Blades & rotor partsMarwarairavat4 variants
SampleBlades & rotor parts Marwarairavat · MAR-C09 series
- Blade length
- 50 m to 70 m (see variants)
- Material
- Glass fibre epoxy
- Resin system
- Polyester
- Turbine class
- IEC S
- Root diameter
- 1.8 m
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 nos
Live-line & hot-line washingKrishna5 variants
SampleServiceLive-line & hot-line washing Krishna · KRI-AF7 series
- Voltage level
- 33 kV to 400 kV (see variants)
- Method
- Pressurised water jet
- Resistivity of water
- Above 5000 ohm-cm
- Scope
- Per bay
- Frequency
- Pre- and post-monsoon
Lead time Permit based scheduling · Warranty As per contract · MOQ 1 job
Casting & forgingAjanta5 variants
SampleServiceCasting & forging Ajanta · AJA-E18 series
- Casting weight
- Up to 5 kg to Over 500 kg (see variants)
- Material
- ADC12
- Process
- Sand casting
- Pattern
- Customer supplied
- Machining
- Rough
Lead time 3-4 weeks · Warranty 12 months against casting defects · MOQ 1 kg
Cable drum jacks & trailersDoaba5 variants
SampleCable drum jacks & trailers Doaba · DOA-185 series
- Drum capacity
- 2 t to 12 t (see variants)
- Maximum drum diameter
- 2.2 m
- Maximum drum width
- 1.4 m
- Axle
- Single
- Jack type
- Hydraulic bottle jack
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 nos
Meter test benches & CMRIAjanta6 variants
SampleMeter test benches & CMRI Ajanta · AJA-0B2 series
- Capacity
- CMRI handheld to 3-ph 6-position 0.05 (see variants)
- Reference accuracy
- 0.1%
- Voltage range
- 57.7-480 V
- Current range
- 0.001-120 A
- Source type
- Programmable electronic source
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 2 nos
Instrument transformers (CT, PT, CVT)Mauryajal5 variants
SampleInstrument transformers (CT, PT, CVT) Mauryajal · MAU-C49 series
- System voltage
- 33 kV to 400 kV (see variants)
- Type
- CVT
- Ratio
- 100-200/1 A
- Accuracy class
- 1.0
- Burden
- 30 VA
Lead time 10-14 weeks · Warranty 18 months · MOQ 10 nos
Fibre optic (OPGW, ADSS)Ojassys3 variants
SampleFibre optic (OPGW, ADSS) Ojassys · OJA-B75 series
- Fibre count
- 12F to 36F (see variants)
- Cable type
- OPGW
- Fibre type
- G.655 NZDS
- Structure
- Stainless steel loose tube
- Short-circuit rating
- 90 kA2s
Lead time 10-14 weeks · Warranty As per contract · MOQ 5 km
Electric process heaters & heat tracingHertzgen5 variants
SampleElectric process heaters & heat tracing Hertzgen · HER-204 series
- Output rating
- 10 W/m to 60 W/m (see variants)
- Type
- MI cable
- Max maintain temperature
- 400 deg C
- Max exposure
- 85 deg C
- Supply voltage
- 230 V
Lead time 2-3 weeks · Warranty 24 months · MOQ 5 m
Gas engines, CHP & cogeneration setsWayanadprabha4 variants
SampleGas engines, CHP & cogeneration sets Wayanadprabha · WAY-A89 series
- Electrical output
- 250 kW to 2 MW (see variants)
- Fuel
- Biogas
- Electrical efficiency
- 36%
- Thermal output
- 600 kWth
- Total efficiency
- 80%
Lead time 12-16 weeks · Warranty 12 months · MOQ 1 nos
Live-line & hot-stick toolsBrahmaputraurja5 variants
SampleLive-line & hot-stick tools Brahmaputraurja · BRA-396 series
- Rated voltage
- 33 kV to 400 kV (see variants)
- Material
- FRP epoxy glass tube
- Length
- 3 m
- Type
- Fixed
- Head fittings
- Clamp stick
Lead time 1-2 weeks · Warranty Re-test every 6 months recommended · MOQ 1 nos
Earth electrodes & chemical earthingMysoreakshay4 variants
SampleEarth electrodes & chemical earthing Mysoreakshay · MYS-CC8 series
- Size
- 2.5 m x 17 mm rod to 3 m x 80 mm pipe (see variants)
- Material
- Pure copper
- Coating thickness
- 80 µm galvanised (min)
- Fill compound
- Non-corrosive salt-free
- Earth resistance
- < 1 Ω in typical soil
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Lightning arresters (ESE, conventional)Jyotimark3 variants
SampleLightning arresters (ESE, conventional) Jyotimark · JYO-0E7 series
- Protection radius (Level III)
- 65 m to 107 m (see variants)
- Type
- Franklin rod
- Advance time
- 15 µs
- Material
- Copper
- Mast
- 3 m GI pole
Lead time 4-6 weeks · Warranty 10 years · MOQ 2 nos
Third-party inspection (TPI)Maduraividyut4 variants
SampleServiceThird-party inspection (TPI) Maduraividyut · MAD-969 series
- Inspection effort
- 5 man-days to 50 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Traction substations & transformersKakatiya4 variants
SampleTraction substations & transformers Kakatiya · KAK-068 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Adhesives & sealantsTungabhadra6 variants
SampleAdhesives & sealants Tungabhadra · TUN-013 series
- Pack size
- 20 g to 5 kg (see variants)
- Chemistry
- Anaerobic
- Cure time
- 5 minutes
- Colour
- Clear
- Temperature
- -40 to 200 deg C
Lead time 1-2 weeks · Warranty 12 months shelf life · MOQ 1 nos
Equipotential bondingPataliputranandi4 variants
SampleEquipotential bonding Pataliputranandi · PAT-826 series
- Capacity
- 6-way bar to Jumper 16 mm² x 300 mm (see variants)
- Bar material
- Tinned copper
- Bar size
- 100x10 mm
- Terminals
- M8 studs
- Insulators
- SMC
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 set
Factory acceptance test (FAT) witnessingKrishna6 variants
SampleServiceFactory acceptance test (FAT) witnessing Krishna · KRI-174 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day
Fleet & depot charging systemsKanchiphase5 variants
SampleFleet & depot charging systems Kanchiphase · KAN-8F5 series
- Buses served
- 10 buses to 200 buses (see variants)
- Charger rating
- 360 kW
- Charging type
- Pantograph
- Dispensers
- 10
- Power cabinet
- Shared pool, 480 kW
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 set
Home & building automationMadurai5 variants
SampleHome & building automation Madurai · MAD-0D4 series
- Channels
- 1-channel to 16-channel (see variants)
- Protocol
- Wi-Fi
- Supply voltage
- 12 V DC
- Load per channel
- 10 A
- Control
- Voice
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 5 nos
Feasibility studies & DPRSatpura5 variants
SampleServiceFeasibility studies & DPR Satpura · SAT-CD6 series
- Project capacity
- 5 MW to 500 MW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- PVsyst P50/P90
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Air compressors & dryersShivalikprakash4 variants
SampleAir compressors & dryers Shivalikprakash · SHI-339 series
- Motor rating
- 15 kW to 55 kW (see variants)
- Working pressure
- 10 bar
- Free air delivery
- 0.5 cu m/min
- Type
- Reciprocating
- Drive
- Fixed speed
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos
ACSR, AAAC & HTLS conductorsMarwar4 variants
SampleACSR, AAAC & HTLS conductors Marwar · MAR-811 series
- Conductor
- Moose to Quad Moose (see variants)
- Type
- AAAC
- Stranding
- 6/1
- Aluminium area
- 50 mm2
- Overall diameter
- 9.6 mm
Lead time 6-8 weeks · Warranty As per contract · MOQ 5 km
Tariff & regulatory advisoryKrishnavayu6 variants
SampleServiceTariff & regulatory advisory Krishnavayu · KRI-CA2 series
- Matter complexity
- Advisory note to Appeal before APTEL (see variants)
- Forum
- State Electricity Regulatory Commission
- Deliverable
- Opinion note
- Representation
- Drafting only
- Data support
- Cost data and tariff model
Lead time Petition 4-8 weeks · Warranty Free redrafting if Commission raises defects · MOQ 1 case
Charging hubs & canopiesMaduraivajra4 variants
SampleCharging hubs & canopies Maduraivajra · MAD-368 series
- Parking bays
- 8 bays to 40 bays (see variants)
- Structure
- Hot-dip galvanised steel
- Roof
- Polycarbonate
- Solar capacity
- 100 kWp
- Wind load design
- Up to 180 km/h
Lead time 8-10 weeks · Warranty 10 years on structure · MOQ 1 nos