Testing, inspection & certification

Independent testing, inspection and product certification.

Companies offering this · 20

Listings (207)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Airavatsys · AIR-091 series

Inspection effort
10 man-days to 100 man-days (see variants)
Equipment inspected
Switchgear and relays
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

by Airavatsys Engineering Services (Sample) · invoiced by BARREL

Request quote

ALMM enlistment for solar modules, Xtra series

SampleServiceProduct certification (BIS, IEC, ALMM)

Dwaraka · DWA-461 series

Certification scope
IEC 61215 and 61730 to Full global set (see variants)
Standards covered
IEC 61215 and 61730
Application support
Documentation and filing
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application

Price on quote

by Dwaraka Projects (Sample) · invoiced by BARREL

Request quote

ALMM enlistment for solar modules, Eco series

SampleServiceProduct certification (BIS, IEC, ALMM)

Airavatsys · AIR-465 series

Certification scope
ALMM List-I to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
Documentation and filing
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application

Price for verified buyers

by Airavatsys Engineering Services (Sample) · invoiced by BARREL

Request quote

Pre-compliance and test planning, Edge series

SampleServiceProduct certification (BIS, IEC, ALMM)

Malwavolt · MAL-235 series

Certification scope
Product family BIS to Multi-standard IEC set (see variants)
Standards covered
IS 14286 and IS 16077
Application support
End-to-end with lab liaison
Test lab liaison
NABL accredited labs
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Malwavolt Technical Services (Sample) · invoiced by BARREL

Request quote

ALMM enlistment for solar modules, Plus 9 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Mahanadiloha · MAH-468 series

Certification scope
Product family BIS to ALMM List-II (cells) (see variants)
Standards covered
IEC 61215 and 61730
Application support
Documentation and filing
Test lab liaison
NABL accredited labs
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application

Price for verified buyers

by Mahanadiloha Consultants (Sample) · invoiced by BARREL

Request quote

BESS container factory acceptance, Max series

SampleServiceFactory acceptance test (FAT) witnessing

Rajatcore · RAJ-9E5 series

Equipment value
INR 50 lakh to INR 10 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine plus special tests
Team
Lead engineer and assistant
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price for verified buyers

by Rajatcore Consultants (Sample) · invoiced by BARREL

Request quote

Earthing and lightning protection audit, Volt series

SampleServiceElectrical safety audits

Mahanadi · MAH-5F4 series

Installed load
10 MVA to 50 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Findings with risk rating

Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

by Mahanadi Logistics (Sample) · invoiced by BARREL

Request quote

Civil and structural stage inspection, Titan 4 series

SampleServiceThird-party inspection (TPI)

Maduraividyut · MAD-969 series

Inspection effort
5 man-days to 50 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day

Price on quote

by Maduraividyut Technical Services (Sample) · invoiced by BARREL

Request quote

FAT for GIS and switchgear, Smart series

SampleServiceFactory acceptance test (FAT) witnessing

Krishna · KRI-174 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine plus special tests
Team
Specialist engineers per discipline
Location
International factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price for verified buyers

by Krishna Infra Services (Sample) · invoiced by BARREL

Request quote

Type testing of transformers and switchgear, Prime 6 series

SampleServiceType & routine testing laboratories (NABL)

Mahanadiloha · MAH-922 series

Test class
Acceptance test to Type test (HV) (see variants)
Equipment under test
PV modules
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 400 kV
Test standard
Customer specific test plan

Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Mahanadiloha Consultants (Sample) · invoiced by BARREL

Request quote

Pre-commissioning tests for substations, Ultra series

SampleServiceSite acceptance & pre-commissioning tests

Airavatsys · AIR-1A4 series

Plant size
1 MW to 100 MW (see variants)
Scope
Solar SAT
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price on quote

by Airavatsys Engineering Services (Sample) · invoiced by BARREL

Request quote

Protection relay and secondary injection tests, Edge series

SampleServiceSite acceptance & pre-commissioning tests

Urjatek · URJ-621 series

Plant size
1 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Relay test set, IV tracer, CRM
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Urjatek Projects (Sample) · invoiced by BARREL

Request quote

SCADA and RTU factory test, Pro series

SampleServiceFactory acceptance test (FAT) witnessing

Kakatiya · KAK-DF9 series

Equipment value
INR 50 lakh to INR 25 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine plus special tests
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

by Kakatiya Logistics (Sample) · invoiced by BARREL

Request quote

Environmental and ingress protection testing, Elite series

SampleServiceType & routine testing laboratories (NABL)

Urjatron · URJ-9B3 series

Test class
Acceptance test to Short-circuit test (see variants)
Equipment under test
Cables
Accreditation
NABL plus BIS recognition
Rating range
Up to 400 kV
Test standard
Customer specific test plan

Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price for verified buyers

by Urjatron Infra Services (Sample) · invoiced by BARREL

Request quote

Kaveridhruv · KAV-687 series

Installed load
500 kVA to 10 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
Chartered engineer
Measurements
Thermography and power quality
Report
Findings with risk rating

Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site

Price on quote

by Kaveridhruv Consultants (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited