Induction & arc furnacesDhruvmax3 variants
SampleInduction & arc furnaces Dhruvmax · DHR-F18 series
- Furnace capacity
- 3 MT to 12 MT (see variants)
- Type
- Submerged arc
- Power supply
- 12 MW
- Frequency
- 250 Hz
- Charge material
- DRI/HBI
Lead time 20-30 weeks · Warranty 18 months · MOQ 1 nos
Transformer oilKonarksamarth6 variants
Konarksamarth · KON-899 series
- Pack size
- 20 litre to Bulk 16000 litre (see variants)
- Grade
- Grade I
- Type
- Inhibited
- BDV after treatment
- Min 70 kV
- Flash point
- Min 140 deg C
Lead time 3-7 days · Warranty 12 months in sealed container · MOQ 1 litre
Asset & O&M managementUjjayiniairavat5 variants
SampleAsset & O&M management Ujjayiniairavat · UJJ-692 series
- Capacity covered
- Up to 5 MWp to Up to 500 MWp (see variants)
- Deployment
- On-premise
- Users
- 10
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty Support included for subscription term · MOQ 2 licence
Li-ion BESS containersTamramax4 variants
SampleLi-ion BESS containers Tamramax · TAM-EF8 series
- Energy capacity
- 372 kWh to 3.44 MWh (see variants)
- Cell chemistry
- LFP
- Cooling
- Air-cooled
- System voltage
- 768 V DC
- Rated C-rate
- 0.25C
Lead time 10-14 weeks · Warranty 5 years standard · MOQ 1 nos
Load-break & AB switchesKakatiya5 variants
SampleLoad-break & AB switches Kakatiya · KAK-D36 series
- Rating
- 11 kV 400 A to 33 kV 800 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Gang operated manual
- Mounting
- Pole top
- Poles
- 3P
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 5 set
Fibre optic (OPGW, ADSS)Nanditek4 variants
SampleFibre optic (OPGW, ADSS) Nanditek · NAN-322 series
- Fibre count
- 12F to 48F (see variants)
- Cable type
- Duct cable
- Fibre type
- G.652D single-mode
- Structure
- Central tube
- Short-circuit rating
- 120 kA2s
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 5 km
Conduits, boxes & fittingsAjanta6 variants
SampleConduits, boxes & fittings Ajanta · AJA-DB9 series
- Nominal diameter
- 20 mm to 63 mm (see variants)
- Material
- HDPE
- Wall class
- Medium
- Length
- 2 m
- Colour
- Grey
Lead time 1-2 weeks · Warranty As per manufacturer · MOQ 2 m
Solar & wind BoP constructionDoaba6 variants
SampleServiceSolar & wind BoP construction Doaba · DOA-A51 series
- Project size
- 10 MW to 400 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 4 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time 3-9 months execution · Warranty Defect liability 24 months · MOQ 1 MW
Ex control stations & panelsNalandaloha6 variants
SampleEx control stations & panels Nalandaloha · NAL-107 series
- Configuration
- 1 push button to Ex p panel 600x800 (see variants)
- Protection type
- Ex eb
- Enclosure
- GRP
- Rated voltage
- 24 VDC
- Rated current
- 6 A
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos
Carbon credits & offsetsDoabaampere3 variants
SampleServiceCarbon credits & offsets Doabaampere · DOA-C27 series
- Annual credits
- 1,000 tCO2e to 10,000 tCO2e (see variants)
- Programme
- Both
- Project type
- Renewable energy
- Methodology
- Baseline development
- MRV
- Annual report
Lead time Feasibility in 2-3 weeks · Warranty As per contract · MOQ 1 job
Cable drum jacks & trailersDoaba4 variants
SampleCable drum jacks & trailers Doaba · DOA-186 series
- Drum capacity
- 2 t to 8 t (see variants)
- Maximum drum diameter
- 2.2 m
- Maximum drum width
- 1.4 m
- Axle
- Single
- Jack type
- Mechanical screw
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos
Digital twins & analyticsTaxilaarc5 variants
SampleDigital twins & analytics Taxilaarc · TAX-459 series
- Plant size
- Up to 10 MW to Up to 500 MW (see variants)
- Deployment
- Cloud SaaS
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 8-12 weeks · Warranty Support as per agreement · MOQ 1 licence
Cable trays & laddersAravali6 variants
SampleCable trays & ladders Aravali · ARA-D93 series
- Width
- 50 mm to 600 mm (see variants)
- Type
- Ladder
- Material
- Mild steel
- Finish
- Powder coated
- Thickness
- 1.6 mm
Lead time 1-2 weeks · Warranty As per manufacturer · MOQ 5 m
Cable drum jacks & trailersTarangline3 variants
SampleCable drum jacks & trailers Tarangline · TAR-951 series
- Drum capacity
- 3 t to 8 t (see variants)
- Maximum drum diameter
- 2.8 m
- Maximum drum width
- 1 m
- Axle
- Single
- Jack type
- Hydraulic bottle jack
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 1 nos
CT/PT & transformer analysersDeccanarc3 variants
SampleCT/PT & transformer analysers Deccanarc · DEC-077 series
- Test channels / output
- 3-phase 10 kV to Multi-function 60 A (see variants)
- Tests
- Winding resistance
- Class tested
- PS class
- Output current
- 0-100 A
- Output voltage
- 0-2000 V
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 5 nos
Gas-insulated switchgear (GIS)Madurai5 variants
SampleGas-insulated switchgear (GIS) Madurai · MAD-D32 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 3150 A
- Short-circuit current
- 50 kA
- Configuration
- Single bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 24 months · MOQ 1 bay
InvertersVindhya6 variants
Vindhya · VIN-F78 series
- AC rated power
- 3 kW to 100 kW (see variants)
- Phase
- Three phase
- Max DC input voltage
- 1500 V
- MPPT range
- 550-1500 V
- Number of MPPT
- 6
Lead time 1-2 weeks · Warranty 10 years extended · MOQ 1 nos
Contract drafting & reviewVidarbha4 variants
SampleServiceContract drafting & review Vidarbha · VID-C21 series
- Contract value
- INR 1 crore to INR 100 crore (see variants)
- Document
- Supply agreement
- Scope
- Drafting from scratch
- Governing law
- Indian law with foreign counterpart
- Dispute clause
- Institutional arbitration
Lead time Review in 3-5 days · Warranty Professional indemnity · MOQ 1 job
Radio, RF mesh & LoRaWANKalinga3 variants
SampleRadio, RF mesh & LoRaWAN Kalinga · KAL-E45 series
- Type
- Repeater to LoRaWAN outdoor gateway (see variants)
- Frequency
- 865-867 MHz (India licence-free)
- Output power
- 27 dBm
- Range
- 3 km line of sight
- Data rate
- 250 kbps
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 2 nos
Industrial heat pumpsVindhya5 variants
SampleIndustrial heat pumps Vindhya · VIN-BF2 series
- Heating capacity
- 500 kW to 10 MW (see variants)
- Refrigerant
- R245fa
- Heat source
- Ground
- Source temperature
- 20-40 deg C
- Sink temperature
- Up to 120 deg C
Lead time 20-26 weeks · Warranty 12 months · MOQ 1 nos
Audit & accountingVindhyaamrit6 variants
SampleServiceAudit & accounting Vindhyaamrit · VIN-657 series
- Annual turnover
- INR 2 crore to INR 500 crore (see variants)
- Service
- Accounting outsourcing
- Accounting standard
- Ind AS
- Audit team
- Partner, manager, 4 staff
- Reports
- Audit report with CARO
Lead time Engagement in 1 week · Warranty Clarifications for regulators · MOQ 1 month
Lightning arresters (ESE, conventional)Malabar6 variants
SampleLightning arresters (ESE, conventional) Malabar · MAL-203 series
- Protection radius (Level III)
- 35 m to 107 m (see variants)
- Type
- ESE
- Advance time
- 60 µs
- Material
- Copper
- Mast
- 3 m GI pole
Lead time 2-3 weeks · Warranty 36 months · MOQ 5 nos
Shunt & series reactorsSamarthtek5 variants
SampleShunt & series reactors Samarthtek · SAM-2C5 series
- Rating
- 5 MVAr to 80 MVAr (see variants)
- System voltage
- 33 kV
- Type
- Neutral
- Construction
- Oil-immersed gapped core
- Phases
- Single
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Testing & commissioningOjasline6 variants
SampleServiceTesting & commissioning Ojasline · OJA-B97 series
- Plant capacity
- 5 MW to 250 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Relay test set, thermal camera
- Calibration
- NABL traceable certificates
- Team
- Commissioning engineer plus 2 testers
Lead time 1-2 weeks on site · Warranty As per contract · MOQ 1 MW