Industrial & hazardous-area lightingAgnimark6 variants
SampleIndustrial & hazardous-area lighting Agnimark · AGN-C89 series
- Wattage
- 40 W to 240 W (see variants)
- Protection concept
- Ex d flameproof
- Gas group
- IIA
- Zone
- Zone 1
- Temperature class
- T4
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 1 nos
Wind turbine O&MDoaba6 variants
SampleServiceWind turbine O&M Doaba · DOA-249 series
- Fleet size
- 5 turbines to 150 turbines (see variants)
- Scope
- Availability based O&M
- Turbine class
- 2-2.5 MW
- Availability guarantee
- 97% availability
- Technician team
- Site manager plus 2 technicians per 5 turbines
Lead time Takeover in 4-6 weeks · Warranty Availability guarantee with LD · MOQ 1 nos
String combiner boxes & DCDBKalingagaruda3 variants
SampleString combiner boxes & DCDB Kalingagaruda · KAL-2B7 series
- Inputs
- 4 in 1 out to 8 in 1 out (see variants)
- Rated voltage
- 1000 V DC
- Output current
- 400 A
- Enclosure material
- Polycarbonate
- Ingress protection
- IP66
Lead time 1-2 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Earthing & auxiliary transformersKonark3 variants
SampleEarthing & auxiliary transformers Konark · KON-FC2 series
- Rating
- 1000 kVA to 3150 kVA (see variants)
- Type
- Station service
- Primary voltage
- 33 kV
- Secondary voltage
- 0.433 kV
- Short-time rating
- 10 s
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Relay test kitsPallavasamarth3 variants
Pallavasamarth · PAL-B53 series
- Output channels
- 3 voltage + 3 current to 6 voltage + 6 current (see variants)
- Current output
- 64 A parallel
- Voltage output
- 0-300 V
- Frequency range
- DC to 1 kHz
- Accuracy
- 0.05%
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 5 set
Thermal energy storageNalanda4 variants
SampleThermal energy storage Nalanda · NAL-9C5 series
- Storage capacity
- 100 kWh-th to 5 MWh-th (see variants)
- Storage medium
- Chilled water
- Operating temperature
- 250-400 deg C
- Charge source
- Chiller
- Discharge output
- Steam
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 kWh
Tower parts, bolts & nutsBrahmaputrasamarth3 variants
SampleTower parts, bolts & nuts Brahmaputrasamarth · BRA-B59 series
- Bolt size
- M12 to M20 (see variants)
- Strength class
- 8.8
- Material
- Mild steel
- Galvanising
- Hot-dip, 75 micron
- Thread
- Metric coarse
Lead time 2-4 weeks · Warranty 12 months · MOQ 1 MT
Insulated hand tools (1000 V)Mahabaleshwarohm6 variants
SampleInsulated hand tools (1000 V) Mahabaleshwarohm · MAH-BA3 series
- Kit size
- 5 pieces to 40 pieces (see variants)
- Rated voltage
- 1000 V AC
- Material
- Chrome vanadium
- Insulation
- Dual layer injection moulded
- Handle colour
- Orange
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 set
DG & equipment rentalAravali5 variants
SampleFor rentDG & equipment rental Aravali · ARA-2C9 series
- DG capacity
- 30 kVA to 500 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Client scope
- Enclosure
- CPCB IV+ canopy
- Operator
- Not included
Lead time Same day to 1 day · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Rack PDUs & buswayThanjavurdhruv6 variants
Thanjavurdhruv · THA-9E4 series
- Current
- 16 A to 400 A (see variants)
- Type
- Busway
- Phase
- 1-phase
- Outlets
- 24 x C13
- Voltage
- 415 V
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 1 nos
Skilled technicians & electriciansTapti6 variants
SampleServiceSkilled technicians & electricians Tapti · TAP-9F1 series
- Team size
- 5 persons to 200 persons (see variants)
- Trade
- Instrument technician
- Qualification
- Diploma
- Experience
- 5-10 years
- Compliance
- Contract labour licence
Lead time Deployment in 7-14 days · Warranty Replacement at no cost for unsuitable workers · MOQ 1 man-month
Battery recycling & second lifeBrahmaputra4 variants
SampleServiceBattery recycling & second life Brahmaputra · BRA-2A2 series
- Quantity
- 0.5 tonne to 10 tonnes (see variants)
- Chemistry
- Lead-acid
- Process
- Hydrometallurgy
- Second life
- SoH test and grading
- Recovery rate
- 95% for metals
Lead time Processing 2-8 weeks · Warranty Authorisation copies available · MOQ 1 tonne
Power conversion systems (PCS)Taxila4 variants
SamplePower conversion systems (PCS) Taxila · TAX-5E2 series
- Rated power
- 50 kW to 500 kW (see variants)
- DC voltage range
- 700-1200 V
- AC output voltage
- 400 V
- Topology
- Two-level IGBT
- Peak efficiency
- 98.8%
Lead time 8-10 weeks · Warranty 5 years standard · MOQ 1 nos
Geotextiles & slope protectionJalsys6 variants
SampleGeotextiles & slope protection Jalsys · JAL-314 series
- Mass per unit area
- 100 gsm to 600 gsm (see variants)
- Material
- Polyester
- Construction
- Geocell
- Roll width
- 5 m
- Roll length
- 50 m
Lead time 3 weeks · Warranty 12 months from supply · MOQ 2 sq m
Casting & forgingMahanadi6 variants
SampleServiceCasting & forging Mahanadi · MAH-A45 series
- Casting weight
- Up to 1 kg to Over 500 kg (see variants)
- Material
- WCB steel
- Process
- Die casting
- Pattern
- Made by foundry
- Machining
- Rough
Lead time 3-4 weeks · Warranty Replacement of defective castings · MOQ 1 kg
Power semiconductors (IGBT, SiC, thyristors)Kaveri5 variants
SamplePower semiconductors (IGBT, SiC, thyristors) Kaveri · KAV-501 series
- Rating
- 1200 V / 150 A to 4500 V / 1200 A (see variants)
- Device type
- Phase control SCR
- Topology
- Chopper
- Package
- Press-pack
- Isolation voltage
- 2.5 kV
Lead time 12-20 weeks · Warranty 24 months from supply · MOQ 1 nos
Gas & water analysersShivalik4 variants
SampleGas & water analysers Shivalik · SHI-916 series
- Parameter
- Conductivity to Silica (see variants)
- Measurement range
- pH 0-14
- Accuracy
- ±0.01 pH
- Output
- RS-485 Modbus
- Sample flow
- 100-500 mL/min
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Factory acceptance test (FAT) witnessingKakatiyarajat4 variants
SampleServiceFactory acceptance test (FAT) witnessing Kakatiyarajat · KAK-D82 series
- Equipment value
- INR 50 lakh to INR 10 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day
Rack PDUs & buswayUjjayini6 variants
Ujjayini · UJJ-E62 series
- Current
- 16 A to 400 A (see variants)
- Type
- Busway
- Phase
- 1-phase
- Outlets
- 24 x C13
- Voltage
- 230 V
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 10 nos
Testing & commissioningTarangline3 variants
SampleServiceTesting & commissioning Tarangline · TAR-B95 series
- Plant capacity
- 5 MW to 25 MW (see variants)
- Tests covered
- String IV curve, insulation, earth
- Instruments
- Relay test set, thermal camera
- Calibration
- Calibration valid at test date
- Team
- Lead plus 5 member crew
Lead time Mobilisation in 5 days · Warranty As per contract · MOQ 1 MW
Charging management softwareAwadh3 variants
SampleServiceCharging management software Awadh · AWA-6F9 series
- Charge points
- Up to 500 to Up to 10000 (see variants)
- Deployment
- Cloud SaaS
- OCPP versions
- 1.6J
- Payments
- Subscription
- Roaming
- OCPI 2.1.1
Lead time 4-6 weeks · Warranty 12 months updates included · MOQ 1 licence
ERP, project & document managementMarwarswarna3 variants
SampleERP, project & document management Marwarswarna · MAR-808 series
- Users
- 10 users to 50 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 10-16 weeks · Warranty Support with AMC · MOQ 5 licence
Live-line & hot-stick toolsCoromandeljyoti5 variants
SampleLive-line & hot-stick tools Coromandeljyoti · COR-206 series
- Rated voltage
- 11 kV to 220 kV (see variants)
- Material
- FRP pultruded
- Length
- 4.5 m
- Type
- Insulating ladder
- Head fittings
- Universal head
Lead time 3-4 weeks · Warranty Re-test every 6 months recommended · MOQ 1 nos
Mounting structures & trackersRavi4 variants
SampleMounting structures & trackers Ravi · RAV-5F6 series
- Structure type
- Rooftop metal sheet to Seasonal tilt (see variants)
- Material
- HDG steel
- Zinc coating
- 80 micron
- Design wind speed
- 50 m/s
- Module tilt
- Site latitude
Lead time 4-6 weeks · Warranty 10 years against corrosion · MOQ 2 kWp