Numerical relaysShivalik6 variants
Shivalik · SHI-C42 series
- Function
- Overcurrent / earth fault to Busbar differential (see variants)
- Aux supply
- 110 V DC
- CT input
- 1/5 A selectable
- VT input
- 110 V
- Binary inputs
- 32
Lead time 3-6 weeks · Warranty 36 months · MOQ 5 nos
Furnace & rectifier transformersNilgirispark3 variants
SampleFurnace & rectifier transformers Nilgirispark · NIL-693 series
- Rating
- 10 MVA to 40 MVA (see variants)
- Primary voltage
- 66 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- LRF
- Cooling
- OFAF
Lead time 28-36 weeks · Warranty 24 months · MOQ 1 nos
Neutral grounding resistorsMewar3 variants
SampleNeutral grounding resistors Mewar · MEW-091 series
- Rated current
- 200 A to 800 A (see variants)
- System voltage
- 6.6 kV
- Resistance
- 10 ohm
- Time rating
- Continuous
- Element
- Liquid electrolyte
Lead time 4-6 weeks · Warranty 18 months · MOQ 5 nos
Battery chargers & DC systemsTejtron4 variants
SampleBattery chargers & DC systems Tejtron · TEJ-702 series
- Rating
- 100 A to 800 A (see variants)
- Output voltage
- 24 V
- Input
- 415 V 3-ph
- Topology
- SMPS
- Voltage regulation
- +/- 1%
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Tubular busbars & switchyard conductorsKanchi3 variants
SampleTubular busbars & switchyard conductors Kanchi · KAN-8B6 series
- Pipe size
- 50 mm OD to 100 mm OD (see variants)
- Material
- Aluminium AA 6101 T6
- Wall thickness
- 10 mm
- Current rating
- 2500 A
- Length available
- 10 m
Lead time 6-8 weeks · Warranty 12 months · MOQ 1 m
SF6 circuit breakersRajatline6 variants
SampleSF6 circuit breakers Rajatline · RAJ-788 series
- System voltage
- 36 kV to 800 kV (see variants)
- Rated current
- 1250 A
- Breaking current
- 25 kA
- Operating mechanism
- Spring-spring
- Operation
- Single-pole
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Numerical relaysThanjavurampere4 variants
Thanjavurampere · THA-F47 series
- Function
- Overcurrent / earth fault to Transformer differential (see variants)
- Aux supply
- 110 V DC
- CT input
- 1/5 A selectable
- VT input
- 63.5 V
- Binary inputs
- 8
Lead time 3-6 weeks · Warranty 36 months · MOQ 1 nos
Compact secondary substationsTamratek5 variants
SampleCompact secondary substations Tamratek · TAM-329 series
- Transformer rating
- 100 kVA to 1000 kVA (see variants)
- Primary voltage
- 22 kV
- Secondary voltage
- 0.69 kV
- HV equipment
- Ring main unit
- Transformer type
- Cast resin dry
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Traction substations & transformersKalinga5 variants
SampleTraction substations & transformers Kalinga · KAL-D45 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Isolators & earth switchesKanchi5 variants
SampleIsolators & earth switches Kanchi · KAN-C72 series
- System voltage
- 12 kV to 245 kV (see variants)
- Rated current
- 2000 A
- Type
- Centre rotating
- Earth switch
- With 1 earth switch
- Short-time current
- 25 kA
Lead time 6-8 weeks · Warranty 24 months · MOQ 10 nos
Bay control units & gatewaysTejtron4 variants
SampleBay control units & gateways Tejtron · TEJ-CA5 series
- I/O capacity
- 16 DI / 8 DO to 128 DI / 64 DO (see variants)
- Analog inputs
- 0
- Protocols south
- IEC 60870-5-103
- Protocols north
- DNP3.0
- Interlocking
- Bay and station level
Lead time 4-6 weeks · Warranty 24 months · MOQ 2 nos
Poles (PSC, steel, tubular)Mahanadi3 variants
SamplePoles (PSC, steel, tubular) Mahanadi · MAH-A42 series
- Pole length
- 13 m to 18 m (see variants)
- Type
- GRP
- Working load
- 140 kg
- Cross section
- Octagonal
- Steel grade
- Fe 410
Lead time 2-3 weeks · Warranty 12 months · MOQ 2 nos
Traction substations & transformersLumengen5 variants
SampleTraction substations & transformers Lumengen · LUM-912 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 2 nos
ACSR, AAAC & HTLS conductorsGodavari4 variants
SampleACSR, AAAC & HTLS conductors Godavari · GOD-D48 series
- Conductor
- Rabbit to Wolf (see variants)
- Type
- ACSR
- Stranding
- 54/7
- Aluminium area
- 400 mm2
- Overall diameter
- 9.6 mm
Lead time 3-5 weeks · Warranty As per contract · MOQ 5 km
Transformer monitoring (online DGA, bushing monitors)Jalline4 variants
SampleTransformer monitoring (online DGA, bushing monitors) Jalline · JAL-ED7 series
- Gases monitored
- Single gas (H2) to 9 gases (see variants)
- Gases measured
- H2, CO
- Technology
- Gas chromatography
- Measurement interval
- 4 hours
- Accuracy
- +/- 10%
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Power transformersJalline5 variants
Jalline · JAL-D24 series
- Rating
- 10 MVA to 100 MVA (see variants)
- Voltage ratio
- 66/11 kV
- Cooling
- ONAN/ONAF
- Vector group
- YNyn0 d11
- Tap changer
- OLTC 1.25% steps
Lead time 16-24 weeks · Warranty 36 months from supply · MOQ 1 nos
Hardware fittings & dampersAwadh6 variants
SampleHardware fittings & dampers Awadh · AWA-0D4 series
- Conductor type
- Dog to Quad Moose (see variants)
- Component
- Earthwire clamp
- Material
- Forged aluminium alloy
- Rated load
- 210 kN
- Slip strength
- 95% of RBL
Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos
Surge arresters (station class)Mewar6 variants
SampleSurge arresters (station class) Mewar · MEW-FF7 series
- System voltage
- 12 kV to 420 kV (see variants)
- Rated voltage
- 330 kV
- Nominal discharge current
- 10 kA
- Line discharge class
- Class 2
- Housing
- Polymer
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
OHE masts, cantilevers & catenaryMahanadi5 variants
SampleOHE masts, cantilevers & catenary Mahanadi · MAH-F54 series
- Mast type
- Double track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos
Dry-type transformersNarmadapushpak5 variants
SampleDry-type transformers Narmadapushpak · NAR-8B2 series
- Rating
- 500 kVA to 5000 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Technology
- Cast resin
- Insulation class
- Class F
- Cooling
- AN/AF
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
Bus post insulators & clampsCoromandelphase3 variants
SampleBus post insulators & clamps Coromandelphase · COR-3E3 series
- System voltage
- 12 kV to 72.5 kV (see variants)
- Type
- Pillar insulator
- Cantilever strength
- 10 kN
- Creepage
- 25 mm/kV
- Material
- Silicone composite
Lead time 3-5 weeks · Warranty 24 months · MOQ 5 nos
Distribution transformersAjantajyoti3 variants
SampleDistribution transformers Ajantajyoti · AJA-5B9 series
- Rating
- 100 kVA to 315 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Vector group
- Dyn11
- Cooling
- ONAN
- Energy efficiency level
- Amorphous
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 1 nos
Shunt & series reactorsAwadhakshay6 variants
SampleShunt & series reactors Awadhakshay · AWA-755 series
- Rating
- 10 MVAr to 200 MVAr (see variants)
- System voltage
- 765 kV
- Type
- Neutral
- Construction
- Air-core dry
- Phases
- Three
Lead time 40-50 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Station batteries (Ni-Cd, VRLA)Taxila4 variants
SampleStation batteries (Ni-Cd, VRLA) Taxila · TAX-A03 series
- Capacity
- 300 Ah to 1000 Ah (see variants)
- Chemistry
- Flooded lead-acid
- Nominal cell voltage
- 1.2 V
- Number of cells
- 90
- Bank voltage
- 220 V
Lead time 6-8 weeks · Warranty 60 months pro-rata · MOQ 1 nos