark6 variants
SampleHardware fittings & dampers Prabhamark · PRA-CF8 series
- Conductor type
- Rabbit to Twin Moose (see variants)
- Component
- Earthwire clamp
- Material
- Forged aluminium alloy
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 2 nos
Industrial heat pumpsHertzgen3 variants
SampleIndustrial heat pumps Hertzgen · HER-6E4 series
- Heating capacity
- 50 kW to 500 kW (see variants)
- Refrigerant
- R1234ze
- Heat source
- Waste water
- Source temperature
- 40-80 deg C
- Sink temperature
- Up to 90 deg C
Lead time 20-26 weeks · Warranty 12 months · MOQ 10 nos
Data & telecom cables (Cat6, coaxial)Maduraijoule6 variants
SampleData & telecom cables (Cat6, coaxial) Maduraijoule · MAD-A67 series
- Type
- Cat5e UTP to RG6 coaxial (see variants)
- Box length
- 500 m
- Conductor
- 23 AWG bare copper
- Pairs
- 1 pair + power
- Jacket
- LSZH
Lead time 2-3 weeks · Warranty 25 years system warranty (certified installs) · MOQ 1 box
PLC & DCSShivalik3 variants
Shivalik · SHI-233 series
- I/O points
- 256 I/O to 1024 I/O (see variants)
- CPU memory
- 512 KB
- Scan time
- < 0.1 ms per 1k
- Redundancy
- None
- Programming
- IEC 61131-3 (LD, FBD, ST)
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Isolators & earth switchesRajatline5 variants
SampleIsolators & earth switches Rajatline · RAJ-B85 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 1250 A
- Type
- Vertical break
- Earth switch
- With 1 earth switch
- Short-time current
- 25 kA
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 5 nos
Smart lighting controls & CCMSAkshaymax4 variants
SampleSmart lighting controls & CCMS Akshaymax · AKS-029 series
- Capacity
- 20 A to 100 A (see variants)
- Controller type
- Segment controller
- Communication
- 4G
- Protocol
- Modbus
- Phases
- 1-phase
Lead time 2-3 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Rack PDUs & buswayNarmadakavach6 variants
Narmadakavach · NAR-326 series
- Current
- 63 A to 800 A (see variants)
- Type
- Basic
- Phase
- 3-phase
- Outlets
- 12 x C13
- Voltage
- 400 V
Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 10 nos
Cooling-water & boiler chemicalsNilgiri4 variants
SampleCooling-water & boiler chemicals Nilgiri · NIL-BE6 series
- Pack size
- 50 kg to 1000 kg (see variants)
- Chemical type
- pH booster
- Form
- Powder
- Active content
- 30%
- pH of product
- 9-11
Lead time 1-2 weeks · Warranty Shelf life 12 months from manufacture · MOQ 5 kg
Live-line & hot-stick toolsMagadhrajat5 variants
SampleLive-line & hot-stick tools Magadhrajat · MAG-C51 series
- Rated voltage
- 11 kV to 220 kV (see variants)
- Material
- FRP pultruded
- Length
- 6 m
- Type
- Telescopic
- Head fittings
- Clamp stick
Lead time 1-2 weeks · Warranty Re-test every 6 months recommended · MOQ 5 nos
Nacelle components & main bearingsDoaba4 variants
SampleNacelle components & main bearings Doaba · DOA-D38 series
- Turbine rating
- 2.0 MW to 3.6 MW (see variants)
- Component
- Bedplate
- Bearing type
- Tapered roller double row
- Bore diameter
- 500 mm
- Material
- SG iron 400-18
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 nos
Cable transit & sealing systemsDoabasamarth3 variants
SampleCable transit & sealing systems Doabasamarth · DOA-D49 series
- Opening
- Round 150 mm to Frame 200 x 100 mm (see variants)
- Type
- Fire pillow
- Fire rating
- EI 120
- Seal material
- EPDM rubber
- Frame material
- Polyamide
Lead time 4-6 weeks · Warranty 10 years from supply · MOQ 1 nos
Aerial work platforms & boom liftsBrahmaputraakash4 variants
SampleFor rentAerial work platforms & boom lifts Brahmaputraakash · BRA-763 series
- Working height
- 8 m scissor to 20 m telescopic (see variants)
- Platform capacity
- 230 kg
- Drive
- Hybrid
- Outreach
- 16 m
- Insulation
- Not insulated
Lead time 1-2 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Charging hubs & canopiesTaptinandi5 variants
SampleCharging hubs & canopies Taptinandi · TAP-1C7 series
- Parking bays
- 4 bays to 40 bays (see variants)
- Structure
- Pre-engineered building
- Roof
- Polycarbonate
- Solar capacity
- 20 kWp
- Wind load design
- Up to 180 km/h
Lead time 12-16 weeks · Warranty 10 years on structure · MOQ 1 nos
OT cybersecurity (IEC 62443)Amaravati3 variants
SampleOT cybersecurity (IEC 62443) Amaravati · AMA-B39 series
- Assets monitored
- Up to 1,000 assets to Up to 20,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- IEC 104
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- SIEM syslog
Lead time 4-6 weeks · Warranty 24x7 support under subscription · MOQ 1 licence