Machining & CNCAjanta3 variants
SampleServiceMachining & CNC Ajanta · AJA-DC2 series
- Part size envelope
- Up to 100 mm to Up to 500 mm (see variants)
- Process
- HMC
- Material
- Mild steel
- Tolerance
- +/-0.05 mm
- Surface finish
- Ra 0.8
Lead time 1-2 weeks · Warranty Rework of out-of-tolerance parts · MOQ 1 nos
ERP, project & document managementBetwajyoti5 variants
SampleERP, project & document management Betwajyoti · BET-805 series
- Users
- 10 users to 250 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 4-6 weeks · Warranty 12 months support · MOQ 5 licence
Hardware fittings & dampersTungabhadrajal5 variants
SampleHardware fittings & dampers Tungabhadrajal · TUN-F12 series
- Conductor type
- Panther to Quad Moose (see variants)
- Component
- Vibration damper
- Material
- Galvanised steel
- Rated load
- 210 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Gas turbinesLohacore4 variants
Lohacore · LOH-004 series
- ISO rating
- 1 MW to 30 MW (see variants)
- Type
- Industrial
- Fuel
- Dual fuel gas / HSD
- Efficiency
- 33%
- Exhaust temperature
- 600 C
Lead time 12-18 months · Warranty Long-term service agreement · MOQ 10 nos
LED indoor & office lightingSabarmativayu3 variants
SampleLED indoor & office lighting Sabarmativayu · SAB-CA7 series
- Wattage
- 18 W to 36 W (see variants)
- Form factor
- Surface panel
- Size
- 600x600 mm
- Colour temperature
- 4000 K
- CRI
- Above 80
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Dry-type transformersThanjavurprakash5 variants
SampleDry-type transformers Thanjavurprakash · THA-ED3 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Voltage ratio
- 33/0.433 kV
- Technology
- Cast resin
- Insulation class
- Class H
- Cooling
- AN/AF
Lead time 4-6 weeks · Warranty 36 months · MOQ 1 nos
Cranes & hydrasDoaba5 variants
SampleFor rentCranes & hydras Doaba · DOA-E98 series
- Crane capacity
- 8 t hydra to 80 t (see variants)
- Boom length
- 10 m
- Operator
- Included
- Fuel
- Client scope
- Minimum hire
- 1 shift of 8 h
Lead time Same day to 1 day · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Lithium batteries for telecom & solarMaduraishakti5 variants
SampleLithium batteries for telecom & solar Maduraishakti · MAD-193 series
- Capacity
- 48 V 100 Ah to 51.2 V 200 Ah (see variants)
- Chemistry
- LFP
- Nominal voltage
- 51.2 V
- Usable energy
- 5 kWh
- Cycle life at 80% DoD
- 6000 cycles
Lead time 3-4 weeks · Warranty 10 years pro-rata · MOQ 1 nos
Traction SCADAKakatiya3 variants
Kakatiya · KAK-275 series
- Control posts
- Up to 10 posts to Up to 50 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot
Control valves & actuatorsKakatiya5 variants
SampleControl valves & actuators Kakatiya · KAK-2B1 series
- Size
- DN25 (1 in) to DN150 (6 in) (see variants)
- Valve type
- Butterfly
- Body material
- WC6 (alloy steel)
- End connection
- Flanged ANSI 150#
- Trim
- SS 316 with Stellite seat
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 5 nos
Cooling-water & boiler chemicalsArcmax3 variants
SampleCooling-water & boiler chemicals Arcmax · ARC-8C5 series
- Pack size
- 50 kg to 250 kg (see variants)
- Chemical type
- Corrosion inhibitor
- Form
- Powder
- Active content
- 30%
- pH of product
- 9-11
Lead time 3-7 days · Warranty Shelf life 12 months from manufacture · MOQ 1 kg
CT/PT & transformer analysersKamrupphase4 variants
SampleCT/PT & transformer analysers Kamrupphase · KAM-518 series
- Test channels / output
- Single channel 5 kV to Multi-function 30 A (see variants)
- Tests
- Knee point, excitation
- Class tested
- PS class
- Output current
- 0-100 A
- Output voltage
- 0-2000 V
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 10 nos
Resource assessment (solar, wind, hydro)Guptaphase6 variants
SampleServiceResource assessment (solar, wind, hydro) Guptaphase · GUP-EB2 series
- Measurement duration
- Desktop study to 24 months (see variants)
- Technology
- Small hydro
- Data source
- Satellite and reanalysis
- Equipment
- 80-120 m met mast with LiDAR
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty As per contract · MOQ 1 report
Bus post insulators & clampsMadurai5 variants
SampleBus post insulators & clamps Madurai · MAD-D74 series
- System voltage
- 36 kV to 420 kV (see variants)
- Type
- Pillar insulator
- Cantilever strength
- 6 kN
- Creepage
- 25 mm/kV
- Material
- Silicone composite
Lead time 3-5 weeks · Warranty 36 months · MOQ 10 nos
Energy auditsKamrupakshay6 variants
SampleServiceEnergy audits Kamrupakshay · KAM-511 series
- Connected load
- 100 kW to 25 MW (see variants)
- Audit level
- Detailed audit
- Instruments
- Power analyser, thermal camera
- Auditor
- Certified Energy Manager
- Report
- Implementation roadmap
Lead time Audit in 1-2 weeks · Warranty Clarifications for 6 months · MOQ 1 site
String combiner boxes & DCDBVindhya3 variants
SampleString combiner boxes & DCDB Vindhya · VIN-234 series
- Inputs
- 2 in 1 out to 6 in 1 out (see variants)
- Rated voltage
- 1000 V DC
- Output current
- 250 A
- Enclosure material
- SMC
- Ingress protection
- IP55
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos
PumpsHampi3 variants
Hampi · HAM-FB1 series
- Power rating
- 7.5 HP to 30 HP (see variants)
- Flow
- 10 m3/h
- Head
- 200 m
- Casing material
- SS 316
- Impeller
- Cast iron
Lead time 1-3 weeks · Warranty 18 months · MOQ 1 nos
Motor & transformer rewindingSutlej5 variants
SampleServiceMotor & transformer rewinding Sutlej · SUT-378 series
- Machine rating
- Up to 5 kW to 100 kVA transformer (see variants)
- Equipment
- Distribution transformer
- Conductor
- Copper
- Insulation class
- Class H
- Process
- VPI
Lead time 1 week · Warranty 12 months on rewinding · MOQ 1 nos
Isolators & earth switchesAmaravatianant5 variants
SampleIsolators & earth switches Amaravatianant · AMA-1C4 series
- System voltage
- 12 kV to 245 kV (see variants)
- Rated current
- 3150 A
- Type
- Pantograph
- Earth switch
- Without
- Short-time current
- 50 kA
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Static & modular UPSKiranmax6 variants
SampleStatic & modular UPS Kiranmax · KIR-CB9 series
- Rating
- 40 kVA to 800 kVA (see variants)
- Topology
- Modular online
- Input / output
- 3-phase in / 3-phase out
- Power factor
- 1.0
- Efficiency
- Up to 95%
Lead time 8-10 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Poles (PSC, steel, tubular)Brahmaputraanant6 variants
SamplePoles (PSC, steel, tubular) Brahmaputraanant · BRA-A47 series
- Pole length
- 8 m to 18 m (see variants)
- Type
- Swaged tubular
- Working load
- 500 kg
- Cross section
- Tapered round
- Steel grade
- Fe 410
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Lender's engineer & TEV studiesMaduraividyut6 variants
SampleServiceLender's engineer & TEV studies Maduraividyut · MAD-B25 series
- Project cost
- INR 50 crore to INR 2500 crore (see variants)
- Phase
- Operation phase review
- Scope
- Technical, cost and schedule review
- Reporting
- TEV report
- Site visits
- Monthly
Lead time 4-8 weeks for TEV · Warranty Report reliance letter to lenders · MOQ 1 report
Procurement & sourcing servicesVidarbha6 variants
SampleServiceProcurement & sourcing services Vidarbha · VID-138 series
- Procurement value
- INR 25 lakh to INR 100 crore (see variants)
- Scope
- Vendor shortlisting
- Category
- Modules and inverters
- Vendor audit
- Factory audit
- Fee model
- Fixed fee
Lead time Kick-off in 3-5 days · Warranty As per contract · MOQ 1 lot
Trade credit & export insuranceCoorg3 variants
SampleServiceTrade credit & export insurance Coorg · COO-243 series
- Insured turnover
- INR 5 crore to INR 25 crore (see variants)
- Cover type
- Whole turnover
- Cover percentage
- 90%
- Territory
- Global
- Buyer risk
- Commercial default
Lead time Policy in 1-2 weeks · Warranty Claims support · MOQ 1 job