Transformer NIFPSAravalijal5 variants
Aravalijal · ARA-578 series
- Transformer oil volume
- Up to 10 kL to 60-100 kL (see variants)
- Principle
- Nitrogen injection and drain
- Nitrogen cylinders
- 5 x 68 L
- Operating pressure
- 150 bar
- Oil drain valve
- Pneumatic
Lead time 12-16 weeks · Warranty 36 months from commissioning · MOQ 5 set
Feasibility studies & DPRMagadh5 variants
SampleServiceFeasibility studies & DPR Magadh · MAG-231 series
- Project capacity
- 1 MW to 100 MW (see variants)
- Scope
- Feasibility with financial model
- Energy yield
- PVsyst P50/P90
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report
Pre-engineered buildings (PEB)Pennarsarvam5 variants
SamplePre-engineered buildings (PEB) Pennarsarvam · PEN-F89 series
- Clear span
- 18 m to 45 m (see variants)
- Primary frame
- Hot-rolled section
- Steel grade
- IS 2062 E350
- Roof sheeting
- Insulated PUF panel
- Wall cladding
- Brick below 3 m
Lead time 6-8 weeks · Warranty 20 years sheet coating (limited) · MOQ 1 sq m
DCIM softwareUjjayini3 variants
SampleServiceDCIM software Ujjayini · UJJ-6E4 series
- Scope
- Up to 100 racks to Up to 500 racks (see variants)
- Licence type
- Annual subscription
- Deployment
- SaaS
- Monitoring points
- Up to 500
- Protocols
- Modbus TCP
Lead time 1-2 weeks · Warranty Updates for 12 months · MOQ 1 licence
Fans & ventilationMadurai3 variants
Madurai · MAD-D07 series
- Sweep
- 450 mm to 900 mm (see variants)
- Fan type
- Ceiling
- Motor
- Induction
- Power
- 750 W
- Speed
- 1400 RPM
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
LOTO kits & signageTaxila5 variants
SampleLOTO kits & signage Taxila · TAX-773 series
- Kit size
- Personal kit to Plant LOTO station (see variants)
- Padlocks
- Keyed different
- Padlock body
- Aluminium
- Shackle
- 6 mm steel
- Breaker lockouts
- MCB, MCCB, ACB
Lead time 3-4 weeks · Warranty 12 months · MOQ 5 set
GI & copper stripsPrakashline5 variants
Prakashline · PRA-D39 series
- Size
- 40x5 mm GI to 50x6 mm Cu (see variants)
- Material
- Electrolytic copper 99.9%
- Galvanising
- Hot-dip, min 70 µm
- Zinc coating
- IS 4759
- Current rating
- Fault current 1 s rated
Lead time 1-2 weeks · Warranty Material conformity per test certificate · MOQ 1 m
Product certification (BIS, IEC, ALMM)Rajatcore4 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Rajatcore · RAJ-B81 series
- Certification scope
- Single product BIS to ALMM List-II (cells) (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Freight forwarding & customs clearanceMalwavolt3 variants
SampleServiceFreight forwarding & customs clearance Malwavolt · MAL-0E4 series
- Shipment size
- 40 ft container to Project cargo (see variants)
- Mode
- Multimodal
- Customs services
- Duty planning and classification
- Incoterm
- DAP
- Permits
- BIS, WPC, import licences
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
STATCOM & SVGShivalik5 variants
Shivalik · SHI-593 series
- Rating
- 100 kVAr to 3 MVAr (see variants)
- Voltage
- 33 kV
- Topology
- Cascaded H-bridge (MV)
- Response time
- < 10 ms
- Compensation
- Capacitive and inductive, bidirectional
Lead time 16-24 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Boiler & turbine sparesPataliputraneel3 variants
SampleBoiler & turbine spares Pataliputraneel · PAT-C81 series
- Unit size
- 210 MW to 660 MW (see variants)
- Component
- Mill spares
- Tube material
- SA 210 A1
- Blade material
- 17-4 PH
- OEM compatibility
- Alstom type
Lead time 4-8 weeks · Warranty 18 months · MOQ 5 set
Insulation & tan delta testersKamrupsamarth5 variants
SampleInsulation & tan delta testers Kamrupsamarth · KAM-CD3 series
- Maximum test voltage
- 1 kV to 12 kV (see variants)
- Resistance range
- Up to 15 Tohm
- Tests
- Tan delta, capacitance
- Display
- Colour TFT
- Power supply
- Rechargeable battery
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Guarding & security servicesTaptisetu6 variants
SampleServiceGuarding & security services Taptisetu · TAP-256 series
- Guards deployed
- 2 guards to 100 guards (see variants)
- Guard type
- Ex-servicemen
- Shifts
- 12-hour
- Supervision
- Field officer per 20 guards
- Licence
- PSARA licence
Lead time 1-2 weeks · Warranty As per contract · MOQ 1 month
Circuit-breaker analysersDeccan5 variants
SampleCircuit-breaker analysers Deccan · DEC-B93 series
- Timing channels
- 3 channels to 18 channels (see variants)
- Time resolution
- 0.05 ms
- Travel transducer
- Rotary
- DC contact resistance
- 200 A
- Coil current
- Measured
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 nos
Energy auditsMalwa3 variants
SampleServiceEnergy audits Malwa · MAL-397 series
- Connected load
- 500 kW to 5 MW (see variants)
- Audit level
- Investment-grade audit
- Instruments
- Power analyser, thermal camera
- Auditor
- Certified Energy Manager
- Report
- Implementation roadmap
Lead time Audit in 1-2 weeks · Warranty Clarifications for 6 months · MOQ 1 site
GPS clocks & time synchronisationKutchvayu3 variants
SampleGPS clocks & time synchronisation Kutchvayu · KUT-AC7 series
- Output set
- NTP + IRIG-B to PTP grandmaster (see variants)
- Time source
- GPS
- Accuracy
- ±1 µs
- Network protocols
- NTP v4
- PTP profile
- Power profile C37.238
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Auxiliary, trip & timer relaysPrabhatron5 variants
SampleAuxiliary, trip & timer relays Prabhatron · PRA-A16 series
- Coil voltage
- 24 V DC to 230 V AC (see variants)
- Relay type
- Lockout 86
- Contacts
- 4NO + 4NC
- Contact rating
- 16 A
- Operate time
- < 30 ms
Lead time 3-4 weeks · Warranty 24 months · MOQ 5 nos
Station batteries (Ni-Cd, VRLA)Chola4 variants
SampleStation batteries (Ni-Cd, VRLA) Chola · CHO-DF2 series
- Capacity
- 300 Ah to 1000 Ah (see variants)
- Chemistry
- Ni-Cd
- Nominal cell voltage
- 2 V
- Number of cells
- 110
- Bank voltage
- 110 V
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos
Multimeters, clamp meters & insulation testersSetucore6 variants
SampleMultimeters, clamp meters & insulation testers Setucore · SET-953 series
- Maximum current / voltage range
- 600 A to 1000 V DC (see variants)
- Measurement
- Capacitance
- Display count
- 6000
- Accuracy
- 0.5%
- Safety rating
- CAT IV 600 V
Lead time 3-7 days · Warranty 12 months from supply · MOQ 2 nos
Refurbished & used equipmentNalanda4 variants
SampleUsedRefurbished & used equipment Nalanda · NAL-566 series
Like new · made 2019
- Equipment rating
- 500 kVA to 10 MVA (see variants)
- Condition
- Refurbished
- Age
- 5-10 years
- Test report
- Full routine test
- Voltage class
- 33 kV
Lead time 3-5 weeks · Warranty 12 months for overhauled units · MOQ 1 nos
Substation constructionSabarmati6 variants
SampleServiceSubstation construction Sabarmati · SAB-4C6 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Type
- Outdoor AIS
- Scope
- Civil and structural
- Transformers
- Up to 50 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay
Welding consumablesKanchi6 variants
SampleWelding consumables Kanchi · KAN-E78 series
- Electrode / wire diameter
- 2.5 mm to 1.2 mm wire (see variants)
- Classification
- E71T-1
- Coating
- Basic low hydrogen
- Current type
- DC+
- Tensile strength
- Min 420 MPa
Lead time 1-2 weeks · Warranty 12 months shelf life in sealed pack · MOQ 5 kg
Contact & messenger wiresKalinga3 variants
SampleContact & messenger wires Kalinga · KAL-0F5 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km
Lightning arresters (ESE, conventional)Mysoreojas5 variants
SampleLightning arresters (ESE, conventional) Mysoreojas · MYS-606 series
- Protection radius (Level III)
- 45 m to 107 m (see variants)
- Type
- Faraday cage
- Advance time
- 15 µs
- Material
- Aluminium
- Mast
- 3 m GI pole
Lead time 2-3 weeks · Warranty 10 years · MOQ 10 nos