Engineering & designVindhya3 variants
SampleServiceEngineering & design Vindhya · VIN-A26 series
- Plant capacity
- 5 MW to 25 MW (see variants)
- Deliverables
- Design basis report plus drawings
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Lead engineer plus 3 designers
- Turnaround
- 10-12 weeks
Lead time 3-4 weeks · Warranty Design correction at no cost for 12 months · MOQ 1 job
EHV & HV cablesMaurya5 variants
Maurya · MAU-B37 series
- Rating
- 66 kV 1C x 630 sq mm Al to 220 kV 1C x 1200 sq mm Al (see variants)
- Conductor
- Milliken copper
- Insulation
- XLPE (triple extruded)
- Metallic screen
- Lead alloy sheath
- Outer sheath
- MDPE
Lead time 16-24 weeks · Warranty As per contract · MOQ 1 km
Pellet & briquetting machinesIndraprastha5 variants
SamplePellet & briquetting machines Indraprastha · IND-AD1 series
- Capacity
- 100 kg/h to 2 TPH (see variants)
- Machine type
- Screw briquetter
- Product size
- 50-90 mm briquette
- Feedstock
- Groundnut shell
- Motor power
- 37 kW
Lead time 8-12 weeks · Warranty 18 months on motor · MOQ 2 nos
Wind resource assessment (met masts, LiDAR, SoDAR)Neelline5 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Neelline · NEE-FF8 series
- Measurement height
- 80 m to 200 m (see variants)
- Instrument type
- Met mast
- Mast construction
- Lattice
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 3
Lead time 4-6 weeks · Warranty 24 months on logger and sensors · MOQ 2 set
Transformer NIFPSJhelumfaraday3 variants
Jhelumfaraday · JHE-571 series
- Transformer oil volume
- 10-20 kL to 40-60 kL (see variants)
- Principle
- Nitrogen injection and drain
- Nitrogen cylinders
- 5 x 68 L
- Operating pressure
- 150 bar
- Oil drain valve
- Pneumatic
Lead time 12-16 weeks · Warranty 36 months from commissioning · MOQ 1 set
DC fast chargersTaptinandi4 variants
Taptinandi · TAP-6A4 series
- Rated power
- 180 kW to 480 kW (see variants)
- Connector
- CCS2 + GB/T
- Output voltage
- 200-750 V
- Output current
- Up to 500 A
- Number of guns
- 1
Lead time 8-10 weeks · Warranty 24 months · MOQ 2 nos
Traction substations & transformersLumengen3 variants
SampleTraction substations & transformers Lumengen · LUM-569 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Substation automation (IEC 61850)Sabarmatideep5 variants
SampleSubstation automation (IEC 61850) Sabarmatideep · SAB-084 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- DNP3
- Network topology
- Dual star
- HMI
- Redundant servers
Lead time 10-14 weeks · Warranty 36 months · MOQ 1 lot
DC fast chargersMaduraivajra3 variants
Maduraivajra · MAD-155 series
- Rated power
- 30 kW to 120 kW (see variants)
- Connector
- CCS2
- Output voltage
- 200-750 V
- Output current
- Up to 500 A
- Number of guns
- 2
Lead time 8-10 weeks · Warranty 24 months · MOQ 2 nos
PLCC & wave trapsNarmada4 variants
Narmada · NAR-681 series
- Rating / band
- Wave trap 400 A to Wave trap 2000 A (see variants)
- System voltage
- 66 kV
- Frequency band
- 24-500 kHz
- Inductance
- 0.2 mH
- Blocking impedance
- > 570 Ω
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 10 nos
Industrial routers, switches & firewallsSahyadri6 variants
SampleIndustrial routers, switches & firewalls Sahyadri · SAH-C41 series
- Ports
- 5 ports to 28 ports (see variants)
- Port speed
- 10/100 Mbps
- Redundancy protocol
- RSTP
- Layer
- Layer 2
- PoE
- IEEE 802.3at
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Hydro turbines (Francis, Kaplan, Pelton)Magadhshikhar4 variants
SampleHydro turbines (Francis, Kaplan, Pelton) Magadhshikhar · MAG-AA4 series
- Turbine output
- 1 MW to 10 MW (see variants)
- Turbine type
- Pelton
- Net head
- 30-200 m
- Rated speed
- 500 rpm
- Shaft orientation
- Vertical
Lead time 10-14 months · Warranty 24 months from commissioning · MOQ 2 nos
Cable drum jacks & trailersAwadhanant4 variants
SampleCable drum jacks & trailers Awadhanant · AWA-919 series
- Drum capacity
- 1 t to 5 t (see variants)
- Maximum drum diameter
- 2.8 m
- Maximum drum width
- 1.4 m
- Axle
- Tandem
- Jack type
- Mechanical screw
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 1 nos
Live-line & hot-stick toolsKaverigrid4 variants
SampleLive-line & hot-stick tools Kaverigrid · KAV-8A3 series
- Rated voltage
- 11 kV to 132 kV (see variants)
- Material
- FRP pultruded
- Length
- 3 m
- Type
- Fixed
- Head fittings
- Universal head
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Geotextiles & slope protectionMalabaranant3 variants
SampleGeotextiles & slope protection Malabaranant · MAL-3E1 series
- Mass per unit area
- 200 gsm to 400 gsm (see variants)
- Material
- Polypropylene
- Construction
- Needle punched non-woven
- Roll width
- 5 m
- Roll length
- 100 m
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 sq m
Static & modular UPSMysorearc3 variants
SampleStatic & modular UPS Mysorearc · MYS-CB3 series
- Rating
- 10 kVA to 40 kVA (see variants)
- Topology
- Eco mode capable
- Input / output
- 1-phase in / 1-phase out
- Power factor
- 1.0
- Efficiency
- Up to 95%
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 2 nos
Partial discharge & VLF testersVijaya4 variants
SamplePartial discharge & VLF testers Vijaya · VIJ-D46 series
- Test voltage (VLF peak)
- 28 kV to 60 kV (see variants)
- Test frequency
- 0.1 Hz
- Waveform
- Cosine rectangular
- Max load capacitance
- 0.5 microF
- PD sensitivity
- Below 5 pC
Lead time 8-14 weeks · Warranty 12 months from supply · MOQ 1 set
Stringing machinesBundel5 variants
Bundel · BUN-217 series
- Maximum tension
- 30 kN to 150 kN (see variants)
- Type
- Tensioner
- Drive
- Electric
- Bullwheel diameter
- 1500 mm
- Conductor size
- Twin Moose
Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Precision coolingNarmadakavach4 variants
Narmadakavach · NAR-DC6 series
- Cooling capacity
- 5 kW to 25 kW (see variants)
- Type
- Chilled water
- Airflow
- Upflow
- Compressor
- Not applicable
- Fan
- Backward-curved EC
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 2 nos
LT power cablesMysore3 variants
Mysore · MYS-9F9 series
- Size
- 3.5C x 240 sq mm to 4C x 400 sq mm (see variants)
- Voltage grade
- 1.1 kV
- Conductor
- Copper
- Insulation
- XLPE
- Armour
- Galvanised steel wire
Lead time 1-2 weeks · Warranty As per contract · MOQ 1 m
Charging cables & connectors (CCS2, Type 2)Kanchiphase6 variants
SampleCharging cables & connectors (CCS2, Type 2) Kanchiphase · KAN-DD4 series
- Current rating
- 32 A to 500 A (see variants)
- Connector standard
- GB/T
- Cable length
- 7.5 m
- Phases
- 1-phase
- Rated voltage
- 250 V AC
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Charging management softwareKanchiphase3 variants
SampleServiceCharging management software Kanchiphase · KAN-FA9 series
- Charge points
- Up to 25 to Up to 500 (see variants)
- Deployment
- Private cloud
- OCPP versions
- 2.0.1
- Payments
- UPI
- Roaming
- OCPI 2.1.1
Lead time 4-6 weeks · Warranty As per SLA · MOQ 1 licence
Insulated hand tools (1000 V)Phasetek3 variants
SampleInsulated hand tools (1000 V) Phasetek · PHA-E45 series
- Kit size
- 8 pieces to 18 pieces (see variants)
- Rated voltage
- 1500 V DC
- Material
- Chrome molybdenum
- Insulation
- Dipped
- Handle colour
- Orange
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 set
Wind turbine O&MTrishulcore6 variants
SampleServiceWind turbine O&M Trishulcore · TRI-262 series
- Fleet size
- 5 turbines to 150 turbines (see variants)
- Scope
- Availability based O&M
- Turbine class
- 3 MW and above
- Availability guarantee
- 97% availability
- Technician team
- Local crew plus rope-access team
Lead time Takeover in 4-6 weeks · Warranty Work warranty 6 months · MOQ 1 nos