Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Power system dispatch simulator, Elite 9 series

SampleServiceSimulators & e-learning

Sahyadriakshay · SAH-B54 series

Licensed users
100 users to 500 users (see variants)
Product type
Desktop simulator
Content
Substation switching and faults
Languages
Regional languages
Assessment
Certificate on completion

Lead time Deployment in 2-3 weeks · Warranty Software updates for licence term · MOQ 1 nos

Price on quote

by Sahyadriakshay Engineering Services (Sample) · invoiced by BARREL

Request quote

Mobile GIS substation, Max series

SampleMobile substations

Tamratek · TAM-7D6 series

Transformer rating
20 MVA to 63 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
11 kV
Chassis
Low-bed trailer
Primary switchgear
GIS bay

Lead time 16-24 weeks · Warranty 36 months · MOQ 1 nos

Price for verified buyers

by Tamratek Transformers (Sample) · invoiced by BARREL

Request quote

Stepped tubular pole, Max series

SampleLighting poles & arms

Deccan · DEC-AB3 series

Height
6 m to 11 m (see variants)
Pole shape
Octagonal
Material
Steel tubes IS 1161
Wall thickness
3.65 mm
Galvanising
Hot dip 120 micron

Lead time 2-3 weeks · Warranty 24 months against corrosion · MOQ 1 nos

Price for verified buyers

by Deccan Luminaires (Sample) · invoiced by BARREL

Request quote

Protection relay testing and settings, Duo 6 series

SampleServiceTesting & commissioning

Shaktimax · SHA-A85 series

Plant capacity
10 MW to 50 MW (see variants)
Tests covered
Transformer, switchgear, relay tests
Instruments
Relay test set, thermal camera
Calibration
Calibration valid at test date
Team
Lead plus 5 member crew

Lead time Mobilisation in 5 days · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW

Price on quote

by Shaktimax Technical Services (Sample) · invoiced by BARREL

Request quote

Ball valve, Max series

SampleValves, pipes & fittings

Pallava · PAL-9F9 series

Nominal bore
150 NB to 300 NB (see variants)
Body material
Cast iron
Pressure class
PN 16
End connection
Screwed
Operation
Hand wheel

Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 2 nos

Price for verified buyers

by Pallava Cranes & HVAC (Sample) · invoiced by BARREL

Request quote

Glass, aluminium and silicon recovery, Elite series

SampleServiceSolar module recycling

Beasphase · BEA-F14 series

Quantity
1 tonne to 10 tonnes (see variants)
Process
Thermal and chemical recovery
Recovery rate
85%
Materials recovered
Silicon, silver
Authorisation
Registered recycler

Lead time Processing 2-8 weeks · Warranty As per authorisation · MOQ 1 tonne

Price on quote

by Beasphase Advisory (Sample) · invoiced by BARREL

Request quote

Gantry crane, Ultra series

SampleEOT & gantry cranes, hoists

Teslaline · TES-7F3 series

Capacity
3 t to 50 t (see variants)
Span
25 m
Duty class
M3
Hoisting speed
4 m/min
Lift height
12 m

Lead time 10-12 weeks · Warranty 18 months from supply · MOQ 5 nos

Price for verified buyers

by Teslaline Cranes & HVAC (Sample) · invoiced by BARREL

Request quote

Yaw drive and brake set, Volt series

SamplePitch & yaw systems

Thanjavur · THA-497 series

Turbine class
1.5 MW to 5.0 MW (see variants)
System type
Yaw drive
Motor
AC servo
Backup supply
Lead-acid battery
Gearbox
Planetary 1:200

Lead time 10-14 weeks · Warranty 24 months · MOQ 1 set

Price for verified buyers

by Thanjavur Wind Power (Sample) · invoiced by BARREL

Request quote

Land bank development with lease agreements, Eco 6 series

SampleServiceLand identification & aggregation

Swarnaline · SWA-0F5 series

Land requirement
50 acres to 2500 acres (see variants)
Land type
Private agricultural land
Acquisition mode
Long-term lease
Screening
Forest and eco-sensitive screening
Documents
7/12 extracts, mutation, maps

Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre

Price for verified buyers

by Swarnaline Logistics (Sample) · invoiced by BARREL

Request quote

Sabarmatisamarth · SAB-9A5 series

Plant size
Up to 100 MW to Portfolio > 1 GW (see variants)
Deployment
Hybrid edge
Data ingestion
SCADA, historian, IoT
Models
Physics-based + machine learning
Analytics
Loss attribution, anomaly detection

Lead time 8-12 weeks · Warranty Support as per agreement · MOQ 5 licence

Price for verified buyers

by Sabarmatisamarth Digital Systems (Sample) · invoiced by BARREL

Request quote

Gantry crane, Max 3 series

SampleEOT & gantry cranes, hoists

Amaravati · AMA-7F6 series

Capacity
1 t to 32 t (see variants)
Span
10 m
Duty class
M3
Hoisting speed
4 m/min
Lift height
12 m

Lead time 10-12 weeks · Warranty 18 months from supply · MOQ 1 nos

Price on quote

by Amaravati Mechanical Works (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited