Ash utilisationAmaravatitej5 variants
Amaravatitej · AMA-284 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 5%
- Moisture
- Below 1%
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 1 MT
CEMS & ambient air monitoringDeccanvolt4 variants
SampleCEMS & ambient air monitoring Deccanvolt · DEC-CF5 series
- Parameters monitored
- PM + SO2 to PM + gases + flow (see variants)
- Measurement method
- In-situ
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- Modbus TCP
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 set
ESP & bag filtersAwadhshikhar5 variants
Awadhshikhar · AWA-F01 series
- Gas flow rate
- 10000 Am3/h to 250000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 250 deg C
- Filter media
- PTFE membrane
- Cleaning
- Reverse air
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 5 set
Ash utilisationAmaravatitej3 variants
Amaravatitej · AMA-567 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 320 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 2%
- Moisture
- Below 1%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 1 MT
CEMS & ambient air monitoringDeccanvolt4 variants
SampleCEMS & ambient air monitoring Deccanvolt · DEC-106 series
- Parameters monitored
- PM + SO2 to PM + gases + flow (see variants)
- Measurement method
- In-situ
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- Modbus TCP
Lead time 10-14 weeks · Warranty 24 months on analysers · MOQ 2 set
ESP & bag filtersKamrup3 variants
Kamrup · KAM-F04 series
- Gas flow rate
- 250000 Am3/h to 1000000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- Polyester
- Cleaning
- Pulse jet
Lead time 20-28 weeks · Warranty 24 months on mechanical parts · MOQ 5 set
ESP & bag filtersAmaravatitej4 variants
Amaravatitej · AMA-451 series
- Gas flow rate
- 100000 Am3/h to 1000000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- PTFE membrane
- Cleaning
- Reverse air
Lead time 20-28 weeks · Warranty 12 months from commissioning · MOQ 1 set
Noise controlKamrup6 variants
Kamrup · KAM-D07 series
- Insertion loss
- 15 dB to 40 dB (see variants)
- Equipment served
- Fan
- Panel construction
- GI perforated with rockwool
- Infill
- Rockwool 100 mm
- Sheet thickness
- 2.0 mm
Lead time 3-4 weeks · Warranty 24 months against corrosion · MOQ 1 nos
Ash utilisationMahabaleshwarjoule5 variants
Mahabaleshwarjoule · MAH-5C3 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Bottom ash
- Grade
- Siliceous Grade 2
- Loss on ignition
- Below 2%
- Moisture
- Below 1%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 1 MT
SCR / SNCR NOx controlMunnarspark3 variants
SampleSCR / SNCR NOx control Munnarspark · MUN-731 series
- Flue gas flow
- 250000 Nm3/h to 1000000 Nm3/h (see variants)
- Technology
- Hybrid
- NOx removal efficiency
- 70%
- Reagent
- Aqueous ammonia
- Catalyst
- Plate type
Lead time 30-44 weeks · Warranty 24000 operating hours on catalyst · MOQ 10 set
ESP & bag filtersCoorg5 variants
Coorg · COO-2A4 series
- Gas flow rate
- 10000 Am3/h to 250000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- PPS felt
- Cleaning
- Reverse air
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 1 set
Noise controlMunnarspark6 variants
Munnarspark · MUN-D08 series
- Insertion loss
- 15 dB to 40 dB (see variants)
- Equipment served
- Transformer
- Panel construction
- GI perforated with rockwool
- Infill
- Rockwool 50 mm
- Sheet thickness
- 2.0 mm
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 nos
Ash utilisationMahanadi5 variants
Mahanadi · MAH-395 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- ESP hopper
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 5%
- Moisture
- Below 5%
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 2 MT
Flue-gas desulphurisation (FGD)Akshaymark6 variants
SampleFlue-gas desulphurisation (FGD) Akshaymark · AKS-058 series
- Boiler size
- 10 MW to 350 MW (see variants)
- Technology
- Semi-dry
- SO2 removal efficiency
- 95%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 40-60 weeks · Warranty 12 months from commissioning · MOQ 1 set
Ash utilisationCoorg4 variants
Coorg · COO-568 series
- Fly ash fineness (Blaine)
- 300 sq m/kg to 400 sq m/kg (see variants)
- Source
- ESP hopper
- Grade
- Siliceous Grade 2
- Loss on ignition
- Below 5%
- Moisture
- Below 5%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 10 MT
Ash utilisationSaurashtra5 variants
Saurashtra · SAU-463 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 2%
- Moisture
- Below 1%
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 5 MT
SCR / SNCR NOx controlSaurashtra3 variants
SampleSCR / SNCR NOx control Saurashtra · SAU-A38 series
- Flue gas flow
- 50000 Nm3/h to 250000 Nm3/h (see variants)
- Technology
- SCR
- NOx removal efficiency
- 70%
- Reagent
- Urea solution 40%
- Catalyst
- Honeycomb V2O5-WO3/TiO2
Lead time 30-44 weeks · Warranty 12 months from commissioning · MOQ 5 set
Flue-gas desulphurisation (FGD)Mahabaleshwarjoule4 variants
SampleFlue-gas desulphurisation (FGD) Mahabaleshwarjoule · MAH-405 series
- Boiler size
- 120 MW to 500 MW (see variants)
- Technology
- Wet limestone-gypsum
- SO2 removal efficiency
- 90%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Rubber lined carbon steel
Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 1 set
Ash utilisationHertzline3 variants
Hertzline · HER-286 series
- Fly ash fineness (Blaine)
- 320 sq m/kg to 400 sq m/kg (see variants)
- Source
- Bottom ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 5%
- Moisture
- Below 5%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 1 MT
ESP & bag filtersDeccanvolt5 variants
Deccanvolt · DEC-8F1 series
- Gas flow rate
- 50000 Am3/h to 1000000 Am3/h (see variants)
- Outlet emission
- Below 30 mg/Nm3
- Inlet temperature
- Up to 250 deg C
- Filter media
- PPS felt
- Cleaning
- Reverse air
Lead time 20-28 weeks · Warranty 12 months from commissioning · MOQ 1 set
ESP & bag filtersParamline5 variants
Paramline · PAR-8F6 series
- Gas flow rate
- 25000 Am3/h to 500000 Am3/h (see variants)
- Outlet emission
- Below 30 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- Polyester
- Cleaning
- Pulse jet
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 10 set
Flue-gas desulphurisation (FGD)Deccanvolt4 variants
SampleFlue-gas desulphurisation (FGD) Deccanvolt · DEC-772 series
- Boiler size
- 25 MW to 210 MW (see variants)
- Technology
- Wet limestone-gypsum
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 40-60 weeks · Warranty 12 months from commissioning · MOQ 5 set
Flue-gas desulphurisation (FGD)Saurashtra3 variants
SampleFlue-gas desulphurisation (FGD) Saurashtra · SAU-233 series
- Boiler size
- 120 MW to 350 MW (see variants)
- Technology
- Dry sorbent
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 24-36 weeks · Warranty 24 months performance guarantee · MOQ 1 set
Flue-gas desulphurisation (FGD)Saurashtra6 variants
SampleFlue-gas desulphurisation (FGD) Saurashtra · SAU-406 series
- Boiler size
- 25 MW to 500 MW (see variants)
- Technology
- Dry sorbent
- SO2 removal efficiency
- 95%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Rubber lined carbon steel
Lead time 24-36 weeks · Warranty 24 months performance guarantee · MOQ 1 set