Flue-gas desulphurisation (FGD)Kamrup4 variants
SampleFlue-gas desulphurisation (FGD) Kamrup · KAM-776 series
- Boiler size
- 120 MW to 500 MW (see variants)
- Technology
- Wet limestone-gypsum
- SO2 removal efficiency
- 95%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 24-36 weeks · Warranty 24 months performance guarantee · MOQ 1 set
Contract engineersKakatiyarajat5 variants
SampleServiceContract engineers Kakatiyarajat · KAK-824 series
- Engineers deployed
- 3 engineers to 50 engineers (see variants)
- Discipline
- SCADA
- Experience
- 5-10 years
- Qualification
- B.E./B.Tech
- Engagement
- Offsite design hub
Lead time Joining in 2-4 weeks · Warranty Replacement within 30 days if unsuitable · MOQ 1 man-month
SCADA, RTU & plant controllersChola5 variants
SampleSCADA, RTU & plant controllers Chola · CHO-266 series
- I/O capacity
- 32 DI / 16 DO / 8 AI to 512 I/O modular (see variants)
- Protocols
- DNP3
- CPU
- ARM Cortex-A9
- Power supply
- 24 VDC
- Operating temperature
- -10 to 60 °C
Lead time 4-6 weeks · Warranty 36 months from supply · MOQ 1 nos
PV modulesPushpakcore3 variants
Pushpakcore · PUS-521 series
- Rated power
- 440 Wp to 550 Wp (see variants)
- Cell technology
- Mono PERC
- Cell configuration
- 120 half-cut
- Module efficiency
- 21.2%
- Maximum system voltage
- 1500 V DC
Lead time 1-2 weeks · Warranty 12 years product, 25 years performance · MOQ 10 nos
Wind resource assessment (met masts, LiDAR, SoDAR)Godavari6 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Godavari · GOD-EA9 series
- Measurement height
- 50 m to 200 m (see variants)
- Instrument type
- Met mast
- Mast construction
- Lattice
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 6
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 set
Fibre optic (OPGW, ADSS)Hoysala5 variants
SampleFibre optic (OPGW, ADSS) Hoysala · HOY-5D4 series
- Fibre count
- 36F to 144F (see variants)
- Cable type
- Armoured underground
- Fibre type
- G.652D single-mode
- Structure
- Multi-tube stranded
- Short-circuit rating
- 150 kA2s
Lead time 10-14 weeks · Warranty 24 months from supply · MOQ 5 km
Product certification (BIS, IEC, ALMM)Airavatsys5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Airavatsys · AIR-465 series
- Certification scope
- ALMM List-I to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
Data & telecom cables (Cat6, coaxial)Akashtek4 variants
SampleData & telecom cables (Cat6, coaxial) Akashtek · AKA-434 series
- Type
- Cat5e UTP to Cat6A U/FTP (see variants)
- Box length
- 500 m
- Conductor
- Copper clad aluminium
- Pairs
- 4 pair
- Jacket
- LSZH
Lead time 1 week · Warranty 12 months from supply · MOQ 2 box
Refurbished & used equipmentKanchi5 variants
SampleUsedRefurbished & used equipment Kanchi · KAN-569 series
Good · made 2017
- Equipment rating
- 25 kVA to 1 MVA (see variants)
- Condition
- Refurbished
- Age
- 5-10 years
- Test report
- Insulation and ratio test
- Voltage class
- 33 kV
Lead time 1-2 weeks · Warranty 6 months from supply · MOQ 10 nos
Freight forwarding & customs clearanceMagadh4 variants
SampleServiceFreight forwarding & customs clearance Magadh · MAG-0E8 series
- Shipment size
- 1 CBM to 40 ft container (see variants)
- Mode
- Multimodal
- Customs services
- Duty planning and classification
- Incoterm
- DAP
- Permits
- BIS, WPC, import licences
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
Auxiliary, trip & timer relaysSahyadri5 variants
SampleAuxiliary, trip & timer relays Sahyadri · SAH-3F5 series
- Coil voltage
- 24 V DC to 230 V AC (see variants)
- Relay type
- Timer 2
- Contacts
- 8NO
- Contact rating
- 16 A
- Operate time
- < 30 ms
Lead time 1-2 weeks · Warranty 24 months · MOQ 1 nos
Arbitration & dispute resolutionChambalsurya6 variants
SampleServiceArbitration & dispute resolution Chambalsurya · CHA-762 series
- Claim value
- INR 25 lakh to INR 500 crore (see variants)
- Forum
- APTEL
- Services
- Representation
- Experts
- Technical expert
- Team
- Senior counsel and team
Lead time Proceedings 12-24 months · Warranty Fee schedule agreed at start · MOQ 1 case
Hot-gas-path parts & overhaul kitsVaigaispark5 variants
SampleHot-gas-path parts & overhaul kits Vaigaispark · VAI-188 series
- Turbine class
- 5 MW to 100 MW (see variants)
- Component
- Combustor
- Stage
- All stages
- Base alloy
- Nickel superalloy
- Coating
- MCrAlY
Lead time 20-36 weeks · Warranty 12 months · MOQ 1 set
Gas-insulated switchgear (GIS)Hoysalasudarshan4 variants
SampleGas-insulated switchgear (GIS) Hoysalasudarshan · HOY-0F1 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Rated current
- 3150 A
- Short-circuit current
- 50 kA
- Configuration
- Single bus
- Enclosure
- Steel
Lead time 20-28 weeks · Warranty 36 months · MOQ 1 bay
Panel wiring & assemblyKanchi4 variants
SampleServicePanel wiring & assembly Kanchi · KAN-2B1 series
- Panel complexity
- Up to 500 wires to Over 2000 wires (see variants)
- Panel type
- Relay panel
- Wiring standard
- IEC 61439
- Wire type
- FRLS 2.5 sq mm
- Ferrules
- Printed with numbering
Lead time 1-2 weeks · Warranty Rework of wiring defects · MOQ 1 nos
String combiner boxes & DCDBAmritsys4 variants
SampleString combiner boxes & DCDB Amritsys · AMR-C73 series
- Inputs
- 8 in 1 out to 24 in 1 out (see variants)
- Rated voltage
- 1000 V DC
- Output current
- 125 A
- Enclosure material
- SMC
- Ingress protection
- IP65
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 5 nos
Transformer oilCoorg4 variants
Coorg · COO-898 series
- Pack size
- 20 litre to 1000 litre (see variants)
- Grade
- Grade II
- Type
- Uninhibited
- BDV after treatment
- Min 60 kV
- Flash point
- Min 140 deg C
Lead time 3-7 days · Warranty Test certificate per batch · MOQ 1 litre
Feed-water pumps & heatersShivaliklumen5 variants
SampleFeed-water pumps & heaters Shivaliklumen · SHI-032 series
- Flow capacity
- 20 m3/h to 500 m3/h (see variants)
- Equipment
- Deaerator
- Discharge pressure
- 60 bar
- Stages
- 6
- Casing
- Barrel type
Lead time 10-14 weeks · Warranty 12 months · MOQ 1 nos
Primary & secondary injection kitsCoromandel6 variants
SamplePrimary & secondary injection kits Coromandel · COR-BB4 series
- Output current
- 100 A to 6000 A (see variants)
- Output voltage
- 24 V
- Duty cycle
- Short time 5 min
- Supply
- 415 V AC
- Meters
- Digital ammeter 0.5%
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 10 set
Solar & wind BoP constructionKakatiyasetu4 variants
SampleServiceSolar & wind BoP construction Kakatiyasetu · KAK-D79 series
- Project size
- 5 MW to 50 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 4 sq mm solar cable
- MV cables
- 33 kV XLPE Cu
- Inverter station
- Brick built room
Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW
Earthing & auxiliary transformersEllora5 variants
SampleEarthing & auxiliary transformers Ellora · ELL-FC3 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Type
- Station service
- Primary voltage
- 33 kV
- Secondary voltage
- 3.3 kV
- Short-time rating
- 30 s
Lead time 3-5 weeks · Warranty 18 months · MOQ 2 nos
Gas-insulated switchgear (GIS)Amaravatianant5 variants
SampleGas-insulated switchgear (GIS) Amaravatianant · AMA-7A8 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 2500 A
- Short-circuit current
- 40 kA
- Configuration
- Single bus
- Enclosure
- Aluminium alloy
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 bay
SCADA / EMS / DMS platformsAmaravati5 variants
SampleSCADA / EMS / DMS platforms Amaravati · AMA-948 series
- Points / tags
- 500 tags to 100,000 tags (see variants)
- Architecture
- Redundant servers
- Protocols
- OPC UA
- Database
- SQL
- Redundancy
- Hot standby
Lead time 12-20 weeks · Warranty 12 months support · MOQ 5 licence
Resource assessment (solar, wind, hydro)Nilgiri5 variants
SampleServiceResource assessment (solar, wind, hydro) Nilgiri · NIL-EB2 series
- Measurement duration
- Desktop study to 18 months (see variants)
- Technology
- Small hydro
- Data source
- On-site measurement
- Equipment
- Class A pyranometer station
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty As per contract · MOQ 1 report